HomeMy WebLinkAboutCorrespondence & Additional DocsDave Argo
From:
Dave Argo
Sent:
Thursday, July 27, 2017 5:06 PM
To:
Bruce Barth (brace@redhousearchitecture.com)
Subject:
Zeder Residence - Four Mile Ranch
Bruce: faGrcrva 0m 7/*17
1 am currently eviewing plans for Steve Zeder's new SF residence located in Four Mile Ranch, Lot 25. However, before
we can issue uilding permit for this project we will need to receive the following items-.
Site Specific Soils Report—A plat note on the final plat for this subdivision specifically calls for submission of a
soils report "prior to issuance of a building permit".
• Engineered Site Grading & Drainage Plan — Another plat note requires all Four Mile Ranch lots to include a "site
grading & drainage plalprepared and certified by a Professional Engineer".
We will continue with our plan r iew, but unfortunately won't be able to finalize our review or issue a permit until we
receive these supplemental items.
(:;Zccctv4 Ovr 45/e/17
Thanks for your attention to this matter.
Dave Argo
Plans Examiner
CGarfield Cowity
Community Development Department
108 816 Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212
Email dorgo@gorfield-county.com
Web: garfield-county.com
CONFIDENTIALITY NOTICE_ This email communication and any files transmitted olong with it are intended only for the person or entity to which it is
addressed. If you have received this email in error, please immediately notify the sender by email and delete it from your files.
Garfield County
COMMUNITY DEVELOPMENT
108 Eighth Street. Suite 401. Glenwood Springs CO 81601
Tel (970) 945-8212. Fax (970) 384-3470
BUILDING PLANS SUBMITTAL
XInformation Requested by Plans Examiner
❑ Information Requested by Inspector
❑ Revisions to Approved Plans
BUILDING PERMIT #: POL91� - 61- - l- - q& 1_2_
Description of work, including changes to approved plans:
till
Contact Information:
Contact Name: BYIA C& kVt h
Job Address:
Phone: ff tt r
Cell:
E-mail: YU��@ �( �m-e (' TM
Plan Review Fee: ($50.00perhour) P6 CiAA.V, .G •.• s' it im rwi•GW .
Logged by:
Dave Argo
From:
Sent:
To:
Dave Argo
Friday, July 28, 201711:09 AM
'Bruce Barth'
Subject: RE: Zeder Residence - Four Mile Ranch
me,,.c Ok 6/11117
Bruce:
i+
Thanks for sending over a copy of the soils report.
Another item that has come up in my plan review is that the building code referenced on the Structural Engineer's
drawings is the 2009 IRC which is no longer valid in Garfield County. We'll need to receive verification from the Engineer
that design complies with 2015 IRC which was adopted in July 2016. An email confirmation sent direct to me will suffice.
Unless the HOA goes through an amended final plat process to amend, delete or otherwise change the plat notes for
this subdivision, our office has no other available course but to require that all homeowners comply with all plat notes. I
can tell you that (2) other recent building permit applications out in Four Mile Ranch also had to comply with this
requirement before we issued a building permit for their projects.
We'll look forward to receiving the Structural Engineer's verification about the 2015 IRC and your follow-up submission
of an Engineered Site Grading & Drainage Plan.
Thanks,
Dave Argo
Plans Examiner
CGarfield Count) -
Community Development Department
108 816 Street, Suite 401
Glenwood Springs, CO 81601
Tel: 970-945-8212
Email: dargo@gaifield-tounty.cam
Web: garfield-county.com
CONFIDENTIALITY NOTICE: This email communication and any files transmitted along with it are intended only for the person or entity to which it is
addressed if you have received this email in error, please immediately notify the sender by email and delete it from your files.
From: Bruce Barth (mailto:brute@redhousearchitecture.com]
Sent: Friday, July 28, 2017 9:12 AM
To: Dave Argo <dargo@garrield-county.com>
Subject: Re: Zeder Residence - Four Mile Ranch
Dave —Soils report is attached and I am working on the grading/drainage plan. Just a heads up, I asked Nic Senn and
Greg Kontour from the 4 -Mile Ranch HOA and they were unaware of the plat note and thought others have not been
required to have an engineered plan for permit so you may get a little pushback down the line.
Talk to you soon, Bruce
From: Dave Argo <dareo@earfield-county.com>
Date: Thursday, July 27, 2017 at 5:06 PM
To: Bruce Barth < bruce@ red housearchitecture.com>
Subject: Zeder Residence - Four Mile Ranch
Bruce:
I am currently reviewing plans for Steve Zeder's new SF residence located in Four Mile Ranch, Lot 25. However, before
we can issue a building permit for this project we will need to receive the following items:
• Site Specific Soils Report—A plat note on the final plat for this subdivision specifically calls for submission of a
soils report "prior to issuance of a building permit".
• Engineered Site Grading & Drainage Plan—Another plat note requires all Four Mile Ranch lots to include a "site
grading & drainage plan prepared and certified by a Professional Engineer".
We will continue with our plan review, but unfortunately won't be able to finalize our review or issue a permit until we
receive these supplemental items.
Thanks for your attention to this matter -
Dave Argo
Plans Examiner
. Garfield Catchy
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, C081601
Tel; 970-945.8212
Email: darao@.aorfieid-county.com
Web- garfield-county.com
CONFIDENTIALITY NOTICE: Ms email communication and ony files transmitted along with it are intended only for the person or entity to which it is
oddressed. If you have re -eived this email in error, please immediately notify the sender by email and delete it from your files.