Loading...
HomeMy WebLinkAboutApplication- PermitMb Address No. 5828 GARFIELD COUNTY BUILDING, SANITA77ON aid PLANNING DEPARTMENT 109 8th Street Sully 303 Glenwood Springs, Colorado 81601 (303) 945-8212 0330 County Road 250, Silt Nature or Work Building Permit Use of Building Single Family Dwelling w/Double Garage & Single Carport Owner Monte Senor Coolraelor Robert Gordon Amount of Permit 5 2.602.46 Permit: 1577.25 Plan : 1025.21 Paid $963.46 3-6-96 Date March 28, 1996 S. Archuleta Clerk BUILDING PERMIT APPLICATION /k GARFIELD COUNTY, COLORADO Y Applicant to comp ate numbered spaces only. PERMIT NO. star PARCEUSCHEI7 NO. JOB ADDRESS V r.J Jc LC EeL AGREEMENT n_ c`Y c^ J 0% S DESCR. *e/)r3LOCK .SUBDIVISION /44 adna / L x/.943 2 OWNER „-�CtiLz„Z ADDRESSUJ.J(� 4, � �H.176 -- WK. PH, J D 7 —zfl z 3 ,J%p% CONTRACTOR 4 /- ' I ticked/ ADDRESS Peer...”i 1f.e PF :Sens— LICENSE NO. 4 ARCHITECT OR DESIGNER Abrok ADDREssAce— ,t PH, leCCs LICENSE NO. 5 ENGINEER riJe1/ .S nc/�.iaa.. ci/ ADDRESS (4t eadi - PH. :(7� LICENSE NO. 6 S.F OF BUILDING 32C,...09G L/ • `yj. OF LOT get HEIDI-12 j NO. OF FLOORS Aikra i- 7 /7S.F USE OF BUILDING S/kyle 07///7 '' et roper C ,2j9i> Cr 441+0 WC CoO.C.: 'y, fl -4/ 8 CUSS OF WORK!1.7148/ oo ADDITION oAL'/T/E�RATIION oREPAIR oMOVE in REMOVE 9 71- DESCRIBE WORK _Cdie FT,.../ 10 GARAGE SINGLE DOUBL CARP SINGLEDOUBLE DRIVEWAY PERMIT�3 44 ONSITE SEWAGE DISPOSAL PERMI11/ SITE PLAN /1-,4!/j1, �� VALUATION OF WORK:$c/g7i'z,ye) ADJUSTEDVAL.$ 4�,..'FZ��7 Z O ft 2l PLAN CHECK FEE 9g I, PERMIT FEE i�,/ 7 ?• •ry,.�; 3, SPECIAL CONDITIONS: SCHOOL IMPACT FEE FEE.," NO. OF BUILDINGS ON PARCELnp USE OF BUILDINGS NOW ON PARCEL TOTAL FEE ?95 ?, 4/4 OCC. OR/L-3, (f^/ CONST.STTYPEY Ill NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK I5 SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE LOCAL LAW REGULATING CONSTRUCTION OR THE P RFCRMANCE CONSTRUC <Dale/ eat- J i WATER SUPPLY DATE PERMIT ISSUED Jp "%� _. HEATING, SREcwL APPROVALS REQUIRED RECEIVED Nor REWIRED ISZONING 1/' WORK IS KNOW TO GIVE OR OF HEALTH DEPT. FIRE DEPT. SOIL REPORT SETBACKS FLOOD HAZARD Signature of. (Owner, Contractor or authorized agent hhioe . i,i exid no ice above. 3-154 MANUF. HOME _are 'Aiding Department Approve/dot / Planning Department Ap. rre;OTHER S. ISO OS- AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY ANO THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garform.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE IINITIAL �. 1 GARFIELD COUNTY BUILDING AND PLANNING MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION MANUFACTURED HOMES ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information niay be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling construction under the Uniform Building Code. This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are required to indicate appropriately and to submit completed check list at time of application for a permit: 1 1. Is a site plan included that indicates the distance of the proposed building or addition to property lines, other buildings, set back easements and utility easements? Yes _ No n) Not necessary for this project (2) 2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties) , streams or water courses? Yes No _ 2j_0) Not necessary for this project (2) 3. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes __; No n, Not necessary for this project (2) 4. Do We plans inc de a fountation plan indicating the size, location and spacing o • a11 reinforcin steel in accordance with the uniform � building cod or per stampe engineered design? Yes No _yr_„, 1(Iot necessary for this project (2) S. Do the planslndirate-theellocation and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No n, Not necessary for this project _ 6. Do the plans indicate the size an location of ventilation openings for the attic, roof joist spaces and soffits? Yes __ No n, Not necessary for this project (2) 7. Do the plans include design loads as required under the Uniform Building code for roof snow loads, ( a minimum of 40 pounds per square foot in Garfield County) floor loads and wind loads? Yes No u) Not necessary for this project (2) 8. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes No n, Not necessary for this project (2) 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes __ No n, Not necessary for this project (2) 2 10. Does the building section. drawing or other detail include the method of positive connection of all colurnns and beams? Yes No (t) Not necessary for this project (2) 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes No (t) Not necessary for this project () 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes __)C_ No (i) Not necessary for this project (2) 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No y. (1) Not necessary for this project __ (2) 14. Does the plan include a window schedule or other verification that tiOt egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes __ _ No (i) Not necessary for this project (2) 15. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes __y_,No o, Not necessary for this project (2) 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes _n No (i) Not necessary for this project (2) 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes __ * No (i) Not necessary for this project (2) 18 Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from that association, if required by that association, prior to submitting an application for a building permit? Yes No (I) Not necessary for this project __ ez, 3 19. Have two (2) complete sets of constructions drawings been submitted with t!Le application? Yes No (u Not necessary for this project (2) 20. Is this an application for the placement of a manufactured home? Yes If yes, have you specified the size of the unit (min. 20ft x 20ft); live roof load (min.40#); wind design (min. wind speed of 80 mph & 15 Ib. wind load); foundation design; method of anchoring? Yes No n, Not necessary for this project (2) 21. Have you designed or had this plan designed while considering buiidin and other construction code requirements? Yes No 22. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield Building Department? Yes No (3) 23. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes No ()), 24. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School impact" or "Septic system " fees required, at the time you pick up your building permit? Yes �C No (3) 25. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection_prior to receiving a Certificate of Occupancy and occupancy of the building? Yes _ `�_ No (3) 26. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the application is the party responsible for the project complying with the Uniform Codes". Yes No (3) (CONTINUED ON NEXT PAGE) 4 I hereby acknowledge that l have read, understand and answered these questions accurately to the best of my ability. signa ure date Phone: o2$4 2 33 2(days); $7L - ;Do -5 (evenings) Project Name:SGl b� taurtc-t_ Project Address: 0330 co\ 250 Notes: (1) If you have answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to he expected. Work may not proceed without the issuance of the permit. (2) If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building ONicial that the information is necessary to review the application and plans Lo determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and ttie application rotates again to first position for review. B. Delay in Issuance of the permit. Delay in proceeding with construction. (3) If you answered "No" to this question the circumstances described in tite question could result in a "Stop Work Order' being issued or a "Certificate of Occupancy" not being Issued. PerApp02.95 Effective August 15, 1995 5 52 7 uocsuaA /NvisoN! /COOT N ~ D (ID o n n it C m m 0 D m t Iflhi!" e e ItxflhiiZidi POI F' rsS�H 0111041 m 0y n-1 mmaly mm 0=+ 00100 maim .-1 mm -1o00 r. -a m o ti Z m o 0 nm n mn A ati zm >0 xzxzx ma � 0(1 m 00.+ n wm ..111 311rmin Nn ▪ '1z�C- no cm .+01 2.-121 -1 a ---otic 00 z0 \o x01 m am Illo< m NO ▪ 40.. Z0r02 N.C-1 00 001 crcma mm J3 MZ 0>m00 m 01 MT MEOW 7 00 I A0 CC m 0.= -00>0101 9 Z O ‚40 31mm 1+01-1 1J mm ZAm0Z ,,,-ow N n o M 01 1 a 0 201 .T.A0IW ».m. 'm ii promo m amz .. m a.0+0m NW m 0.+A0 000 0 n zti.. mom N n N Z N N m ma N m o Lon V DC C_Lmti mAo0 marry r mm000 n0 am JJm m wn nm PUM %N%%1% m .0-10c c 10 041 t4111 (1110 n 14 001 a cam -1 a 01 TT0 C I 1 z Z NSW 3S'I-dOSOI C0m omm 0 07.7 0101(0 A A (n 4140 T V T T TTI m mm 40 4040 r rr -u TT NVdS 11VH3A0 0 -0 -SE 0 t (010 -0 a 11 11 n 1111= CNNwd CLOW* *00*0000 00(0(0 w N.IIR 11II II 0 3 WNW ..r n o c 0 0 C wr 0 U 00 sr (0 1 .r-1 n r <Jr Lnw mm 0111 >or En n- 0 00 mom o w'a 71 0NON 0000. 0100 n r c 072/7 NO 03SV0 NOII 00 - • NO1N o3 0(00 r 0010 0 nn o 0. r0 11 0 000 . v 040 000 0- om y11 i. > r T xr 01 001 J T 0 N -CO Z n Jm X a am ZGI ti m 1 1333A1/ TAUSFAB/ Version A.25 0 n1 rn 0 1posik iO I f 0--1 011 •1.. 00 -IC 2N IIDH r w L ro7 0S 0001 1./10 1 nn .--1X X) M=010 -,m 01- n101 1 C 11nm 1� n mm 00101 We rarl 00) 1- 011 1000 2 n i r D r c. m I-1S0XI'' 01 1-1 -4. X7 T]'Lnf]C 010 -1 (/1 TO zmoo -10 Z rr 0-1 01 �+ w• 77' 0 mz] 017 mrn2 Z] n1 10 001 ro m 0 ❑ m 01 rc • m>m> SzzZS o--1 17 Glp nf1�-)rn • NN 0r) r m Onr-. H m XI m N 04.x1 01 Oo i-• 01 — lois 32rmN —0 m 1 1 m 1--1 N• n Z 0 1-1 I HD IVC 3 .- .- n DZ 10 NNIUN H 3-1n 0111-.Z-1 0 07 1V10 r 00) ).( Wx x 11 2 0. 101 (n Qy 111Mo .-1mL r- i C fR Fru. -1 m H p0 1 xi -(C 01N 77 D 1) >r is L 0/0)2 0100 Z 00.- 1/1 \0 201 0. N 5 a 11Om mm0H NOC [!1 r- In [I1 X...1 ID (c Z 01 rt ID F1 N%)aN 110>1-1 Z> N 1-+01 n rt NH a -1 1]G7 rn2 D-4 S IV .-1 N• - .- n 00 20 0 000 crrw> HjT{ 0 mxl 0) 1m011> 3 rnZ = MC>0 0>0100 ra 0 !T 4-1 010)011 DI mm Nr-10 0NN Na Z :T.01 000 1-i .+n o0 x) mfr 1 xi cu • r mm 01 n Zlmn Ci. 0 n (f) -� 2 -I n m m w a Z 1 0 1 1 0 170 11 01 n2 N 1-1r1x]Ll) m 01 K -1--lm-1 .- • 1�1-.In 7, ON 2n9•--' z.77mmz 2 La LI0tri 17 n 0 1--1 < 1 (Il 1 D a >K 01 S V III CL C_!R 7 I rN:00 n m Omm 13 i --,or) 37wSN Z S 7' 3 0 000 0< 2-I TI z0 -m 2n H 0 m N N NNN r* co 01 0 --47 [7 XI Ulm o D m !TI ' ` .Z] X1 .T7 1-+ , nrnnN 04-11) m -1 7�- ID a0. (1 Naga of-1� Cpl o 1:0 133 0 `� n , 0 01 01 - m r. m Nm ul a I 0 Cm Ill m O 11 (A rN 1``' co H Z 0 OV o X 2 11 11 a • 1 1 0 11Y 3A0 0 -0 -TE ID Z fU 0 4 0 F 10 w --1 --4 -1 1 -1 -1 -1 0 01 r 11.1 11) 11 u 11 11 11 11 11 11 I 1 1 1 n 10 V •- V to 01 N 1P m 11] N 61 V V IV ILJJ CU 07 ID 09mm Co 0 01 01 0 Wgown11 rr 0 0 01. Ed C4 rn rn Ln Mtn L)1 I31 01 0 D '1 0 01 0 0011 c - r 01000 U] LO V U110 .- I U7 11 11 11 Il ll r m f00mcDrd - W m 01 r - m u] �-• 01 010 mIll 11 11 11 11 r to LII 0 .-1m01- r1) nnnn i• -•n 0000a-srrrr c Vr,- rum 7 01 �. r t1) Orn ..o ID 1- N 7 a 1 . OII07m Nm.. -3 I-4- '4 P. CD C) rr .VrOOY 0001 o. r rnC 1.1000010) 000 TIO 01 FOF r0 a m O N (1 -1 01100100110 0 -4'001-,•T1 0 • • • 7 I .-100a0.. LL) 01w m .- 1- > 0 101010 N 0) 40 111 40 m 01 o 0 0 0 0 0 • n n 0 04000101 Z 0000"3m r. 17 rr-..tern.- wow 11) F 0 0 0 0 n 0 0 0 0 0000 01 CLC 011.1. O2 N�- 0m Zn n 11-1 0 3f p r r 11 m Xr 1 D 91 1� m 11 XI 7 01 O N N- m -1 N CI m Z 01 ,-• 01 7 0 G] H a n m 0 0 L n x] Z r m -r 1333A2/ TRUSFAS/ Version 4.25 O OD O a 0 m n 0 m D n 0 n-1 n-1 ma Ox 0m aH c run • mamm -I nm D C VIN N N nan N n a Y cin muu ma Zo 0o am ~. 1010)-1 00 00 02 0)z N mm mn 00 0= 0O 0C 11 mm Ma OH a Z aa < 0< Sy Z m • m 0)0 c mm m Qo 0 p 1 N 0) n 01 m O 1 0 w 1 Nr0 MZ 1 NVdS TWU3A0 0 -0 -if N N 00Anm 100000 Culnm -1000 zZO2•• ma0 9 nm 0) z 012-1 3vrmL1 Tz.L-1 mz.12 3J\0 -1 C SM In0< m 2C>11 1110)rn2 crcmn nnmom mom 1 3] m 11Tamm Z 1-1 T m Z M l n 1r N700 0100001 r121w2N • 310 H SV320 nWrnZ u-.001 Z 010.00 -4- zHZ I+N 1N m ▪ 0 I+ V 1111111$:; aM 1111111103ocmno w InA 0x 0 • '110-10 -100 >mz moo m D m 01 VI •N N X Cl mo z nN z C TO ZN 0 AD .1-1 011 a on N r =CO 0)n DD TM MZ10 m O -IrHVL E- amznx mx < 1 m m MD 21010031 2 nn1mm n MN -10 MO <• 0 n LZ M 21110 0-1 znz -izwml .z o m r c 0101 • nom -0 a-12] C 2 S H m o aim mmzmz a 0 mm r T n ma a> mir-1D >a 1100H<m 1100 rn 0nzm on Z N -1' x 01 H 100001 >Tzr-1 r Nm r-1 >0 >X 210 time rz O n-<0 -111 m • C1H1nz 1010,1 W ZZ 0 G3H3V1IV GNIGVNG m 00 m nam z m 0)n n Z -1 no Jmm-1 J N 0 N imimM 00 N m m• m 310-13 roma maa an r 4- am0 0 z 0 O7 M . 3 n o m 0 a mm 0 0031 Z r0) 0 r u N 021 0 O m 0 •O T LLm_.1 LQ 010 mw. - 1 1 10011 NOW 4-001 0113 D 000 m 000 Doo LL 52'n ua?$Jan /BVJSNW! /SEES al 01 Fa c CD N C 8 co m IJ n 0 m C N O i] N N 0 [n 0 Si LO o nn 7 n z 01 0 O (0 m NVdS llVtl3AO 0 -0 -LI m 0 0 0 0 1 m mnti 00A.2tm a1 0 LW -10 2 H 0100 O m m CO 0 00 or CVm a 0 1 n<mT P TW -1000 TL r- 2 a A •_ v n n c Cu • MO H 2000 mZ A=2 n MA A ay 20 2Cum M 01000 a ac 22222 -IN ma am 2N NM m 0r1 A m0021 Wm N 3 m r m i 3 w w nII o L H2NC II111nn0 JN( a %-0 �' CM u -1 mz..n -1 00ti Sl\m-IC A mmm 00 0 01 N O< W 0 00L/10 z z z -n K W 21CI. n 00 W. 21 m r n x 0 N. .- n mm crams OM MA ] 3 mz namom 2 mm (m111m1iin- V mm mom 0 2 coo.. 00 I Am 0 ul+ T mmmO a= n m 1 mm a A Z 1 ...W W 1 I( 2 m0 IIC Am ti 10010-1 ...VI 11 m21W10 TTz m 01010(/1 ma on 011 > 111(11(1 0 2 1 r N A O 2 m T m 7< (0 2� 1-jmw=01 0 =011 222 14 ' 2 • 20210 N 01 AAA = m 1Tz o s.. -OT Z Ino m 0..na -1 color VU13 00 0 ZH._M r 010101 -111111 N 01 TTM W N W m 0 mmr 10f1 V -TIM-0 sx m l0 Han nr <1r m mo 0 (11 r„ > o ou • a 00 Ou"b m Ta til r 000 mao 0 rc H1.. a =..ao o0 m 3 s 0 W 0 m o ma a o- z r0 A r M N m C oW 0 001 C W N 0000 001001 0000 141(1301 W N N m N 0000 oWWW aNaN 0 NU0 AnI 10 NNO WW 00 mmm 0 M u n 111 3 N N 000 Ww17 0300 2 Ot m mo CM Mt 2m n ti r r A xr ,m �m 0 0 (0 0. 2 .z. 2 DO n 2 s A ZH m 1333C/ TRUSFA6/ Version 4.25 O 0 m 0 0 a 0 0 0 m n 01 WEE 11V83A0 0-0-92 O p O m w N m I➢ m N N ny n-1 0Wm a.. . It= l-1 0x 00l nn =00 0culnm 0Nm 0HV cY RIN -I0ao r. -a mo x p.. a 11nnc n CO y Z 0 a s ti z m 01 0 00 m J. 01 lcn 01 0 0 -4 "'a ro a a n N m m N S N r m N m 0 mz�L-. no XX)( In + Cvl ..m Z..n -I x 01 03 I-1 n\cl tic a to Nn 2 0 2 0 0 a \ N o m N 0< 01 m 00 z i m DR n. N Uc ati 113 a r n x P-44 1-1 00 Ny nN-0 GI crcma M tim ma 03Irl mm 0NmoN m CU1 Inti ni 0 0 I ) CO w w LO m o o nJ 0101amm aZ L II IIz I00 II X010 LONmti I+N na o.N. 0100101 om C . a z I (-woo 041101 r- a0 Haonm in Eh o -13 0< 2-1 ACN IN -1 N NNN IC 2 . 2t n0 m 23 2:1 M Nm2 D. l -.mm Nw C • 0.. n0 V Vr vn n n z m m a)0)m mm m Z N N N \\ N N m Imn N - 0 rr Ion V -0 -0 0 x CO CO 002) 0 WN n II II 11 0 3 N.•N 0101 CO E-) N•- 01 r On. o6 ro0 1-1 nr <Ir NW• ma N 11 D 0 • 0 n 0I O CuJ 010 01 m m 11 r a --I n m o m moa n rc u0 .- o I 0 ) N N N 03 CIDP r 0010 0 01 ID n0 0 r 01 01 000 UO.0 072/1 NO 03SVS NOI 00 Z ti.+ r m x ra 0 0 0 .N. 0 -<z H. 2 Dm n 2 a a an a r m 1 fi�ai lr :� W it YiLikIs SU Y uic USLCOO THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GIFIELD COUNTY, COLORADO Date Issue .11.Zoned Area Permit No..'a� .. AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described tructure, the permit may then be revoked .by notice from the County Building Ins Use r kr)ME UTEL4014 We NULL AND VOID. ead 14 Address Legal o `D cription 0 # }/ ems Owner O t� e.. 0 10 i . Contractor o be 1 Setbacks Front Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing = 9 3 - `L N «aT t ", , _n_ r/7-. Q Foundation .9-n c/, 3tJp Underground Plumbing Insulation 2'1 _ 9 (y fr Rough Plumbing ,S_6 To , Drywall (e—m_7(I cam% Chimney & Vent -/e _ y,6 c�LlL --Electric Final (by State Inspector)7i -10&s -- Gas Piping - 16--9 -i--d t: -Final at 7 -JF, -7r ,7-4,2:o Electric Rough (By State Inspector)3 ` ? Septic Final 7 /s 7 379 AE Framing c--51 4, .Tzk'c (To include Roof in place and Windows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 945-8212 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVED DO NOT DESTROY THIS CARD Dates By