HomeMy WebLinkAbout2401ti5 .,ter; .t..,
i 142 002401 • .
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue,
Glenwood Springs, Colorado 81601 '
303) 945-8241./ (303) 625.3321
Job Address Lots 6,9,20,21, Section 35, T6S,R &9@
Nature of Work Building Permit •
Use of Building ` °°
Beer Warehouse /Distribution
Owner Orri son Distributing Co.
Contractor The Neenan Company
Amount of Permit: $ _1 Date:March 3, 1982
Patsy J._ Tenney
Clerk
BUILDING PERMIT APPLICATION
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2e Avenue
Glenwood
014 Blak
Springs Colorado 81601
945 -8241 / 625 -3321
Garfield County, Colorado, 19.52,-
Owner.TZ /z / a,-/-?2,-,),..)77A/(.S% /2/) )7 /A/l 60 .
Contractor or Builder:7 i/ A/A c-)i.-7/' 7 .4-i1/2/
Location:GoA ( 9
2
L1 / S e ,-Ai or? 3y
Purpose for which building is to be used: _ 73& V\hi - `:: g S7 / Z/i)J ' 76W
Size of Lot:L; 41.)iC- s
Distance of building from property line at A _ /
Front:0 Rear:19 Left Side:Right Side:
Distance from nearest buildin g :Number of stories:
Source of water supply:V\/e//Number of rooms:
Type of sewage disposal:S f Type of foundation: C " >76, /"e'7?
Width of building:11-i (Material in outside walls:E (-.e / r e.:, ,,,,7,-,/
Length of building:1 /Exterior finish:4"7c
Height of walls:t
r
Type of roof: f /! . 1 `'. /
Floor space in square feet:2. 9 000 /
Estimated value: $ -2''000
Date construction will begin:Date of completion:
Permit charge: $ 2—0
Plan check fee: $ - 7 2 7 - 0
TOTAL: $ / 3 r/' ,Q
And I /We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused byb uc on said building.
Respectfully,z—ill
The County Commissioners hereby grant the above permit as per terms therein stated. This day of
fil /T 4 19E
BUILDING OFFICIAL
j0 CALCULATION FOR ROOF /CEILING
LINE TABLE R -1 ROOF /CEIEI G ARE S S. T
1. GROSS ROOF AREA 2.7
2. SKYLIGHT AREA
3. ROOF VFNT AREA
4, OTHER (SPECIFY)
5. NET (OPAQUE) ROOF AREA TABLE R -4 FRAMING AND CAVITY RATIO
LINE 1 - SUM 2 THRU 42_ ?FRAME FRAMING CAVITY
6. FRAMING AREA (Afr)SPACING RATIO I RATIO
1 INF 5 Y TARI F R-4 1111.111111 0.13 0.87
7. CAVITY AREA (Ac)I 11 0.90
1INF 5 X TABLE R -4 0.1 I.1 0.94
TABLE R -2 OPAQUE ROOF /CEILING CALCULATIONS
HEATINGSOURCEOF1ROOF /CEILING
THERMAL MATERIALS WINTER R- VALUES
RESISTANCE FRAMING 1 CAVITY
8. OUTSIDE AIR FILM a
9. EXTERIOR FINISH
10. OUTSIDE SHEATHING
11. F;AMI "G.
12. INSULATION S c,.- t l
13. CAVITY AIR SPACE
f14. INTERIOR FINISH
C l15. INSIDE AIR FILM
16. OTHER (SPECIFY)
17. OTHER (SPECIFY)
18. TOTAL RESISTANCE (
SUM OF LINES 8 THRU 17
4., r4
19. Ufr (FRAMING)d - )23 1
1 /R1 (FRAMING COLUMN)
20. UC (CAVITY)
1 R CAVITY COLUMN
F R -3_ w: 1 1 d 1 1 1: : 1
SOUET -U- AI I1F PO l A I
CAVITY IIIIIIIIIIIIII LINE 20.
IIIMMEMIMIIIIIMIIII 1 R
ROOF VENT 1111111111111 1 R
1 1 R LINE 4. IIIIIIIIIIIIIII
OTHER 11111111111 1/R 11111.11 LINE 5.
0i A,=4) SUM UXA=0"-I
Up ROOF /CEILING SUM OF (U- VALUES X CORRESPONDING AREAS) =a f /
GROSS ROOF CEILING ARE A
Uo CALCULATION FOR FLOOR rr.. a:. •(4 .-5, ,/,
7
r
LINE TABLE F -1 FLOOR AREAS SQ. FT.
1. GROSS FLOOR AREA
TABLE F -421'FRAMING AND CAVITY RATIO
2. FRAMING AREA (Afr)JOIST FRAMING CAVITY
L1NE 1 X TABLE F -4 RATIORARATIOTSPACING
3. CAVITY AREA I2..0.13 0•u7
LINE 1 X TABLE F -4 0.10 0.90
24"0.064. OTHER (SPECIFY)1t."0.94
5. OTHER (SPECIFY)
TABLE ~ F-2 FLOOR CALCULATIONS FLOOR
HEATING
SOURCE OF WINTER R- VALUES
THERMAL MATERIALS FRAMING CAVITY
RESISTANCE
6. OUTSIDE AIR FILM MIIIIIIIIIIIIIIIIIIIIMIIIIIIMMIIIIII111.11. 1M111 " 1 " 11111111111111 NsinEXTERIORFINISH
MIMI
9. CAVITY INSULATION
10. CAVITY AIR SPA OIMINMMIIM
11. DLOING
12. FLOOR FINISH IIIIIIIIIMIIIIII""
13. INSIDE AIR FILM
14. OTHER SPECIFY
C ;15. OTHER SPECIFY
16. TOTAL RESISTANCE (Rt)OE
S I S • HR I r17. Ufr (FRAMING)En
1B U (CAVITY)
1 /Rt (CAVITY COLUMN PII
TABLE F -3 SUMMATION OF TRANSMISSION VALUES FOR FLOOR
SOURCE U -VALUE FROM LINE AREA 1 FROM L1NE U -VALUE X A
FRAMING Wirmaillgi LINE 17 3 co iiiinigiiiiiii 1
LINE 18 L NE 3
1
1 R I
OTHER 1/R LINE 5
OTHER
TOTAL Ao _SUM U X A_=
U FLOOR =
SUM OF (U- VALUES X CORRESPONDING AREAS) ,41A0
C , CALCULATION FOR FLOOR i<AHLf. r/ „.clr "'t`
LINE TABLE F -1 FLOOR AREAS SQ. FT.
r 1. GROSS FLOOR AREA
1 -TABLE F -4
FRAMING AND CAVITY RATIOlr2. 1 RA(1ING AREA (Af, -)
f G OpI5T FRAMING CAVITY
LINE 1 X TABLE F -4 SPACING- RATIO RATIO
3. CAVITY AREA 3.-- 2 • L.12„0,13 0 1
f LINE 1 X TABLE F -4 0.10 0.90_
4. OTHER ISPECIFYL 16”
0.94
5. OTHER (SPECIFY
24"0.06
TABLEF-2FLOOR CALCULATIONS HEATING
SOURCE OF
FLOOR
MATERIALS
WINTER R- VALUES
THERMAL FRAMING CAVITY
RESISTANCE
6. OUTSIDE AIR FILM 11R
7. EXTERIOR F1NI5H
9. CAVITY INSULATION NM11.1Mgrillillw-11111 1
1 ail r
11. DECKING..
12. FLOOR FINISH
13. INSIDE AIR FILM
14. OTHER SPECIFY
15. OTHER SPECIFY
16. TOTAL RESISTANCE (Rt)ta, C) 3 23 , -- f ; '
S I S • HR 1
17. U f r (FRAMING)r G ' .71
1 a ITM1 1 u1 PIP111111 _ ..migiumNM
18. U (CAVITY)
1 /Rt (CAVITY COLUMN
TABLE F -3 SUMMATION OF TRANSMISSION VALUES FOR FLOOR
SOURCE U -VALUE FROM LINE AREA FROM LINE U-VALUE X A
FRAMING mi
LINE 18 IMINIMIIIISIMifJOIRMEMOJII
QIUER
1 R
HE 1 /R li
OTHER
Ao =SUM U X A_=
TOTAL 11011017-1.111.11m--
SUM OF (U- VALUES X CORRESPONDING AREAS) -j
U FLOOR = ---____--Ao
r'
1 U CALCULATION FOR WALL
LINE 1 TABLE W -1 WALL AREAS SQ. FT.
1.GROSS WALL AREA A0)2. al' 3 '4
r 2.. WINDOW AREA A 5 Z S
3.DOOR AREA Ad)1 , I Z{
4. i OTHER (SPECIFY)TABLE W-
5.OTHER (SPECIFY)FRAMING AND CAVITY RATIO
6.' OPAQUE WALL AREA (AoD)
LINE 1. SUM 2 THRU 5• 2 :5 r 4- `STUD FRAMING CAVITY
7.FRAMING AREA (Alr)SPACING RATIO RATIO
LINE 6. X TABLE W -3 ii , 3 5w l"22 78
8., CAVITY AREA A 16"20 80
1 LIN 6. X TAB W -4 2 QC ',24"1515 85
TABLE W - OPAQUE WALL CALCULATIONS FRAMING AND CAVITY
SOURCE OF WALL WINTER HEATING R VALUESTHERMALMATERIALS
RESISTANCE CAVITY FRAMING 0 HER
9.OUTSIDE AIR FILM 7
To.EXTERIOR FINISH BM=
11.SHEATHING
FRAMING
immig CAVITY INSULATION 11111,11MIN
AVIV A R SPACE
C' 15 .INTERIOR FINISH a
16.INSIDE AIR FILM J
MIMI OTHER SPECIFY III
OTHER SPECIFY EMI
9.TOTAL RESISTANCE R
SUM OF"`LINES• 9 THRLT 19 Ar lip
1 /R ( FRAMINGRRAMING COLUMN)1..1111b r=-.' `" e
imill U CAVITY e Rir41/R CAVITY COLUMN)0 4.,
U OTHER
1 /Rt OTHER COLUMN) 1 ., 11 . 11 _ 11 . 111111111k111111111.._ 11111111111111
TABLE W -3 SUMMATION OF TRANSMISSION VALUES FOR WALL
SOURCE U -VALUE FROM LINE ARE FROM LINE U -VALUE X
FRAMING LINE 20.4 LINE 7.7 "5,^'"
CAVITY LINE th IF,;
OTHER giggimmigggi LINE
OTHER R
WINDOWS R,7.
DOORS 1111111 1/R
r TOTAL Ao VIEE3011 SUM U X A = NIKOWAII
SUM OF U- VALUES X CORRESPONDING AREAS)36UWALL -GROSS WALL AREA A0)
0
L
al
V
9 1 '
1 U CALCULATION FOR WALL
LINE 1 TABLE W -1 WALL AREAS SQ. FT.
c
1.GROSS WALL AREA Ao)2 e3 2-c:;)
f 2. . WINDOW AREA A )
3.DOOR AREA A
4.OTHER (SPECIFY)TABLE W -4
5.OTHER (SPECIFY)FRAMING AND CAVITY RATIO
6. ! OPAQUE WALL AREA Aop
LINE 1. SUM 2 THRU 5 STUD FRAMING CAVITY
7.FRAMING AREA (Af SPACING RATIO RATIO
LINE 6. X TABLE W -4 a d 1 12 22 78
8.CAVITY AREA Ac)I6'20 80
LINE 6. X TABLE W -4 1 1037, - 76 24'15 85
TABLE W -2 OPAQUE WALL CALCULATIONS FRAMING AND C VI
SOURCE OF WALL
THERMAL MATERIALS WINTER HEATING R VALUES
RESISTANCE CAVITY FRAMING OTHER
9.OUTSIDE AIR FILM J710.EXTERIOR FINISH J
IMMO OUTSIDE SHEATHING
mum FRAMING IIIIIIIIIIIIIMSWINall
mpg' CAVITY INSULATION
AV T` A R ACE
c 15.INTERIOR FINISH
16.INSIDE AIR FILM
IIIMIE OTHER SPECIFY
mm OTHER SPECIFY
9.TOTAL RESISTANCE Rt)y . . ,,SUM OF' RLIIv'ES -
N
THRU` -19 r' , ,,..,
MillLift FRAMING
1 /Rt FRAMING COLUMN)
Ilia U CAVITY
Y t1/R CAVITY COLUMN)Ad
2.U OTHER
1 /Rt OTHER COLUMN)
TABLE W-3 SU MATIQN OF TRANSMISSION VALUES FOR WALL
SOURCE U -VALUE FROM LINE -ARE FROM LINE U -VALUE X
FRAMING I3 LINE 20.210 LINE 7.2
CAVITY LINE 21.L NE 0
OTHER LINE
OTHER I/R
WINDSWS Ilmatimmomm R w,.LINE
DOORS gigmmiggggl 1/R 93J2.41, LINE 3 .1 Z •
TOTAL A zCj r p SUM U X A=4
SUM OF U- VALUES X CORRESPONDING AREAS)U WALL GROSS WALL AREA A
rIS`N2 002275
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
303) 945.8241 / (303) 625 -3321
Job Addr' .,Highway 82, Glenwood Springs
Nature of Work Building Permit
Use of BUnclincj Partial permit for footings & Foundation
Owner Orrison Distributing Company
Contractor .The Neenan Company
Amount of. Permit: $Date:December 21, 1981
Patsy J. Tenney
Clerk
iILDING PERMIT APPLICATION
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
945 -8241 / 625 -3321
Pr
Garfield County, Colorado,19
Owner:O fig Prsrie /I . 6044f'j}Wj/
Contractor or Builder: 7)-f 1 -hl ( gA//V
Location: e7l -/i/V4 V Y
Purpose for which building is to be used: AK-7iM pwir F Foo /A&f I FOciA/P47%ac/
Size of Lot: 5 A c -72 (+1-)
Distance of building from property line at
voi /-vc `Front:Rear: Left Side: Right Side:
Distance from nearest building:Number of stories:
Source of water supply:Number of rooms:
Type of sewage disposal:Type of foundation: 6-0 /zi 7
t
Width of building:it 5 Material in outside walls:
Length of building: 1 f Exterior finish:
f
Height of walls:L I Type of roof:
Floor space in square feet:
Estimated value: $
Date construction will begin:Date of completion: _
Permit charge: $ Ai 0 416_
Plan check fee: $ C - cr r d -,
TOTAL: $ d.9
And I/We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris cause€1, co truce n of said building.
Respectfully, 1-0-
The County Commissioners hereby grant the above permit as per terms therein stated. This . day of
PCr441i"..-
2/--r (-77, ------/-,,.._.-- _...
BUILDING OFFICIAL
11111111111111111.11111.11.......mm--GUI LLD (*,1“Y_Colorado
srf,ic OFOffice uf 13,,;Idr.g •Dif;cal
EOU EST FOR INSPECTION e2 zys _
Z-.1)
reimit No.
Time
PM.
Dist rtk
8 2-- ---
71-i-ci-d-7.
Loc.lity
Col-11f actor—
111 0111P-;AG - PLA—STERING ELECTRICAL PLUMBING
HEATING •
1:1 Sough Wk log .0 Ftough .............. .
0 Sough ............
0
0 Fi
Chtroney..
C3 rir,o_ .............. .
0
0
0LiLath
rifsh Wi,ing.-Q Finrfl ................. r_.He
Sc:ratch. _ ....... _
Fixtures ..........
0 Sewers .............. Li. N . a 1 e r
ater., 0
Ffoal _., .............. .pg
0 Motors_ ......... -.
0 Gall ................... 1-1,_.
Foot 0
Firlish_-__. ......
0
Cepool _ .........
t__.1
Wea V 9 rf wznbcA,d _._ ...... 0
Underground 0
Insu a 2 1..„..-- READY FOR INSVECT ION
Ar.r....20
1.'ort:AR/ T s.
Wed.
Thur1.
Fri.--/
inspectio A !! ,,
C.. - -,:f 11_I_U' L(!U;(I
Colorado
STATE OF_ —
Office of Building Official
REQUEST FOR INSPECTION
v
Perrnit No.__..
Dstrict
Na--_______ _ ____ __ ____________________________ . JfLottiy
Job F dess
Contract
J —.. -
ELECTRIC PLUtJBING
pLAS - --- --Po„n 1 : 3FohWiring -
0
Finish Wirng.. Fi _r..
Chimy- .-- .. -
0o
Scratch -__. Fitures.-- •- - - - -•
5ecrs
Bro_. ..- ----.
Motors...•- .. .....
Cas
C[r of ... __... -•-
i ngS Fish.__ - Underground
nsulat
rf Wallboard ..__
Insult at = .- READY FOR INSPECTION
h4 es Wed.
Mon:r. v
In:pecti.
i
Inspect
J_
GARF1 ELb COUNTY-
STATE 0
Colorado
Office of Building Official
te/
tkEQUEST FOR INSPECTION
PermitNaOstrctNaTime P_ M. Loclity
eres
ntractor_ PLUMB GJ
INPLAS7ERING GLEC7RICAL
It0., 1N R ough Wirg_ Rough
Wre __— -- -- - - °Fnl
C mn y Finish Wiring - "r_.
Lh.- - eerx
C Fixtures._..._.....
S •
np M ..-- __- _.. -.
50 Cepool
Fh__Undergroundoottl
ICI
70ed.Thurs.
M Na r)
Non 553 Nt.
inspecti Mad------
Inspectorf
t.
a o0.l
GARFIELD COUNTY..
STATE OF Colorado
J
T Office of Building Official • /
P EQUEST FOR INSPECTION
Date S 2 Permit No_ 2
Time C23 7Received.P_M,I]istriet No_
Job A/Locality
iO -. n e is
Name _ ( I ' L -7..Contractor
tDING PLASTERING ELECTRICAL PLUMBING
Foundation Wire Rough Wiring_ RoughRouChimney Lath __ —__— Finish Wiring.. FinalFiFraming Sciatch___ El Fixtures 0 SewersWaFinal__, Blown_ Motors.Gas
r 00 - 1 ng$ Finish Cesspool
Weather rf ttbre __. _ . CI Underground Insu atl I_ pii rSl rp F St'ECTION
1J,on:7t+es,
o
We Thurs.Frl.
Inspection le Zr / 7/ / 7r k (-
Inspector 4A
row., 300.1
GARFIELD 'COUNTY-L.-------
Y STATE OF
Col orado
Office of Building Official
REQUEST FOR INSPECTION
2-- .Z.l'''''Permit Nn
pate
Time A.M.D No
Received P.M.
Job A eress Locality
O.vner's
Name O/C-2, Contraclor
U OIF PLASTERING ELECTRICAL PLUMBING HEATING
W - - Rough Wiring _0 Rough Rough 0
Chun
ey Lath Y
an- _. - - -.
g - - Final Final
Chimney
Finish Wiring
Water Healer_-
Framing Sc:atch_ -- Fixtures Sewers
Final...i 0 Brown__.-.- Motors-Gas
Weatrprf LJ Wa11bc I... 0Un ound
In I atii on N ,5I AFOR INSPECTION A,M.
p ow (Tues- `ed.Thurs.Fri._ /c
Inspection Ma ,e Z L
r e'ki›
Inspector r J L
GARFIELD COUNTY
STATE OF CO01 8dp
Office of Building Official
REQUEST FOR INSPECTION
Date 0_7..._ l
Perrnit No "_ 2---7-S
r
Time A "M
Received 5,District No
z`Job Aderess J
O • ner's Locality
Nam Contractor
C_ Ultirt er PLASTERING ELECTRICAL PLUMBING HEATINGFoundationIwire "- ____ Rough Wiring_ RoughChmneh
Finish
9
Fin.
y lath. "— .- __Wiring " - Final FinalFramingSciatchFixturesSeweriFinal__ _YJater Heater_
GasFootings
B'own_T Motors
Finish
CesspoolWeathher.rf Wallboard .._
Insulat . - --g-Under ground
READY FOR INSPECTIONMon_i`ir ues.Wed,3cThurs.Fri -
lnspeclion h de -z...../4,4'1---C. . _ .„ ,;44,t
Inspector i
oa... 300.1
r
GARFIELD COUNTY.ColoradoSTATEOF
oP
office of Building Off
Date_
icial
C4/./-1 A
A • EsT FOR INSPECTION
NTime
A.M.mit
District No. 77 1Received
A - •
MAI
J • b AddreSS
LocalityOflir
N
s
Adir 4 earl tra cl ordrrING__) PLASTERING ELELECTRICAL PLUMBING HEATINGFound-azion Wire 0 Rooph Wiring _0 Plough ............... 0 Rough 0FChTniney0Lath0FinishWir•og . 0 F inal
Finnt 0
raming 0 SCratch 0 Fixture-s 0 S.'vw.rs .............. 0 Vier Hez,ier-. 0
Final...0 Mown__ Motor&0 GasFootingsAFiniNh_
Cesspool 0rweatberf0Vvallboard ....... 0
Underground 0Insu !adon lc,READY FOR INSPECTION
A.M.
Mon: CO 144.Wed.4111391binspectionA. e_2"/"nspector 1—
noo.1
GARFIELD'COUNTY_
STATE OF Colorado
Office of Building Official
a - ,
EOUEST FOR INSPECTION 742 7.-C---.
pate Permit No.
Time Al " [
I] N.Received
Job 4 ddress ocallty
Ovdner's if A I L 4
Name ractor
Name
BUILDING PLASTERING ELECTRICAL PLUMBIN HEATING
Foundation Wire_ Rough Wiring Roug ough
Chimney Lath -__ Finish Wiring.. Final Final
Framing Scialch Fixtures Sewers Water Healer_.
Final Brown_ Motors_Gas_,_
Footi ngs Finish Cesspool
Wea herprf Wallboard Underground$
Insuiatlon READY FO NSPECTION
Mo Tues.ed Thurx.Fri.. .P.M.
plns eetiun M 4 2 _l 3
Inspector , //
r o w . . 3 o 0 - 1 . l
GARFIELD COUNTY
STATE OF Colorado
Office of Building Official v
y r,
PEQUEST FOR INSPECTION
Date„€7 / % L Permit No 2 -. 7 C
Time M.
Received V T IGt:District Ni,
7 Lk' ' .L H w cs n cL SJobAddressLocality
O.vner
Name I- r/! 5 c Contractor
BUILDING PLASTERING ELECTRICAL PLUMBING HEATING
Foundation -___. Wire _ Rough Wiring_ Rough Rough
Chimney Laih Finish Wi•ing_. Final Find fl
Framing Fixtures Sewers Water Healer__
Final_.Motors_Gas
Footi nOs Cesspool
ea tie ?rf ' 7447 Underground
Insu at' on y FOR INSPECTION A.M.
tJun:Ca l4 r WikTues." 7ues:'ed.rs i Fri_V P.
lnvrction h a___
Inspector
u ,,,,,
I 1 LLD I:: 1 ;.; i Y
STATE OF CLI01c:(JQ "y
Office of 3uilding Official
LQ ._Permit
FOR INSPECTION
Date y/i_37?Peri t N0.___
l i C ittReccived__
f
District Nn_
1L 2-----
JPb Addr S s
J
Locallly
O.•: ner
Neme - -_50 ,7 a Contractor
BUILDING PLASTERING ELECTRICAL PL . NIeIN HEATING
Foundation Wire ...Rough Wiring.Rough9 Rouph
Chimney Lath .Finish Wiring_ - Final 0 Final
Framing Scratch__ -_ Fixttiret Sewer,Water )hater..
Final._Brown Motors_Gas
Foo i ngS Finish._Cesspool
Wea er[?arrf Wallbod UndergroundInsu0READYFORINSPECTION A.M.
f'on:Toes.Wed Thurs.Fri-P -M_
Inspection Made_Z.- _Y 6
Inspector
r o. 30o.1
GARFIELD COUNTY
STATE OF CO 1 o ra dQ
Office of Building Official
Date AEQUESTEQUEST FOR INSPECTION
Time Permit No.Received 19
P
District Ne_
Job A60ress
Owner's,! -y Loc IttayNas ! ` t/
a
ILDN PLASTERING Co" tractor_6U
Foi ILDI CI ti , PL ST ELECTRICAL PLUMBINGChimney0
Wr
Rough Wirin HEATINGh- _` - - --•
F-Rough --
RouhFraminKnishWirin- -p Final----••°- - •• -ch-. p Fixtures . - - - _Finat __s-Bro _Finat ..................
1YarerOO .I Molar Healer.. Fed Fin" h
cesspool ......... -
on
READY FOR INSPECTION Underground fort:
Inspection h d
ue 1N_ ._
1
Thurs.Frl A.M.
7 P.M
Inspect 1-___ V_`fe
r0' 4 300-
GARFIELU COUNTY
T
sr ATE OF Colorado
Office of Building Official
REQUEST FOR INSPECTION
Date 7A A/ A'Permit No. 2 - - 76
uTim[3 Received, 7 moist No.
Job 146Ore11 j Loc
0.•:ner':
N'm[e -'a •--- /` r s Co nl r act or
LUING ING ELECTRICAL PLUMBING HEATING
F *..atio_ .W'Rough Wiring_ Rough Rough
Chimney ".. a1h WFinish iring,. Final Final
Framin Bich_._._______. Fixiurr-s Sewcrf Wier Healer ".
Gat
Final Brown 1oior
f ootl n
s
Finish -- Cesspool
Weat rf Wallboard Underground
Insu atlon READY FQR INSPECTION 69
Mon.7u i Wed"Frt. _... (*A03 P.M.
Inspection h e
Inspector_0
rP ^.+ 300-1
GARFIELD couNrY 1
STATE OF Colorado
Office of Building Official
en7 REQUEST FOR INSPECTION
Date _,Permit No _ 2 .. u
lime CA.ao!
Tieceived 0J F M_District No_
Job Ad
r J^Locality
pc; wner's J! / O /7 A ame Contractor
aatl-G-PLASTERING ELECTRICAL PLUMBING HEATING
Foundation i,•.L+t"Rough Wiring . Rough Rough 0
Chimney..th._ -__ Finish Wiring.. Final Final
Framing.f / 1 Sclatth ' - _ Fixtures SewersQ Water Heater_. Final._k n___.._._. Motors_Gas
FFop p S_Finish___ Cesspoolweatberprf Wallboard Underground Insulation 0 READY FOR INSPECTION A M.Mon.Tue . ti Jed.CITy=Th Fri-en)
Inspection h7a.7-- dr 4---
Inspect r
r C w M ] 00,1
GARFIELD COUliTi
Col oradoATEOFsT
Office of Building Official
REOUEST FOR INSPECTION
Dale 1./2-4/8 0—022Pe, mil No_
Time A.M.
Received_P.M.District No
7 C.9 2 --
Job Aecheu Locality
k
N (7/t/ SO1'7 tf 7 ConI
C:101.0.t' fr:ST_LaTUG- ELECTRICAL PLUMBING HEATING
F oundalion ___. r... i•e ,0 Rough r.ri.ing 0 ROugh CI ' Rou2t 0
Chlmney . .., _ or 1h.r. rbilh Wifing 0 F:nel 0 Fin•I 0
rnFt..in 1ji .... .....-' crAtch S. F xtutet
41 (W , a,
0 s--er,0 I.V.ier HeAler., 0
Erown_w iolorc 0 Gas 0
Foot 0 Finhh— , ... 11 .3 Ces‘poof 0
Weatberprf 0 r.., AP Underground 0
Insulation J READY FOR INSPECTION A.M.
Mon.Tues. Wed.Thur.aq Crri.
I r, r) U r dr ____`?7"75
1 n • ^)r-c1or._._ 4.- _ ,_.'_.___
gl
Office F
REOUEST FOR INSPECTIONV/ I--
e. 7.SDalePermitNozTime01. ILM''
Received c.../(1 P.M.District riao.
e"--Z-7
2---
Job Acid.
LoC alilyt.O-neei
N. C- -.)--',Z._,C..:'conti.a.ctor
CiF -PLASTERING ELECTRICAL - PLUMBING HEATINGFDunrlation ------ 0 Wire 0 R..0 1.-/;,;„,, 0 Rough 0 Rough 0cillLai . 0 Finish Witing..0 Final 0 Final-fpFam" g).. m
Scraich 0 rimTu•cf 0 Sevver1 0 Water 1 0F; Al i Brown/0 molar.-0 Gas 0Fooi110Cesipool ..... ....IDWeather — Wallboard 0 Underground 0Insuatonia—READY FOR INSPECTION
4 , 7 M.Wed.Thum .- ---Fri. /P.
r)?s-,•..1---C-40- 4 $1,-"Te1n1: Made. .
A.-.In•-,f-cior
GARFIELD COUNTY•.
STATE O
Col orado
Office of Building Official • -
PiEOuES - T FOR INSPECTION 7
F-Perrnii Ne.
Date _lb No.—.--------_
Time -
R eceived
District No -
y J — Locality
Job AddiesS
ContractOwner's s
J^ ____
HEATING
Name ELECTRICAL U JIBING
BUIt01NG PLASTERIN y ..._...
Rough Wiring _0 Rough
Wire._---- .__. -_..Final
Final--------- -- - ---
Founn ..........
Framing Motors. ............ GesBrown _- - - - - --
Gas
Final... -•--Finish._- - -- Underground
Weat ero
Wallboard
weal rf CI PECTIOrJ
Insu a on EA rs.
Fri.
1
on
osoecec lor
Ma ar -_,A.---lnSOor
GARF 1 ELD COUNIY
STATE OF Col orado
Office of Buildins Official
REOUEST FOR INSPECTION
Daie Ce// '4 2 ----Permit No 2 2_7s
Time A
Received 6 / 5 --- P.M.District No
S 2
Job ACICUZ Locality
0 svrieesg c' , c // )./ Z cdra•acto
al)) „nsit; .D P WRING
rtrLA
ELECTRICAL - PLUMBING HEATING
21re..nd.,;on .e 1=1 .... Rough Wiring Fl _0 ugh 0 ' Rough 0
ch; AIL ails ._________-- 0 Fin:1.h WiIng,. 0 Final 0 Final 0
F 1 arning t''' - - ...5 rola+0 Fiats..ret 0 Sewer'0 r.'aser Healer__ 0
Final rP4:- - fill ;If • knsIgi-- — 0 motors,0 Geis 0
Footi gsi , A rash 0 Cesspool ...... .... 0
Wea tberprf 0 w.ift,..,d 0 Underground 0
Insulacion_la...,READY FOR INSPECTION errs
40 62/7 T
Wed.Thurs.tbr-S'‘P.M
n.'3uctor___
E OF CO1 orado
4 OK -- Orr;ca of Buiclins Official
1 U S R / 1cSPECTIONe- •
DA7e 0.
Tirne A_M.
Prcr;ve.M..
1,-.11----7
C:) No
Job ..c., c I E ts Locality
Ov+ile.r.1 i'VeNernrCOn:rActor.e._,)•02 en.
EIALDInG pLpsirp.H4G ELEcTFIcAL • PLUMBING HEAIING
ro:on 0 v;:, .0 Flouyh Wir;r1g 0 Rough
ChIr-,nry 0 Lath 0 Fr, Wuog, 0 F:
F rarrl'ing ScratIch 0 FiXIJ 0 St wrIl V.'elc, Ho •Irf .. I.
Fflal ...Prui.vn 0 P. 01 ors.0 Grr 0
Footi n QS IJ Fir.0 Ce••,;.001 0
r:ea VciEl 0 i , ...d 0 Underground 0
ins u 1 ati on 0 FirApy R I ,2 l'E CTION
Toes .//; Wed.Thurs.F rl.eV
ln•_;..-clion c.22-s-__s---_
1
inpecior
q^ 0 , 114 I I IIlUnpp,Ml
1 ,pn, WMIY r Pb,
g1 1 V1L'If'IA +p
rlirrl I
1 ly;'p i,,1f I ,11 I 'l
I, ' 1
L.
I F 1
i llm'1' ,, it "A,h 1
1 I
hl I ,
f
T
i I, 'I II III,:
ii
I
i Ili Iui,'4'I i J , I II i'I U,I ,,.I III II,
r I,p M. 1,1 III'dV'I x
i 1 ,d'1, 1 I 1 1, 1 I I
r 0 /j 1 ' Irl'`I
k9' I'it • 1777 InI I I I0,III I
II
I,;1IrI,.1 I i' 4i •I;P,,4 jr I + I ' I li 11 11I,
I
i
1
POST THIS CARD AT OR NEAR FRONT OF BUILDING
1 .,GARFIELD COUNTY BUILDING AND SANITATrON DEPARTMENT NO 00240 1
2014 Blake Avenue
Glenwood Springs, Colorado 81601
303) 945.8241 / (303) 625 -3321
Job Address tots 6,9,20,21, Section 35, T6S
Nature of Work
Building Permit
IIP; `
Beer Warehouse/Distribution
j , 4 Use of Building it
Orrison Distributing Co.Owner
1 Contractor The Neenan Company
1,334.80 March 3, 1982
Amount of Permit:Date: .
Patsy. Tenn
I
11 Clerk
l'iii,
fc2ry
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER
14 tI1I'
II':: '
h I
1 IIIb
Hi
o,,
I
III l
1 1' rid, l 11
I I Ill, 'I' ' N 1o,,IIP I if III , II I
I I
II
I P
I
1II 1 1
i1111i
I
i
I I11
1 I :i
I
f
I
I
1
1 , I gg
I
I I d 1
I IL I el 1tlIlh11III.IIfh'lij ',. p I 1ppI, i I11iII
I III I I I
1,II I !11iV
II.I 11 II I I i 1h
II Iit qI 1'V
1i I 9
IIII
V.111 1''
1 i11 I 1 1 1 I
1
I J i Ir11
I I I III' 1 1 1I I I III I 1NIIIP I 111III, 1 1 I 11 I 111Ihyl l.I I I 1
II l' 1 111 i1111111.1 1 1IIIliI1
II
I j i 1, 'i I lIr
I ` 'I J1I Ih1 ' 1I
j I h'd ,IILill
I
I 1'I I'd 1 i111i
1PI
1 IIh I 'll
I
I
1li;l :, I,, ' M
I I •
w
r
s peeoieeokdti ;,'1
POST THIS CARD AT OR NEAR FRONT OF BUILDING
I
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT DO24O
20t4 Blake Avenue'
Glenwood Springs, Colorado 81601 -
303) 945 -8241 / (303) 625 -3321
Job Address Lots 6,9,20,21, Section-35, T6S &90
Building PermitNatureof ,Work
Beer Warehouse /Distributionai . Use of Building
Owner Orrison Distributing Co.'
P,
i Contractor The Neenan Company
Amount of Permit: $ 1,834.80 Date:March 3, 1982
J . e
Pat J. Tenney,
Clerk
i,f'.
NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER
c II (7 tY Inspector must sign all spaces pertaining to thls Job
V1
11 1 '1 " l IINSP DATE INSPECTOR
Foundationsp
Setback
Trench
Rein
1
1 r
Foundation Wall
I
i
I'I,i III
11 athrp I 9 iI 'P
Pour no concrete until above has been signed 141'
Concrete Slab Floor 1h 9
Electrical (Groundwork)d n 4 f f ,P
i
I il 81 /
GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT
2014 Blake Avenue
Glenwood Springs, Colorado 81601
303) 945.8241 / (303) 625 -3321
Job Address l A - '"' . ". r1' 1Il; i., Mtt1 r. -.t..
Nature of Work i 1 d i i F-(?) i l "', ',
r_1, Foos }ins' rouridz ti on 0 ;1 - IUseofBuilding
Owner ifl i, "C:... H1
Contractor h :r1_ CTis'..: voticn Co.
Amount of Permit: $ i T •'Date:March 3, 1
Patsy J. cr,
Width of building:Material in 01115171CWalis: 1-7
Length of building: 17 qG Exterior finish: C--= 1 -
Type of roof:1'
Height of walls:
Floor space in square - -t:
Estimated value: $e --,_ - -_
Date construction will begin: 1 ) / h i.t .el' 3/ /Qt:2` Date of completion: _
Permit charge: $
V
Plan check fee: $
TOTAL: $ .
And 1 /We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused by the construction of said building.
IP r 4-- a..Respectfully, _
The County Commissioners hereby grant the above permit as per terms therein stated. This d
19
BUILDING OFFICIAL
N2 0021/5
GARFIELD COUNTY BUILDING AND SANITATIGN DEPARTMEN
2014 Blake Avenue
Y• 1;4 , --Glenwood Springs, Colorado 81601
303) 945-8241 / (303) 625-3321
LW 429"
Job Address Highway 82, Glenwood Springs
Nature of Work Building Permit
Use of Building Partial permit for footings & Foundation
Owner Orrison Distributing Company
Contractor The Napnan Company
Amount of Permit: $Date:December 21, 1981
Patsy J. Tenney
Clerk
WicIfb cif building:n L_ _____Material in outside walls:
Length of building: 1k 'Exterior finish:
i
Height of walls:7 .1.Type of roof:
Floor space in square feet:
Estimated value: $
Date construction will begin:Date of completion:
Permit charge: $ 14 C.' 7c' 41e
Plan check fee: $ Ciern 507
TOTAL: $
And I/We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and
adjacent street or streets of all rubbish and debris caused-by the constructi
2 n of said building.
t 4 (--
2 7 / /
4 i
Respectfully,
St--
The County Commissioners hereby grant the above permit as per terms therein stated. This 9 day of
BUILDING OFFICIAL
N2 0872 'CERTIFICATE OF OCCUPANCY
BUI DEPARTMENT
GARFIELD COUNTY, COLORADO
Issued Without Fee
Jung 30 1982 •
Permission is hereby granted to Orrison Distributing Company
Building Permit No.2275 & 24 Zone District.
situated at 491A Hwy R2, Glpnwnnri Spri ngc Lot _BI k.Addition
far the following purpose_Beer warehouse and Oi strihutinn Center
IState Nature of Use)
contractor The Neenan -- Company
4,TAKE NOTICE White: Owner
No change shall be made in Green: Lending Agency
the use of this building with- Gold: Contractor GARFIELD COUNTY BUILDING DE ' Toutpriornoticeandcertifi- Yel low: Building Department
r / r y "l-cats from the Building Official. Pink: Assessor By