HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-08-17-4896
Christopher & Nancy Reed — New S.F. Residence
1219 River Bend Way, Glenwood Springs, Colorado
Ironbridge, Phase 2 — Lot 72
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (IRC)
AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (IECC).
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS.
REDLINED NUMERICAL NOTATIONS ON PLANS REFER TO ANNOTATED ITEMS ON THE
ATTACHED "RESIDENTIAL PLAN REVIEW LIST".
3) A LOT IMPROVEMENT CERTIFICATE SEALED BY A COLORADO LICENSED SURVEYOR
IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY THAT STRUCTURE (INCLUDING
ROOF OVERHANGS & OTHER PROJECTIONS) WILL BE IN COMPLIANCE WITH SETBACKS.
4) GEOTECHNICAL ENGINEER TO PROVIDE OPEN -HOLE INSPECTION REPORT TO VERIFY
1,500 PSF BEARING CAPACITY REQUIREMENT. GEOTECHNICAL ENGINEER ALSO SHALL
VERIFY PLACEMENT OF COMPACTED STRUCTURAL FILL PER SOILS REPORT. PROVIDE
ENGINEER SEALED APPROVAL REPORT AT UNDERGROUND PLUMBING INSPECTION.
5) IF ANY REQUIRED BELOW SLAB INSULATION WILL BE CONCEALED AFTER CONCRETE
POUR, THEN CONTRACTOR IS RESPONSIBLE FOR CONTACTING BUILDING DEPT. TO
SCHEDULE A SPECIAL INSPECTION PRIOR TO CONCRETE INSTALLATION TO INSPECT
INSULATION.
6) STRUCTURAL ENGINEER SHALL BE FULLY RESPONSIBLE FOR REVIEW AND INSPECTION
OF CONCRETE MAT SLAB FOUNDATION INCLUDING PLACEMENT OF STEEL REINFORCING
BARS, ANCHOR BOLTS AND FORMWORK PRIOR TO CONCRETE POUR. CONTRACTOR TO
PROVIDE ENGINEER'S SEALED APPROVAL REPORT (WET STAMPED & SIGNED) AT
UNDERGROUND PLUMBING INSPECTION.
7) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.