Loading...
HomeMy WebLinkAboutObservation of Drilled Pier Installations 03.29.2017H -PKU MAR Geotechnical Engineering 1 Engineering Geology Materials Testing 1 Environmental 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Parker, Glenwood Springs, and Summit County, Colorado March 29, 2017 RM Construction Attn: Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 (hlakc('buiIclw ithim.c otn) Subject: Gentlemen: Project No. 16-7-570 Observation of Drilled Pier Installations, Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado As requested, a representative of H-P/Kumar observed the drilled pier installations at the subject site on March 21, 22 and 23, 2017 for building foundation support. The findings of our observations are presented in this report. The observations were performed in addition to our agreement for professional services with RM Construction dated November 8, 2016. We previously provided recommendations for design of drilled pier foundations at the site in a report dated December 9, 2016, Project No. 16-7-570. The foundation of the proposed residence was designed by Lindauer-Dunn to be supported on forty drilled piers of 12 to 18 -inch diameter. Our observations of the pier hole drilling are presented in the attached Drilled Pier Observation Reports. The pier holes were observed to have fully penetrated the alluvial fan deposits and adequately embedded in the underlying river gravel deposit. Due to caving of the gravel, the practical drilling limit was typically 2 to 21/2 feet into the deposit. Based on the previous subsurface exploration and our current observations at the site, the installed piers appear adequate to support the recommended design values and pier load capacities. The findings submitted in this letter are based on our observation of the pier installations, our experience in the area and the previous subsurface exploration at the site. Variations in the subsurface conditions below the helical piers could increase the risk of foundation movement. Our services do not include determining the presence, prevention or possibility of mold or other RM Construction March 29, 2017 Page 2 biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. If you have any questions or need further assistance, please call our office. Sincerely, H -P- KUMAR Steven L. Pawlak, P.E.' SLP/ljf Attachments: Report of Drilled Pier Observations, March 21, 22 and 23, 2017 cc: Lindauer-Dunn — Jeff Dunn (Jef f ( liud_auc i'LIun Lconi) H-P�KUMAR Project No. 17-7-159 H-PKUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hokglenwood@kuniarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado CONSTRUCTION ACTIVITY REPORT Client: RM Construction Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No.: 16-7-570 Day: Date: Page: Tuesday 3/21/17 1 of 2 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado Weather: Clear, calm, dry Contractor's Construction Activities: Equipment in Use: H-P/Kumar's Site Activities: Verbal Communication: Temperature: 55°F at 9:00 am Penley drilled 10 Piers (5048, 5053, 5042, 5043, 5045, 5047, 5041, 5044, 5038 & 5039). Auger Drill Rig All pier holes drilled today were 18" diameter drilled to a total depth of 10' to 11' and embedded 2 to 21/2' into river gravels which caused gravels to cave. All pier holes were dry and drilled within plumb limits. All pier holes received 12" diameter rebar cages with (6) #5 verticals and #3 rings at 12" o. c. All pier holes were concreted same day as drilled with concrete testing to follow in a separate report. Shawn with Penley was informed that pier holes were drilled to proper depths and within plumb limits. distribution: RM Construction — Blake Piland (blakeffl/bulidwithrm.com) Lindauer-Dunn — Jeff Dunn (leffAlindauerdunn.com) /Ijf Paul Weiser Steven L. Pawlak, P.E. Field Technician Reviewed By H -P KUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkallenwood@kumarusa.cam Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado DRILLED PIER OBSERVATION REPORT Client: RM Construction Attn: Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No. 16-7-570 Day: Tuesday Date: 03/21/17 Sheet: 2 of 2 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado General Contractor: Drilling Contractor: Penley Rig Type: Pier No. Location Pier Dia. Total Hole Depth Depth Variation Over/Under Ground Elev. Top of Pier Elev. Water Plumb (Top of Hole) Comment In Overburden In Gravel 5048 18" 11' 9' 2' -- 96' 10" Dry -- 5053 18" 10' 6" 8' 2' 6" 95' 3" Dry -- 5042 18" 11' 9' 2' -- 95' 3" Dry -- 5043 18" 10' 8' 2' -- 95' 3" Dry -- 5045 18" 10' 6" 8' 2' 6" -- 95' 3" Dry -- 5047 18" 10' 6" 8' 2' 6" — 95' 3" Dry -- 5041 18" 10' 8' 2' -- 95' 3" Dry -- 5044 18" 10' 8' 2' -- 96' 10" Dry -- 5038 18" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5039 18" 10' 8' 2' — 95' 3" 95' 3" Dry -- poples: RM Construction — Blake Piland (blaket&buildwithrm.com) Lindauer-Dunn — Jeff Dunn (jefft lindauerdunn.com) /Ijf Paul Weiser Steven L. Pawlak, P.E. Field Engineer Reviewed By H -P � KUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkglenwood(kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado CONSTRUCTION ACTIVITY REPORT Client: RM Construction Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No.: 16-7-570 Day: Date: Page: Wednesday 3/22/17 1 of 4 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado Weather: Cloudy, light wind, dry Contractor's Construction Activities: Equipment in Use: H-P/Kumar's Site Activities. Verbal Communication: Temperature: 55°F at 10:00 am Penley drilled 22 Piers (5034, 5029, 5033, 5050, 5049, 5046, 5040, 5056, 5055, 5057, 5037, 5036, 5035, 5052, 5018, 5021, 5019, 5022, 5023, 5020, 5051 & 5024). Auger Drill Rig All pier holes drilled today were either 12" or 18" diameter as recorded on following pages. Pier holes were drilled to a total depth of 10' to 10' 6" and embedded into river gravels from 2' to 3' 6". All pier holes were dry and 2 pier holes were straightened with a core barrel after auger kicked sideways due to boulders. All pier holes received rebar with 18" piers receiving rebar cages with (6) #5 verticals and #3 rings at 12" o. c. and 12" piers receiving (4) #5 verticals only. All pier holes were concreted same day as drilled with concrete testing to follow in a separate report. Shawn with Penley was informed that pier holes were drilled to proper depths and within plumb limits. distribution: RM Construction — Blake Piland (blakepbuildwithrm.com) Lindauer-Dunn —Jeff Dunn (Jeff(allindauerdunn.com) /Ijf Paul Weiser Steven L. Pawlak, P.E. Field Technician Reviewed By H-PKUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkplenwood{a kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado DRILLED PIER OBSERVATION REPORT Client: RM Construction Attn: Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No. 16-7-570 Day: Wednesday Date: 03/22/17 Sheet: 2 of 4 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado General Contractor: Drilling Contractor: Penley Rig Type: H & T Pier No. Location Pier Dia. Total Hole Depth Depth Variation Over/Under Ground Elev. Top of Pier Elev. Water Plumb (Top of Hole) Comment — In Overburden In Gravel 5034 18" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5029 18" 10' 8' 2' 95' 3" 95' 3" Dry 9" to SE Pier straightened with core barrel 5033 18" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5050 18" 10' 6" 8' 2' 6" -- 95' 3" 96' 10" Dry -- 5049 18" 10' 6" 8' 2' 6" -- 95' 3" 96' 10" Dry -- 5046 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5040 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5056 12" 10' 6" 8' 2' 6" -- 95' 3" 95' 3" Dry -- 5055 12" 10' 6" 8' 2' 6" -- I 95' 3" I 95' 3" Dry -- copies: RM Construction — Blake Piland (blakeebuildwithrm.com) Lindauer-Dunn —Jeff Dunn (ieff1 Iindauerdunn.com) /Ijf Paul Weiser Steven L. Pawlak, P.E. Field Engineer Reviewed By H -P KUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hokq'•.enwcod'kumarusa.cori Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado DRILLED PIER OBSERVATION REPORT Client: RM Construction Attn: Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No. 16-7-570 Day: Wednesday Date: 03/22/17 Sheet: 3 of 4 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado General Contractor: Drilling Penley Rig Type: H & T Contractor: Pier No. Pier Location Dia. Total Hole Depth Depth Variation Over/Under Ground Elev. Top of Pier Elev. Water � Plumb To of P Hole) Comment In Overburden In Gravel 5057 12" 10' 6" 8' 2' 6" -- 95' 3" 95' 3" Dry -- 5037 12" 10' 6" 7' 3' 6" -- 95' 3" 95' 3" Dry Pier straightened with core barrel 5036 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5035 12" 10' 7' 3' -- 95' 3" 95' 3" Dry — 5052 12" 10' 8' 2' -- 95' 3" 96' 10" Dry -- 5018 12" 10' 6" 8' 2' 6" -- 95' 3" 95' 3" Dry -- 5021 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5019 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5022 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- copies: RM Construction — Blake Piland (blakeebuildwithrm.com) Lindauer-Dunn — Jeff Dunn (ieffdlindauerdunn.com) Paul Weiser Steven L. Pawlak, P.E. Field Engineer Reviewed By H-PKUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkglenwoode.kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado DRILLED PIER OBSERVATION REPORT Client: RM Construction Attn: Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No. 16-7-570 Day: Wednesday Date: 03/22/17 Sheet: 4 of 4 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado General Contractor: Drilling Rig Type: H & T Contractor: Penley Pier No. Location Pier Dia. Total Hole Depth Depth Variation Over/Under Ground Elev. Top of Pier Elev. Water Plumb (Top of Hole) Comment In Overburden In Gravel 5023 12" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5020 12" 10' 6" 8' 2' 6" -- 95' 3" 95' 3" Dry -- 5051 12" 10' 8' 2' -- 95' 3" 96' 10" Dry — 5024 12" 10' 6" 8' 2' 6" -- 95' 3" 95' 3" Dry -- owes: RM Construction — Blake Piland (bfake uabuitdwitbrm.com) Lindauer-Dunn —Jeff Dunn (jeff@lindauerdunn.ccrn) /Ijf Paul Weiser Steven L. Pawlak, P.E. Field Engineer Reviewed By H -P � KUMAR Office Locations: 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkolenwood(a�kumarusa.com Parker, Glenwood Springs, and Silverthorne, Colorado CONSTRUCTION ACTIVITY REPORT Client: RM Construction Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No.: 16-7-570 Day: Thursday Date: 3/23/17 Page 1 of 2 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado Weather: Partly cloudy, calm, dry Contractor's Construction Activities: Equipment in Use: H-P/Kumar's Site Activities Verbal Communication Temperature: 55°F at 10:00 am Penley drilled 8 Piers (5025, 5026, 5027, 5028, 5030, 5054, 5032 & 5031). Auger Drill Rig All pier holes drilled today were 18" in diameter (instead of 12") due to both 12" augers being disabled. All pier holes were drilled to at least 10' in length with Pier 5028 being straightened with a core barrel after auger was kicked out of plumb. All pier holes were dry and embeded 2' to 4' into river gravels. All pier holes received 12" diameter rebar cages with (6) #5 verticals and #3 rings at 12" o. c. All pier holes were concreted same day as drilled with concrete testing to follow in a separate report. Shawn with Penley was informed that pier holes were drilled to proper depths and within plumb limits. distribution: RM Construction — Blake Piland (blakedbuildwithrm.com) Lindauer-Dunn — Jeff Dunn (Jeff@Iiindauerdunn.com) /Ijf Paul Weiser. Steven L. Pawlak, P.E. Field Technician Reviewed By H -P � KUMAR 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hokolenwood@kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado DRILLED PIER OBSERVATION REPORT Client: RM Construction Attn: Blake Piland 5030 County Road 154 Glenwood Springs, Colorado 81601 Project No. 16-7-570 Day: Thursday Date: 03/23/17 Sheet: 2 of 2 Project: Proposed Residence, Lot 30, Heron Crossing at Ironbridge, River Bend Way, Garfield County, Colorado General Contractor: Drilling Contractor: Penley Rig Type: H & T Pier No. Location Pier Dia. Total Hole Depth Depth Variation Over/Under Ground Elev. Top of Pier Elev. Water Plumb (Top of Hole) Comment In Overburden In Gravel 5025 18" 10' 8' 2' -- 95' 3" 95' 3" Dry -- 5026 18" 10' 6" 8' 2' 6" -- 95' 3" 95' 3" Dry -- 5027 18" 10' 8' 2' -- 95' 3" 95' 3" Dry — Pier 5028 18" 10' 8' 2' -- 95' 3" 95' 3" Dry straightened with core barrel 5030 18" 10' 6' 4' -- 95' 3" 96' 10" Dry — 5054(12„) 18" 10' 8' 2' -- 95' 3” 95' 3" Dry -- 5032(12„) 18" 10' 7' 3' -- 95' 3” 95' 3" Dry — 5031(12„) 18" 10' copies: RM Construction — Blake Piland (blake(a buildwithrm.com) Lindauer-Dunn —Jeff Dunn (ieffc:r lindauerdunn.com) /Ijf Paul Weiser Steven L. Pawlak, P.E. Field Engineer Reviewed By