Loading...
HomeMy WebLinkAbout03954GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 109 8th Street Suite 303 Glenwood Springs, Colorado 61601 Phone (303) 945-8212 INDIVIDUAL SEWAGE DISPOSAL PERMIT 1, PROPERTY Owner's NamefUkdO4d Erg - Present Address 1t %9n ,rlr b nn System Location / �a • t Legal Description of Assessor's Parcel No a I IQ -6273 -()) - ,,h,,ra - nf Permit 1_ 3 9 5 d Assessor's Parcel No. rI chis does not constitute a building or use permit. Ca. (Ql-'1 7000 rjretc$ Phone • a SYSTEM DESIGN �ptic Tank Capacity (gallon) Other Percolation Rate (minutes/inch) Number of Bedrooms (or other) Required Absorption Area - See Attached Special Setback Requirements: Date Inspector FINAL SYSTEM INSPECTION AND APPROVAL (as installed) Call for Inspection (24 hours notice) Before Covering Installation System Installer Septic Tank Capacity Septic Tank Manufacturer or Trade Name Septic Tank Access within S" of surface Absorption Area Absorption Area Type and/or Manufacturer or Trade Name Adequate compliance with County and Stats,r�a�ulat�ion�s/requiremejnntts� �� ��(/���//�� *Pie Other/� < i7Y M 1—'��� alb *Pie Date `.0 any S O' Inspector RdfAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE CONDITIONS: 1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter 25, Article 10 C.R.S. 1973, Revised 1984. 2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con- nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3. Any person who constructs,alters, or installs an individual sewage disposal system in a manner which involves a knowing and material variation from the terms or specifications contained in the application of permit commits a Class I, Petty Offense ($500.00 fine — 6 months in jail or both). White - APPLICANT Yellow - DEPARTMENT INDIVIDUAL SEWAGE DISPOSAL SYSTEM APPLICATION OWNER eu al i / rn yy �/%g,�//1' 4 E�1�'3/ v/ isini t gne) ' ADDRESS / 10�D (mi,/gb 152,4-/died(7 dPHONE Pg: -V-77/71/.7 CONTRACTOR OW.4)a ADDRESS PHONE PERMIT REQUEST FOR (>, NEW INSTALLATION ( ) ALTERATION ( ) REPAIR Attach separate sheets or report showing entire area with respect to surrounding areas, topography of area, habitable building, location of potable water wells, soil percolation test holes, soil profiles in test holes (See page 4). LOCATION OF PROPOSED FACILITY: /� / < ,�z Near what City of Town (gr a~</44. 'Size of Loot�5 1�/`�/l Legal Description or Address / q0 9 silty/` b /5;2,n -the/ (k ZL WASTES TYPE: p4 DWELLING u ( ) TRANSIENT USE ( ) COMMERCIAL OR INDUSTRIAL ( ) NON-DOMESTIC WASTES ( ) OTHER—DESCRIBE BUILDING OR SERVICE TYPE: 6411 37/1/ Number of Bedrooms TWO Number of Persons —rU0 ( ) Garbage Grinder 4 Automatic Washer (Dishwasher SOURCE AND TYPE OF WATER SUPPLY: ( ) WELL (A SPRING ( ) STREAM OR CREEK If supplied by Community Water, give name of supplier: DISTANCE TO NEAREST COMMUNITY SEWER SYSTEM: A,eriabfl L/ 2,`j%ILQS Was an effort made to connect to the Community System? SR/LI/Mg A site plan is required to be submitted that indicates the following MINIMUM distances: Leach Field to Well: 100 feet Septic Tank to Well: 0 50 feet Leach Field to Irrigation Ditches, Stream or Water Course: 50 feet Septic System (septic tank & disposal field) to Property Lines: 10 feet ',UR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT WILL NOT BE ISSUED WITHOUT ITE PLAN. (5 5$'/5 /t ,�/Ve f' t 6/ry ' gt t,rcOUND CONDITIONS. f ixilli Inrn Depth to first Ground Water Table Percent Ground Slope TYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED: SEPTIC TANK ( ) AERATION PLANT ( ) VAULT ( ) VAULT PRIVY ( ) COMPOSTING TOILET ( ) RECYCLING, POTABLE USE ( ) PIT PRIVY ( ) INCINERATION TOILET ( ) RECYCLING, OTHER USE ( ) CHEMICAL TOILET( ) OTHER -DESCRIBE FINAL DISPOSAL BY: 3 fl'/i52%//t 74 , /6/1 ( ) ABSORPTION TRENCH, BED OR PIT ( ) EVAPOTRANSPIRATION ( ) UNDERGROUND DISPERSAL ( ) SAND FILTER ( ) ABOVE GROUND DISPERSAL ( ) WASTEWATER POND ( ) OTHER -DESCRIBE EFFLUENT BE DISCHARGED DIRECTLY INTO. WATERS OF THE STATE? ,4 D RCOLATION TEST RESULTS: (To be completed by Registered Professional Engineer, if the Engineer does the Percolation Test) Minutes per inch in hole No. 1 Minutes per inch in hole No. 3 Minutes per inch in hole No. 2 Minutes per inch in hole No. t1 Name, address and telephone of RPE who made soil absorption tests: / i -P O? C Name, address and telephone of RPE responsible for design of the system:,.efS Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and additional tests and reports as may be required by the local health department to be made and furnished by the applicant or by the Local health department for purposed of the evaluation of the application; and the issuance of the pennit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any allification or misrepresentation may result in the denial of the application or revocation of any permit granted based n said applic i.in 1e: • a. • , •-r perjury as provided by law. /// Snib Of/ Signed 6' Date PLEASE DRAW AN ACCURATE MAP TO Yntin PP nPPPTVI irs • HEPWORTH-PAWLAK GEOTECHNICAL 1 April 30, 2004 Bill Hubbard 10820 Charbono Point San Diego, Califomia 92131 Hepworth -Proal, veorechnical, Inc 502C' Comity R,,,1 lii C,I ,rade -1601 Phane q;<..,4i-74h8 cnt.II hrv•imewuteCI Job No. 104 295 Subject: Percolation Testing and Observation of Backhoe Pits, Proposed Residence. 1906 Road 132 (Mitchell Creek Road), Garfield County, Colorado. Dear Mr. Hubbard: As requested, a representative of Hepworth - Pawlak Geotechnical, Inc., performed percolation testing at the subject site. The testing was done in general accordance with our agreement for professional services to you, dated April 13, 2004. Additional pits were observed in the building area for foundation design. The proposed residence will consist of a single story wood frame structure over a crawlspace. The septic disposal system will be located uphill to the north of the residence. Foundation Design Recommendations: The subsurface conditions at the site were evaluated by observing two exploratory pits in the building area and one profile pit in the septic disposal area at the approximate locations shown on Figure 1. The pits had been excavated prior to our arrival on-site. The subsoils encountered, below about '/2 to 1'% feet of topsoil, consist of silty sand and gravel to the pit depths of 21/2 and 3 feet in the building area and 101/2 feet in the septic disposal area. No free water was observed in the pits and the soils were slightly moist to moist. Considering the conditions exposed in the pits and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for an allowable soil bearing pressure of 1,500 psf should be adequate for support of the proposed residence. The subsoils could compress when wetted under load and there could be some post -construction settlement of the foundation if the bearing soils become wet. Footings should be a minimum width of 18 inches for continuous walls and 2 feet for columns. The existing fill, topsoil and loose disturbed soils in footing areas should be removed and the bearing level extended down to the undisturbed natural soils. We should Bill Hubbard April 30, 2004 Page 2 observe the completed foundation excavation to evaluate the exposed soils for bearing conditions prior to concrete placement. Exterior footings should be provided with adequate soil cover above their bearing elevations for frost protection. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining structures should also be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 45 pcf for on-site granular soil as backfill. Structural fill placed beneath slab -on -grade areas can consist of the on-site granular soils compacted to at least 95% of standard Proctor density at a moisture content near optimum. Backfill placed around the structure should be compacted and the surface graded to prevent ponding within at least 10 feet of the building. Percolation Testing: Percolation tests were conducted on April 15, 2004 to evaluate the feasibility of an infiltration septic disposal system at the site. One profile pit and three percolation holes were dug at the locations shown on Figure 1. The test holes (nominal 12 inch diameter by 12 inch deep) were hand dug at the bottom of shallow backhoe pits and were soaked with water one day prior to testing. The soils exposed in the percolation holes are similar to those exposed in the profile pit and consist of about 11/2 feet of topsoil overlying silty sand and gravel to the pit depth of 101/2 feet. The percolation test results are presented in Table 1. The percolation test results indicate an infiltration rate between 3 and 7 minutes per inch with an average of 5 minutes per inch. Based on the subsurface conditions encountered and the percolation test results, the tested area should be suitable for an infiltration type septic disposal system. We recommend a professional engineer design the septic disposal system. Limitations: The recommendations submitted in this letter are based on our observation of the soils exposed within the backhoe pits. This study is based on the assumption that soils at other part of the building and below the design bearing level have equal or better support than those exposed. The risk of foundation movement may be greater than indicated in this report because of possible variations in the subsurface conditions. If variations are encountered in the foundation excavation, we should be notified to re- evaluate the recommendations contained in this letter. Our services do not include determining the presence, prevention or possibility of mold or other biological fnh Nn 1(14 7Q5 Bill Hubbard April 30, 2004 Page 3 contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH - PAWLAK GEOTECHNICAL, INC. 0 Jody Z. %Adamson, Jr., P.E. `� attachments Figure 1 — Location of Exploratory Pits and Percolation Test Holes Table 1 — Percolation Test Results cc: Sopris Engineering — Attn: Yancy Nichol • 0.F at.. Inn 10 C 1" proximate Location •f Previous Shed and Pop sed Location of New ed. = 20 o� 91'/ ck PIT 2 �ecb. APPROXIMATE SCALE O IL 104 295 HEPWORTH—PAWLAK GEOTECHNICAL, INC. LOCATION OF EXPLORATORY PITS AND PERCOLATION TEST HOLES Figure 1 HEPWORTH-PAWLAK GEOTECHNICAL, INC TABLE 1 PERCOLATION TEST RESULTS JOB NO 104 ?c' - HOLE NO HOLE DEPTH (INCHES) LENGTH OF INTERVAL (MIN) WATER DEPTH AT START OF INTERVAL (INCHES) WATER DEPTH AT ENO OF INTERVAL (INCHES) DROP N: WATER LEVEL (INErES) AVERAGE PERCOLATION PLT-: ' IM IN /INCH P-1 56 10 Water added Water added Water added Water added Water added Water added Water added 4 1/2 31/2 3 4 0 - 4 1/2 31/2 4 1/2 31/2 41/2 1/2 4 1/2 31/2 4 1/2 31/2 4 1/2 31/2 P-2 56 10 Water added Water added Water added Water added 51/2 2 31/2 4 2 1/2 1 1/2 51/2 2 3 1/2 6 23/4 3 1/4 23/4 11/2 1 1/4 53/4 21/2 31/4 21/2 1/2 _ 51/2 3 21/2 P-3 70 10 Water added Water added 13/4 1 3/4 1 1/2 1/2 71/4 43/4 21/2 43/4 3 13/4 3 2 1 2 11/4 3/4 7 • 51/4 13/4 51/4 41/4 1 7 Note. Percolation test holes were hand dug in the bottom of backhoe pits and soaked on April 14, 2004 Percolation tests were conducted on April 15 , 2004. The average percolation rates were based on the last two readings of each test. • May 7, 2004 Bill Hubbard 10820. Charbono Point San Diego, CA 92131 RE: Hubbard Property House Reconstruction — Proposed OWS System, 1906 County Road 132, (Mitchell Creek Road), Garfield County, CO SE Job No. 24057.01 Dear Mr. Hubbard: Pursuant to your request this letter/report presents our findings in regard to the feasibility and design of an engineered Onsite Wastewater System (OWS) for the above referenced Site. This design is based on our evaluation of the site conditions with information provided by others for use in supporting your application to Garfield County. Our recommendations are in accordance with Garfield County and the State of Colorado ISDS Regulations. Garfield County must permit any proposed improvement to the site. We have reviewed the information forwarded to us, formulated an OWS design and created a site sketch with construction details as part of our scope of work. Conclusions Based on our fmdings we believe that the design and installation of an approved OWS system is feasible in accordance with the Regulations of Garfield County and the State of Colorado. It is our understanding that the proposed improvements to the property include the construction of a 2 -bedroom home to replace the structure that was lost due to fire. We recommend that a new 1000 -gallon septic tank be installed and equipped with a duplex pump bio -tube vault dosing assembly and associated piping and controls. The effluent from the septic tank will pressure discharge to a 186 square foot soil absorption trench system utilizing gravelless leaching chambers. The soil absorption system can be installed in natural soils with 12" of filter sand media placed below the chamber. The sand filter absorption system will provide secondary treatment of wastewater for infiltration into the ground. The trenches will be located within the required setbacks up gradient of the proposed house, as delineated on the attached plan. The system will meet all required setbacks and be installed within the general boundaries indicated on the plan. Our Design is outlined below and delineated on the attached site plan. Site Location and Existing Conditions The subject site is located at 19061906 County Road 132, (Mitchell Creek Road), in Garfield County, Colorado. The site is bounded in to the east by steep mountain terrain, to the west by Mitchell Creek and to the north and south by adjacent lots. The site has moderate to steep slopes (10%-55%) toward the southwest. The site is covered with native grasses, scattered pinyon and juniper trees and scrub brush. Domestic water will be supplied by an onsite spring. 502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311• Fax (970) 704-0313 SOPRIS ENGINEERING • LLC civil consultants Bill Hubbard SE Job No. 24057.01 May 7, 2004 Page 2 Proposed Site Conditions It is our understanding that you intend to construct a 2 -bedroom 1500 S.F. house at the location of the previous structure. The maximum number of rooms to be utilized as bedrooms in the structure is 2. The proposed improvements will include a new OWS system with appropriate site grading. The new structure is to be generally located as shown on the plan. Subsurface Conditions A subsurface investigation was conducted on April 15, 2004 by Hepworth-Pawlak Geotechnical, Inc. (HP). The HP report is dated April 30, 2004, Job Number 104 295. The subsoil encountered at the site consists of 1-1/2 feet of topsoil overlying silty sand and gravel to a depth of 10 feet. Groundwater was not encountered in the excavations and profile pit at the time of the observations. The results of percolation test performed at the site indicate a rate of 3-7 minutes per inch. We are using 15 minutes per inch for design purposes. Additional observations and evaluations will be performed during construction to confirm assumptions made and assess any design changes that may be required. Design Criteria The design flow is calculated as follows: A 2 -bedroom home design with a resident population based on 2 persons /bedroom = 4 persons. From the Garfield County I. S. D. S. Regulation: Max. Design flow (Qd) = # of people x (avg. flow) x 1.5 gal/person/day. Gallons per day per person for the subject house = 75 gal/person/day Assume 4 -person population. Qd = 4*75*1.5* =450 gal/day Septic Tank Design Based on Design Flow Qd. Qd = 450 gal/day Volume (V) of tank = Design Flow * 1.25 (30 hour retention time) V = 450 gal/day * 1.25 days = 563 gallons Use one 1000 -gallon dual compartment concrete septic tank Bill Hubbard SE Job No. 24057.01 May 7, 2004 Page 3 Soil Absorption System Design The field is sized by using the standard absorption area equation. A soil absorption trench system, utilizing gravelless chambers is recommended. The State allows a 50% area reduction for the use of gravelless infiltration chambers in a trench configuration. The chamber units may be installed in native soils. Soil replacement with sand may be used in select locations if any scattered cobbles or rocks are encountered. We are using 15 minutes/inch for design to account for permeability through the biomat. Based upon the design percolation rate, the standard absorption area equation is: A (SF) = Qd *(t) 1/2 : where A = Area; Qd = Design flow (gal/day) 5 t = time in minutes This design calculation results in a recommended minimum absorption area: A = 450 *(15)'1 = 349 sq. ft. 5 Apply a 50% reduction for utilizing gravelless infiltration chambers in a trench configuration. 349 x 0.5 = 175sq. ft. Assume 15.5 square feet per chamber: 175 sq.ft. = 11.2 chambers Use 12 chambers 15.5 sq.ft/chamber(50%) Use 186 SF of trench with gravelless chambers: Assume 3 -foot wide trenches with 6.25 -foot long chamber units. We recommend using a trench system composed of 2 trenches 38 feet long and 3 foot wide, containing 6 standard leaching chamber units in each trench. We recommend the placement of a minimum of 12" of sand in the trenches below the leaching chambers to provide a consistent absorption surface and provide for better treatment. In additional we recommend that the trenches be pressure dosed. Excavate absorption trenches to accommodate a minimum 186 SF of interior surface area. Effluent Dosing Pump System The site grades require the use of absorption trenches installed up gradient from the house. An effluent pump system will be installed to dose effluent from the septic tank to the distribution laterals in each trench. The pump system shall incorporate a duplex pump system in the event that one pump fails. The Orenco Systems, Inc. pump -basin bio -tube vault system is recommended to be installed in the secondary compartment of the septic tank. A standard duplex 2" SCHD —40 discharge plumbing assembly with flex hose with isolation ball valves and quick disconnect threaded couplers, high head dosing pumps w/ automatic controls and alarms shall be installed components in the pump basin. The vault will utilize a maintainable bio -tube effluent filter. The controls shall provide for alternate operation of each pump. Automatic float switches including a pump off switch, a 1St pump activation switch, a second pump activation lag switch and a high water float with alarms shall be incorporated in the system. Install Bill Hubbard SE Job No. 24057.01 May 7, 2004 Page 4 watertight risers with insulated lids at the surface to easily inspect and maintain system components from the surface. Extend discharge lines up to within 12" of the access lid to provide easy access for maintenance of the pump. The pressure discharge plumbing assemblies shall be installed for cold weather application and configured to allow the drain back of liquid in the transport line through an orifice drilled in a fitting, on the discharge side, at the bottom of the vertical distribution loop near the outlet port in the access riser. The dosing volume shall be a minimum of 40 to 75 gallons per dosing cycle. The velocity of the pumped effluent shall be maintained between 4-5 feet per second. The Electrical requirements will be single phase, 115 volts. Install pumps assembly, riser, electrical systems, floats and discharge line per manufactures installation guidelines. Use Orenco systems model p 200511 dosing pumps. The system shall be inspected by a qualified person every six months. All installation and maintenance shall be performed by a qualified person, in accordance with the Installation & Maintenance Guidelines for the Orenco Systems components. We recommend that verification of the specified pump size and performance should be performed by the supplier and/or manufacturer. Contractor shall confirm sewer service components, pump specification parameters and follow manufacturers recommendation for pump installation and performance. Controls and electrical service for the selected pumps shall be coordinated with the pump supplier, the electrician and contractor. Effluent Distribution System The transport lines from the dosing pump assemblies to the absorption field shall be HDPE SDR -11 or schedule 40 PVC with a maximum diameter of 1.25 inches. The transport lines will be installed to allow the drain back of effluent to each respective septic tank pump basins. The effluent will be pressured to the distribution header pipe tee installed adjacent to the up gradient trench. The flow will split to each trench for pressure distribution through the individual 1 1/4" perforated distribution laterals running the length of each trench to insure equal distribution over the field. The perforated distribution laterals will be schedule 40 pipe with the orifices oriented upward to spay against the interior of the chambers. The lateral shall have 3/16" diameter orifices spaced along the pipe every 2 feet. A 3/16" orifice shall be drilled on either end of the distribution lateral to allow for drainage. A splash plate or orifice shield shall be placed below the drain orifices to prevent scour. 4" inspection ports will be installed on the end chambers. The dosing volume shall not exceed 75 gallons. Control Systems An Orenco Systems control box will control all functions and monitoring of the installed system. We assume that the control panel will be installed on the outer wall with a line of site to the tank. Electrical wires to the pump shall be installed into electrical conduit and shall be of suitable length to reach the pump assembly riser on the tank. A visual indicator should be visible when one pump fails to operate. A visual and audible alarm indicator shall be activated if the second pump fails to operate. The control panel may be equipped with a telemetry system connected to a phone line that will automatically call the appropriate service provider if the high water alarm is activated. We recommend that an electronic data recorder be installed to record the pumping cycles to determine the sewage flow rates. Bill Hubbard SE Job No. 24057.01 May 7, 2004 Page 5 OWS Operation and Maintenance The engineered system shall be inspected on a regular basis and be properly maintained. The responsibility for repair and maintenance of the system will remain with the Lot Owner. The owner or a qualified technician should inspect the OWS and perform maintenance and repairs necessary to ensure that the system is operating properly. The effluent filter shall be maintained when the tank is pumped or as needed. Suitable component handles and extensions on the filter assembly will be installed to provide easy maintenance. We recommend a periodic inspection be performed every 6 months. The OWS system should require minimal maintenance. Several factors influencing the need for maintenance include: actual wastewater flows versus design flows, the volume of kitchen/domestic waste (excluding human waste and toilet paper), excessive household chemicals and other toxic liquids. The tank, dispersal field and other applicable treatment system components should be visually inspected bi- annually for debris, wear, damage, leaks, or other potential problems. In general, for a properly utilized system, septic tanks should be pumped and inspected every 2 - 4 years. The effluent filters should be cleaned every six months and at the time of pumping. Absorption fields should be maintained with suitable cover and kept free of root invasive plants. Positive surface drainage away from the absorption field should be maintained. Construction and Inspections Prior to construction of the permitted system the engineer should be contacted by the contractor and owner well in advance to provide adequate time to discuss the system components with the contractor, answer questions, resolve any conflict issues and schedule inspection site visits based on construction progress. County Regulations require that the Design Engineers of record perform site inspections of the permitted system during construction and provide "As -Built" documentation of the installed system to the County after construction is complete. General Notes 1) All materials and installation practices shall conform to the Garfield County Individual Sewage Disposal Regulation. 2) All sewer lines and distribution lines in the system shall be 4" Schedule 40 or SDR -35 PVC unless specified otherwise on the plans. 3) Install a two-way clean out on the service line from the house to the septic tank. 4) The system shall be plumbed to distribution effluent into the trenches with equal distribution. 5) The contractor shall ensure that the concrete septic tank and sewer lines are watertight. 6) The trench area must be protected to prevent damage from vehicular or livestock traffic and must be crowned to divert drainage runoff away from the trenches to minimize surface infiltration. 7) The leaching chambers shall be installed level in each trench. The top of the backfill over the chambers shall be covered with filter fabric or other suitable pervious material to prevent the migration of fines from the overlying topsoil layer. • V Bill Hubbard SE Job No. 24057.01 May 7, 2004 Page 6 8) The trenches must have a minimum cover of 12 inches. A final cover of topsoil suitable for vegetation, a minimum 4" deep, shall be placed from the top of the pervious cover layer to the finished surface grade. 9) The absorption trenches must be sodded or covered with vegetative ground cover. Our design and recommendations are based upon data supplied to us by others. If subsurface or site conditions are found to be different from those presented in this report, we should be notified to evaluate the effect it may have on the proposed OWS. If you have any question or need any additional information, please call. Sincerely, SOPRIS ENGINEERING, LLC Paul E. Rutledge titin"- . DesimY�eae: Projeccf EntemmY» SAN DIEGO COUNTY SHERIFc•c October 5, 2004 Bill Hubbard 10820 Charbono Point San Diego, CA 92131 RE: AS -BUILT OWS - Hubbard Property House Reconstruction — Proposed OWS System, 1906 County Road 132, (Mitchell Creek Road), Garfield County, CO SE Job No. 24057.01 Dear Mr. Hubbard: Pursuant to requirements, this letter provides documentation that the new Onsite Wastewater System (OWS) recently installed at the above referenced site is in general compliance with the permitted design. Sopris Engineering inspected the excavations and the installation of system components at various times during construction prior to final backfill. The system constructed on site was designed and built to serve the needs of the newly constructed 2 -bedroom house. Sopris Engineering performed visits to inspect and document the as built conditions of the constructed system. We have coordinated our efforts with the system installer. The as built conditions and installation of the new OWS components is in compliance with the permitted design specifications for the system. The System was installed in accordance with Garfield County Regulations; the design presented in the Sopris Engineering design drawing dated May 6, 2004 and the report dated May 7, 2004. A 1000 -gallon dual compartment concrete septic tank was installed with a duplex pump vault dosing system with automatic controls. The absorption field was constructed with a total of 12 standard leaching chambers in 2 absorption trenches. The trenches contain 6 chambers each. The chambers were placed over 12" of sand overlying the onsite - soils. The chambers were backfilled with screened native soil. The trenches were installed level. Inspection ports were installed on each row at the end chamber. The effluent is pumped from the tank through a pressurized transport pipe that splits to each trench and distributes effluent through 1.25" perforated distribution laterals installed along the length of each trench. The chambers were installed in suitable soils consistent across the field. No ground water was encountered to a depth of 10 feet. The septic tank, dual pump dosing vault assembly, distribution piping, and the absorption field was constructed utilizing specified materials and installed according to design. The minimum setback distances have been maintained. OWS Operation and Maintenance All components of the engineered OWS shall be inspected on a regular basis and be properly maintained. The re establishment of vegetative cover over the field and responsibility for inspection and maintenance of the system will remain with the Lot Owner or the owners representative. The owner shall periodically inspect the OWS and to perform all maintenance and repairs as necessary to ensure that the system is in good operating condition and performing as designed. The OWS should require minimal maintenance. Several factors influencing the need for maintenance include: actual wastewater flows versus design flows, the volume of kitchen/domestic waste (excluding human waste and toilet paper), excessive household chemicals and other toxic liquids. The tank, sanitary tees and effluent filter should be visually inspected bi-annually for clogging debris, damage, leaks, or other 502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313 SOPRIS ENGINEERING • LLP 2-d caaaocaar civil consultants Z nano enc:Rn Crr /T JQW Bill Hubbard SE Job No. 24057.01 October 5, 2004 Page 2 potential problems. In general, for a properly utilized system, septic tanks should be pumped and inspected every 2 - 4 years. The effluent filter should be cleaned every six months and at the time of pumping. Absorption fields should be maintained with suitable vegetative cover and kept free of root invasive plants. Positive surface drainage away from the absorption field should be maintained. If you have any question or need any additional information. please call. Sincerely, SOPRIS ENGINEERING, LLC %,/a6 Paul E. Rutledge Design Engineer ncnc oor • cn en 1T Jeu SAN DIEGO COUNT' SHERIPP,O . _ To: Andy Schwaller Garfield Co. From: Bill Hubbard 1906 Co. Rd. 132 Glenwood Springs Colo. Regarding: Building permit #9127 & septic permit 3954 Please include the following septic inspection/approval in our file on the above building permit. 1 spoke to you on the phone on 3-16-2005 regarding an y dens}on on our permit. Thank you for granting it. Sincerely, Bill Hu neve Boc•cn en /i JEW