HomeMy WebLinkAboutMisc Correspondenceftl-rr+ñdnu* {^w* / z.,l ç*t 5 {,' ùrlì"' k CLo./r'q frm"+ I 5 6 7 8 CORRECTION NOTICE t2-L9-20L6 Foam roof insulation must be covered with a thermal barrier as per section 2603.4 2009 lBC. This is typically % gypsum wall board. This insulation could also be removed and replaced with detail from architect Sheet 42.1-. llluminated means of exits and exit signs are required as per Section L006 and 10LL 2009 lBC. Water heater cannot be installed in the bathroom and must be moved Sec 303 2009 IFGC. Permit must be amended to add the new prefab smoke house structure. A design professional will need to inspect the structure and foundation and provide a letter stating that it meets the 2009 lBC. The gas leak in this building must be repair prior to any further use. Approved holding tank must be installed to receive floor drain materials from kill rooms. Septic system for processing portion of the building must be installed. Egress from west end of structure must be kept clear of storage items. Other Conditions of Permits BLCO-7-14-3288 must be met. e*-t)ttt îlD- 93o-51øz ù-il þ*u, t)*o* ? Tn*-tçS 4-, D*rr Lqç*r Cusxf, 'fF ¡(*FuVt (x'' @ ñq tJ mnu úIuffi1ø'.No G#î*>flkî w* fðxv| fll p* rJ fl ù ,) 4l t)e'n þ* Ðqrr¿u ¿)ptn' È,,v4 DDf CUu#,ilt tl t tI_ Building History for O482 CR 315 Silt, Colorado Andy Schwaller Sept. 22,2Ot7 L. Permit 87957-7-2003. Then owner Fred Billmeyer built a wood working shop. 2. Ken Sack bought the property and started Eagle Spring Organics. 3. Sometime around 20t2-L4 Sack retrofitted a refrigerated meat processing plant within the existing structure without any building permits. He then starting advertising that the structure was to process USDA certified meat and applied for a USDA permit. 4. Sack made application for a county land use permit for a commercial USDA slaughter house. Through this process a permit was also required from the USDA that required proof of adequate sewage for the facility. The USDA permit was never issued. 5. Both the lack of a building permit to convert the wood shop to a new use and inadequate sewage or OWTS promoted Building Permit BLCO-07-14-3288 and SEPT-09-14-3401 late in 2015. 6. The land use permit was never completed due to a lack of adequate city treated water. There were also issues with fire district access and fire flow. A pond was proposed to provide a source of water for a fire. Due to airport easements established with the prior owner, a pond was not allowed at the end of the airport. For this and other reasons, the land use permit died on the vine. 7. The building permit was still pursued based on a Use by Right custom meat processing use 8. Please see string of various e-mails, NOV, and an abundance of patience that lead to various inspections to complete the project. 9. At the end of the day, due to the lack of water, the custom butchering plant is limited to a kill room. The butchering or meat processing portion of the building is approved only for storage due to this lack of adequate water. Also a required separate septic OWTS for this portion of the structure was never installed. Actual butchering is done in another property owned by Sack in Rifle. The bathrooms in the structure are hooked up to a different septic as perthe owner. 10. ln order to do Custom Meat Processing in this structure in the future, a separate OWTS for the floor drains and sinks needs to be installed. Proper State and possibly USDA permits will also need to be obtained. ñ n-ur*G* Itt¡a-rr¡. Jrrr.z+ l|*n ûru,^, il PraL t t-1- 2a t7 lP*'r D,û d** Ç¡-osr þ.'-? Andy Schwaller To: Cc: Sent: Subject: From:Andy Schwaller Friday, September 22,2017 L2:4L PM 'Kenneth Sack' 'Orrin Moon';'Gore, Melvin - FSIS';Jim Wilson Structure at482 CR 3L5-Eagle Springs Ken, We did a final inspection yesterday and are ready to close out the permit. The only things pending is a walk through by the local fire district and certification from a structural engineer that the smoke house addition meets the structural provisions of the building code. Once these items are completed, the use of the building will be limited to a kill room and cold storage within the proposed processing area of the slaughter house. The processing area is limited to storage because of the lack of available water and a separate septic system to service this area. please forward the engineer's review when completed. Orrin Moon with the fire district will send us an email once he has completed his inspection. Thanks, Andy Schwaller Building Official Garfield County 1 Andy Schwaller From: Sent: To: Cc: Subject: Garfield County q->^?Þt7 - A 5 Andy Schwaller Monday, June 26,20L7 3:25 PM 'Kenneth Sack';'Calvin' Jim Wilson;'Orrin Moon'; Feck - DORA, Norman Site Visit June 22,20L7 a1482 CR 3L5 Slaughter House Facility Ken, We did a walk-through of the facility with Mark. These items are pending before we can close out the building permit 1. We could not find a sign off by the state electrical inspector. Your electrical contractor should be able to provide a record of a final inspection. -*u frL{- 2. The sheet rock on the ceiling looked completed. A wall with sheetrock needs to be built in the loft mechanical area to seoarate the foam insulation in the ceiline of the attic space from the mechanj.cal loft area qnd rest of thestructur".?* t)ux tN fuç¡la <f- lþLauu. f¿$#t'tTkaa )¡/tt"47/- þccooZ 3. The venting of the water heater needs to be upgraded. Presently it is held in place with duct tape. O. Ä. 4. Egress from the door below the mechanical loft out the west end of the building needs to be maintained.¿, þ 5. Design professional nqeds_=to inspect the smoke house addition to verify the construction of the structure meets the building code. Å/"f l. r¡t 6. Holding tank for the kill room floor drains must be in place. Tank needs to have access for commercial removal of the contents. O'K- 7. Other state permits must be in place. 3 B. Limited use of the processing portion of the building due to a lack of available water has been noted. This portion of the structure can only be used for storage until such time both water and,a cqmpletely separate septic system is installed to service this area. No.Tf,4 tll þ tt*lc F K. ö rct g. Fire district must walk through and do their own final inspection and provide county with a letter or e-mail for fire code related items. ft*lr g Thanks for your attent¡on to these details. ?Ft+++' Andv schwaller tJ*,, Ttl.¡*¿Building Official ld Count! Community Development 108 8th Street, Suite 401, Glenwood Splings, CO 81601 Offlce 9'7 O-945 -8212 Fax: 97 A484-347 0 Mr. Ken Sack Eagle Springs Organic P.O. Box 351, Rifle CO 482 CR 315 silt, co 81.652 June7,2OL7 Re: Notice of Violation Mr.Sack, The following permits have expired related to the slaughter house operations located at 4g2 CR 315 in Garfield county as per section 105.5 of the 2015 lnternational Building Code (lBC) as amended and adopted by Garfield County and as per the Garfield County Regulations #43 for onsite waste water systems, lt is also unlawful to be occupying th¡s structure without the present use of the structure to be in compliance with the building code adopted by Garfield County as per Sections 111 and 1I"4 of the 2015 tBC. Building permit BLCO-07-14-3288 and septic permit SEPT-9-14- 3400 have expired. The use of the structure as a kill room/slaughter house needs to cease and desist immediately untilthe permits are renewed and completed. Possible hazards or unsafe conditions related to this Notice of Violation: L. Exposed foam insulation in the ceiling constitutes a fire hazard for the occupants and firemen should there be a fire in the structure. 2. Changes to electrical systems have not been permitted or state verification of the permits submitted to the county has not been done' 3. Egress from the structure is hampered due to storage of materials at the exit doors and the lack of required exit illumination. 4. Material from the kill room floor drains is being dumped directly on the ground outside the structure. 5. Verification of septic installations has not been done' 6. Other items already documented in prior correspondences' 7. Other items from other agencies still pending review' A copy of this Notice of Violation will be sent to Garfield County Public Health, Colorado Department of Agriculture, local fire district, USDA, State Electrical lnspector and the Garfield County Attorney's office for review and follow-up by these agencies and departments. #äÇ* Andy Schwaller Building Official Garfield CountY Enclosed: Sec 105.5,111& 114-2015 lBC. Mailed: Reg return receiPt lor'l ß?à 000 I fitr$ çttl 105.5 Expiration. Every permit issued by the building official under the provisions of this code shall expire by limitation and become null and void if the building or work author¡zed by such permit is not commenced within 180 days from the date of such permiÇ or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of l.go days. Permíts must pass a required inspection during every 180 day period after each ínspection in order not to be considered suspended or abandoned. on expired permits, before such work can be recommenced, a re-issued or new permit shall be obtained. The fee for a re-issued or new permit shall be one-half the permit fee of the or'iginat permir, provided no changes have been made in the original plans and specificatlons for such work, and further provided that such suspension or abandonment has not exceeded one year' changes in plans and specifications shall require an additionar permìt fee and plan review fee as described in section 109. Any nullified permlt where the suspension or abandonment have exceeded one year will require the permittee to pay a new permit fee plus plan review fee. Any person holding an unexpired and valid permit may apply for an extension of time to commence work, return to work or complete work under that permit by submitting a wr¡tten request describing good and satisfactory reason for such extension. Thís reguest shall be received þrior to the date on which the oríginal permit expires or becomes null and void. An extended permit is valid for 1g0 days irom the date of the extension, does not require compliance with codes adopted since the original permit was issued, and does not requ¡re payment of new fees' No permit shall be extended more than twice. when a permit has expired or been nullified and a new addition of the bu¡ld¡ng code has been adopted, the original plans shall be reviewed and required to comply with the current code' The permittee shall pay a new plan review fee based on the current projected valuation plus the applicable fee listed above sEcnoN 111 CERTIFICATE OF OCCUPANCY [Al 111.1 Use and occupancy. A building or structure shall not be used or occupied, and a change in the existing use or occupancy classification of a building or structure or portion thereof shall not be made, until the building afficiolhas issued a certificate of occupancy therefor as provided herein' lssuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordínances of the jürisdiction' Exception: Certificates of occupancy are not required for work exempt from permits in accordance with Section LOs.2. sËcfloN 114 VIOLATIONS lAl 114.X Unlawful acts. lt shall be unlawful for any person' firm or corporat¡on to erect, construct, alter, extend , repair' move, remove, demolish or occupy any building, structure or equipment regulated by this code, or cause same to be done' in conflíct with or in violation of any of the provisions of this code. ÍAlLl4.2Notice of violation. The building officiolis authorized to serve a notice of violation or order on the person responsible for the erection, construction , olterotion, extension' repair, moving, removal, demolition or occupancy of a building or structure in violation of the provisions of this code, oi in violation of a permit or certificate íssued under the provisions of th¡s code. Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation. [Alll4.3Prosecutionofviolation.lfthenoticeofviolation is not complied wíth promptly, the buitding officialis authorized to request the legal counsel of the jurisdictÍon to lnstitute the appropriate proceeding at law or in equity to restra¡n, correct or abate such violation, or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of this code or of the order or direction made pursuant thereto' [Al 1X4.4 V¡çlation penalties. Any person who violates a provision of this code or fails to comply with any of the iequirements thereof or who erects, constructs, alters or repairs a building or structure in violation of lhe approved construction documents or directive otthe building officiol' or of a permit or certificate issued under the provisions of this code, shall be subject to penalties as prescribed by law' U.S. Postalgervice'" CERTIFIED MAILO RECEIPT Damestlc Malt OnlY 'iT LT ¡ :,ì11 L;, atlreb$ltevlsitouflñform¿tion, tft rurut { --t:rrr rt EIEE E¡ ruø FE :r F1trl fi Rgturn Total Faes i1 n¡c rãrlf ¡Jl €J'! rL a:l f:f, EI E¡ EIru EO trtE r!. Poulru¡rki î$H (Erüo19ßmð¡l lioslrlúlod sr,ää¡q¡Eag les springs ii;;:;, 482 cR 3 15 S¡¡t co 81652 illl ¡': .; i,; ', a.r{I Ëlj: U.S. Postal Servicê* CERTIFIED MAIL@ RECËIPT vlslt our t'r€bsltg åt Dômestle Mall OnlY lnslfucliolìs {\ Poslmatk Hôre q)i) Feô i4 x 3 2*1V !a,r''1.:l:il1?Tolal Poslågê & '!å Eagles Springs PO Box 351 Rifle,co 81650 otPO Ê Andy Schwaller Sent: To: Cc: From:ken sack <kensack@me.com> Friday, May 26,20L7 1-1:00 AM Andy Schwaller Wade Patton; Sheryl Bower RE: Buillding and Septic Permits We are completing the sheetrock and moving the hot water heater. Should be done next week Will let you know From: Andy Schwaller Imailto:aschwaller@garfield-county.com] Sent: Friday, May 26,20L7 10:11 AM To: Kenneth Sack <kensack@me.com> Cc: Wade Patton <wpatton@garfield-county.com>; Sheryl Bower <sbower@garfield-county.com> Subject: Buillding and Septic Permits Ken, It is time to close these permits out or to quit using the building. When can we do a final inspection? Thanks, Andy Subject: ken 1 Andy Schwaller Sent: To: Cc: From:Kenneth Sack < kensack@me.com> Thursday, April20,20l-7 10:51 PM Andy Schwaller Ca lvi n@eag lespringsorganic.com Re: Slaughter House Building Permit BLCO-07-14-3288 We have completed exit lights, are now going to remove gas hot water heater and Sheetrock area adjacent to cooler Should be done next week Ken Sack Kensack@me.com 954-249-5674 On Apr !9,2O]-7 , at 4:77 PM, Andy Schwaller <aschwaller@garfield-countv.com> wrote: Calvin and Ken, Please provide us with an update with this building permit. Thanks, Andy Schwaller Building Official Garfield County From: Andy Schwaller Sent: Wednesday, December 2I,201612:50 PM To: 'Calvin@easlesp nrc.com ' <Ca lvin@eaglesprinRsorga nic.com>;'Kenneth Sack' <kensack@me.com> Cc: Jim Wilson <jwilson@garfield >; Wade Patton <wpatton@garfield-countv.com>; Tamra Allen <tallen@garfield-countv.com>; Sheryl Bower <sbower@garfield-countv.com> Subject: Sla ughte r House Bui ld ing Perm it BLCO-07-14-3288 Calvin, Thanks for meeting with us on December L5, 2016. Attached is a list of corrections related to the building permit. Also attached are the original Conditions of Permit. These items are required prior to a final inspection of the building. ln addition, dumping of the various guts, hides and animal parts is not allowed within the aircraft easement associated with the property. This is for the safety of the incoming and outgoing aircraft and increased possibility of large bird collisions at the end of the Garfield County runway. Please note the land use permit for a USDA facility has expired. Any approval of a building permit will only be for a custom meat processing facility as defined by the USDA and CDPHE. Johnson- Carter Architects appear to be the architect of record and can help you with the various code provisions and the new smoke house structure permitting. Please note this permit has expired. lf the permitted work cannot be completed and closed out by April L,201-7, additional fees and review will be required in order to reinstate the permit. The building will also need to be vacated until a new Certificate of Occupancy can be issued. Subfect: 1 Please call with any questions Regards, Andy Schwaller Building Official Garfield County <CORRECTION NOTICE.docx> <0016_00l.pdÞ 2 Andy Schwaller From: Sent: To: Subject: Attachments: Andy Schwaller Wednesday, April L9, 2Ol7 2:L8 PM 'Calvin @eaglespringsorganic.com';' kensack@ me.com' FW: Slaughter House Building Permit BLCO-07-L4-3288 CORRECTION NOTICE.docx; 00L6-001.pdf Calvin and Ken, Please provide us with an update with this building permit Thanks, Andy Schwaller Building Official Garfield County From: Andy Schwaller Sent: Wednesday, December 2L,20161"2:50 PM To:'Calvin@eaglespringsorganic.com'<Calvin@eaglespringsorganic.com>;'Kenneth Sack'<kensack@me.com> Cc: Jim Wilson <jwilson@garfield-county.com>; Wade Patton <wpatton@garfield-county.com>; Tamra Allen <tallen@garfield-county.com>; Sheryl Bower <sbower@garfield-county.com> Subject: Sla ughter Ho use Building Perm it B LCO-07-14-3288 Calvin, Thanks for meeting with us on Decembe r 15,2016. Attached is a list of corrections related to the building permit. Also attached are the original Conditions of Permit. These items are required prior to a final inspection of the building. ln addition, dumping of the various guts, hides and animal parts is not allowed within the aircraft easement associated with the property. This is for the safety of the incoming and outgoing aircraft and increased possibility of large bird collisions at the end of the Garfield County runway. Please note the land use permit for a USDA facility has expired. Any approval of a building permit will only be for a custom meat processing facility as defined by the USDA and CDPHE. Johnson-Carter Architects appear to be the architect of record and can help you with the various code provisions and the new smoke house structure permitting' Please note this permit has expired. lf the permitted work cannot be completed and closed out by April L,2017, additional fees and review will be required in order to reinstate the permit. The building will also need to be vacated until a new Certificate of Occupancy can be issued. Please call with any questions. Regards, Andy Schwaller Building Official Garfield County I Andy Schwaller From: Sent: To: Subject: From: Sheryl Bower Sent: Tuesday, December 2O,2Ot6 I:44 PM To: Andy Schwaller <aschwaller@garfield-county.com> Subject: RE: Eagle Springs Organic Slaughter House What a mess they have going there .sherUl t. Eower, AIC?<) Garfield County Community Development Director 108 8th Street, Suite 401 Glenwood Springs, CO 81601 le70l94s-L377 From: Andy Schwaller Sent: Tuesday, December 20,2O76 9:58 AM To: Wade Patton; Jim Wilson; Kathy A. Eastley; Tamra Allen Cc: Sheryl Bower Subject: FW: Eagle Springs Organic Slaughter House From: Gore, Melvin - FSIS [mailto:Melvin.Gore@fsis.usda.gov] Sent: Monday, December L9,2OL6 2:O7 PM To: Andy Schwaller <aschwaller@garfield-countv.com> Subject: RE: Eagle Springs Organic Slaughter House Good Afternoon! Thank you for the updated informat¡on. I can read from your ema¡l that the septic system drawings that I was given have not come to fruition. That was supposed to eliminate the 4" pvc out the south side of the building. That proposed system w¡th using the 4" draining "into a tank on a trailer" certainly raised red flags for us. That is when we first informed ESO that they had to have a state or local health department approve the system. That has been 3 years now! We also expressed concern about having "adequate" water supplies (define adequate) so then they were go¡ng to haul water up to the plant above CR315 from Silt on kill and processing days. My superv¡sor and I 1 Andy Schwaller Monday, January 23,2OL7 1-1:1-9 AM Sheryl Bower FW: Eagle Springs Organic Slaughter House discussed that at length, but what we could actually do to counter the hauling situation is limited other than require testing every 6 months on a private water supply. I feel really good having Garfield County involved because your presence re-enforces our emphasis on sanitation and proper disposal of waste materials. Side note: I think the toilet facility in the processing facility may be emptying into the adjoining house's septic system, but that info is from some vague information that I received in one of the first visits up there. Thank you veiy much for what you have accomplished and the update. My new supervisor (since June) has no idea what he has inherited other than I a gave him a brief thumbnail description and he felt thatwe could involved after ESO has an approved sanitation system from Garfield County. lcan tell you, lam not holding my breath for that one, it has been so long already! Have a Happy Holiday Season! Meluin Gore, DVM, SPI{V c/o Golorado Homestead Ranches 741 West sth St. Delta, GO 81416 Office: (97O) A74 - 8637 Gef l: (97O) 371 - 8093 OFO -- Verif¡ling Food Safety and Animal Welfare every day From: Andy Schwaller Imailto:aschwaller@garfield-county.com] Sent: Monday, December L9,2016 9:00 AM To: Gore, Melvin - FSIS Cc: Kathy A. Eastley; Wade Patton; Tamra Allen; Sheryl Bower Subject: Eagle Springs Organic Slaughter House Dr. Gore, We are still working with Mr. Sack to get the building permit for the structure completed. He also needs to install a new septic system for the butcher portion of the building. We did a site inspection last Thursday on the building and took the attached pictures. I did not quite get the hanging elk in the picture, but there appeared to be elk, deer, and livestock all hanging together in the kill room. There were more cattle and maybe a pig hanging in an adjacent room. lt does not appear any animals are being butchered in the processing portion of the building. As per Mark the butcher, the animals are killed and hung at the site on Eagle Springs property above CR 3L5, then hauled to the Rifle butcher shop to be cut up and wrapped. Also as per Mark, they do not have enough water to operate a USDA butcher shop at the building above CR 315. The picture of the 4 inch PVC pipe out the back of the building is attached to the floor drains of kill room. The guts and hides are just outside the building. See picture. That is the runway to the Rifle airport in the background. Their land use permit for a USDA facility has expired. Custom processing is a use by right once they get the building and septic permits completed. 2 The custom butchering aspect of the business seems to be doing a booming business as there were quite a few animals hanging with more customers waiting to talk to Mark. I think we will have a final punch list of building related items for them to complete. We did talk to Calvin Bailey who appears to be the present manager for the farm' Card attached. He is mostly involved with the green houses but will be doing the work on the building permit issues. Let us know if you have any questions. Regards, Andy Schwaller Building Official Garfield County This electronic message contains information generated by the USDA solely for the intended recipients. Any unauthorized intercepiion of this message or the use or disclosure of the information it contains may violate the law and subject the violator to civil or criminal penalties. If you believe you have received this message in error, please notify the sender and delete the email immediately. 3