HomeMy WebLinkAbout1.17 Recorded Land Use Change Permit■[[[ I���!!4'�I��G�L4���sM�F�4��`�ll����l���if� �[ EEl ��
Revption€' 8888@I
02107/2017 03:86:29 PM ]ears Rlberico
1 of 5 Rea Fee :$0.Q0
Doc Fee:0.00 GARFIELD COUNTY CO
LAND USE CHANGE PERMIT
for
A Portion of a Parcel of Land Owned by Eva C. Uphoff Trust and Timothy
James Uphoff (Operated by WPX Energy) Located North of the Town Of
Debeque and in Section 3, Township 7 South, Range 95, West of the 6th P.M.,
Garfield County with a Project Area of Approximately 1.5 acres Within an
Overall 598.78 acre Property
(Assessor's Parcel No. 2137-012-0-001)
In accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code of 2013, as amended, and a Resolution of Approval (Resolution
Number 2015-30) of the Board of County Commissioners of Garfield County, State of
Colorado, the following activity is hereby authorized by Land Use Change Permit:
MAJOR TEMPORARY EMPLOYEE HOUSING FACILITYHOUSING UP TO 24
PERSONS AND ONSITE FOR MORE THAN ONE YEAR, AND A STORAGE
FACILITY (LAYDOWN YARD), ON A 1.5 ACRE PORTION OF A 598.78 ACRE
PROPERTY (LIPA-8191)
This Land Use Change Permit — Limited Impact Review is issued subject to conditions of
approval as set forth in Exhibit "B" and shall be valid only during compliance with such
conditions and other applicable provisions of the Garfield County Land Use and
Development Code, as amended, Building Code, and other regulations of the Board of
County Commissioners of Garfield County, Colorado.
GARFIELD COUNTY BOARD OF COUNTY
COMMIS ON S, GARFIELD COUNTY,
COLORADO
6)7• Chair an Date
sJAL-
ATTEST: 't !"«••.. ••�` a
�cazo�°
�& ftt-, 141
Cler f the Board
Page 1 of 5
mill prig sir&mi wrNW211WHURk liofid 11111
Reception#: 888801
02!0712017 03:35:29 PM ,loan Alberico
2 of 5 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD
COUNTY CO
/y
L—Al iw t A
(Project Site Plan)
S310H TNl91�1913316N3A0�
� _ °
�®
r`wwrrnnl�
�nnxo;umn,I s sHat
m mmv irsl.lemon � c
w xisirm „nu xm.roa emars� R I
f�_
-'yJs.
Uy
t
r s1S
■d�
� III'ilsl !
i83E88.�.3E4 S���S�
C.
l Ii
Housing and Storage
Facility
W
Ea
r
+D
0 I
- --•
�
o
GO
lLl }
3
0 J I
4 8
J
—' Q ro j
aaZ� 1
3
-- -- ----
eft
U j
�augiC,
a
t
Q����
Z: Z ' w
f
1k:
0 0 1--
CDtun0n.
w0��`9Q
zQLu LLI
l.l.1 EL
n- LULuq�
0
s�
II
UJ
Private
C
o�Access
001
Road
rN6
fits
t1s�1¢�
Page 2 of 5
mm NIP .11MIP I[ UIj [LAI PFu 11111I.MMIl 11MIA W.16111,1 01111
mill Form simrom wiI iiii17171i1■ im 1 ■1 11-11 1 a immimi =1 ill
Recepption#' 888801
02107/2017 03:35:29 PM Jean Alberico
3 of 5 Rec Fee;$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
Page 3 of 5
mill PrOMC IC" i �h���i��ilpi� � ��wn ■� ���
Reception#' 888801
02/07!2077 03:35:29 P[1 Jean Albarioo
4 of 5 Rec Fee:$0.00 Doe Fee:0.00 GARFIELD BOUNTY CO
Exhibit B
Conditions of Approval
Conditions Prior to Issuance of Permit
1. The Applicant shall improve the access road as proposed to meet Section 7-107,
"Semi -Primitive" standards prior to issuance of the Land Use Change Permit.
The Applicant shall provide evidence that the roadway has been upgraded and
meets the standards set forth in Section 7-107. This evidence shall be reviewed
by the Garfield County Community Development Department and the County
Contract Engineer.
Other Conditions
2. That all representations made by the Applicant in the application shall be
conditions of approval, unless specifically altered by the Board of County
Commissioners.
3. That the operation of the WPX Trail Ridge Temporary Employee Housing and
Storage Facility shall be done in accordance with all applicable Federal, State,
and local regulations governing the operation of this type of facility.
4. The facility shall maintain compliance with Storm Water Management Plan,
Drainage and Grading Plans and Reclamation for the site.
5. The Applicant shall control fugitive dust during the operation of the site.
6. The facility shall maintain compliance with Section 7-306 Lighting, with all
lighting to be directed inward and doward toward the interior of the site.
Facilities and storage tanks shall be painted a non -glare neutral color to lessen
any visual impacts.
7. The Applicant shall comply with their Noxious Weed Management Plan
including the best management practices.
8. Within 9 months of the issuance of the Trail Ridge Employee Housing Facility
Certificate of Occupancy, the Applicant shall install an Onsite Wastewater
Treatment System (OWTS) to serve the proposed facility. The installation of
the System shall be in accordance with the design and specifications as outlined
in the Application.
Page 4 of 5
■Ili NIP MSW AUt Uh VW 6VV?I 1 jW.kl6M ui ■I II
Recetfon#' 888801
021P07,2017 03:35:29 PM Jean Rlberica
5 of 5 Rao Fea:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
9. All industrial wastes shall be stored in accordance with all State and Federal
laws and regulations.
10. The facility is permitted to operate 7 days per week, 24 hours per day.
11. The Temporary Employee Housing Facility, Major, shall comply will all
standards for this type of facility as outlined in the Land Use and Development
Code, as amended.
Page 5 of 5