Loading...
HomeMy WebLinkAbout1.17 Recorded Land Use Change Permit■[[[ I���!!4'�I��G�L4���sM�F�4��`�ll����l���if� �[ EEl �� Revption€' 8888@I 02107/2017 03:86:29 PM ]ears Rlberico 1 of 5 Rea Fee :$0.Q0 Doc Fee:0.00 GARFIELD COUNTY CO LAND USE CHANGE PERMIT for A Portion of a Parcel of Land Owned by Eva C. Uphoff Trust and Timothy James Uphoff (Operated by WPX Energy) Located North of the Town Of Debeque and in Section 3, Township 7 South, Range 95, West of the 6th P.M., Garfield County with a Project Area of Approximately 1.5 acres Within an Overall 598.78 acre Property (Assessor's Parcel No. 2137-012-0-001) In accordance with and pursuant to provisions of the Garfield County Land Use and Development Code of 2013, as amended, and a Resolution of Approval (Resolution Number 2015-30) of the Board of County Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permit: MAJOR TEMPORARY EMPLOYEE HOUSING FACILITYHOUSING UP TO 24 PERSONS AND ONSITE FOR MORE THAN ONE YEAR, AND A STORAGE FACILITY (LAYDOWN YARD), ON A 1.5 ACRE PORTION OF A 598.78 ACRE PROPERTY (LIPA-8191) This Land Use Change Permit — Limited Impact Review is issued subject to conditions of approval as set forth in Exhibit "B" and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. GARFIELD COUNTY BOARD OF COUNTY COMMIS ON S, GARFIELD COUNTY, COLORADO 6)7• Chair an Date sJAL- ATTEST: 't !"«••.. ••�` a �cazo�° �& ftt-, 141 Cler f the Board Page 1 of 5 mill prig sir&mi wrNW211WHURk liofid 11111 Reception#: 888801 02!0712017 03:35:29 PM ,loan Alberico 2 of 5 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO /y L—Al iw t A (Project Site Plan) S310H TNl91�1913316N3A0� � _ ° �® r`wwrrnnl� �nnxo;umn,I s sHat m mmv irsl.lemon � c w xisirm „nu xm.roa emars� R I f�_ -'yJs. Uy t r s1S ■d� � III'ilsl ! i83E88.�.3E4 S���S� C. l Ii Housing and Storage Facility W Ea r +D 0 I - --• � o GO lLl } 3 0 J I 4 8 J —' Q ro j aaZ� 1 3 -- -- ---- eft U j �augiC, a t Q���� Z: Z ' w f 1k: 0 0 1-- CDtun0n. w0��`9Q zQLu LLI l.l.1 EL n- LULuq� 0 s� II UJ Private C o�Access 001 Road rN6 fits t1s�1¢� Page 2 of 5 mm NIP .11MIP I[ UIj [LAI PFu 11111I.MMIl 11MIA W.16111,1 01111 mill Form simrom wiI iiii17171i1■ im 1 ■1 11-11 1 a immimi =1 ill Recepption#' 888801 02107/2017 03:35:29 PM Jean Alberico 3 of 5 Rec Fee;$0.00 Doc Fee:0.00 GARFIELD COUNTY CO Page 3 of 5 mill PrOMC IC" i �h���i��ilpi� � ��wn ■� ��� Reception#' 888801 02/07!2077 03:35:29 P[1 Jean Albarioo 4 of 5 Rec Fee:$0.00 Doe Fee:0.00 GARFIELD BOUNTY CO Exhibit B Conditions of Approval Conditions Prior to Issuance of Permit 1. The Applicant shall improve the access road as proposed to meet Section 7-107, "Semi -Primitive" standards prior to issuance of the Land Use Change Permit. The Applicant shall provide evidence that the roadway has been upgraded and meets the standards set forth in Section 7-107. This evidence shall be reviewed by the Garfield County Community Development Department and the County Contract Engineer. Other Conditions 2. That all representations made by the Applicant in the application shall be conditions of approval, unless specifically altered by the Board of County Commissioners. 3. That the operation of the WPX Trail Ridge Temporary Employee Housing and Storage Facility shall be done in accordance with all applicable Federal, State, and local regulations governing the operation of this type of facility. 4. The facility shall maintain compliance with Storm Water Management Plan, Drainage and Grading Plans and Reclamation for the site. 5. The Applicant shall control fugitive dust during the operation of the site. 6. The facility shall maintain compliance with Section 7-306 Lighting, with all lighting to be directed inward and doward toward the interior of the site. Facilities and storage tanks shall be painted a non -glare neutral color to lessen any visual impacts. 7. The Applicant shall comply with their Noxious Weed Management Plan including the best management practices. 8. Within 9 months of the issuance of the Trail Ridge Employee Housing Facility Certificate of Occupancy, the Applicant shall install an Onsite Wastewater Treatment System (OWTS) to serve the proposed facility. The installation of the System shall be in accordance with the design and specifications as outlined in the Application. Page 4 of 5 ■Ili NIP MSW AUt Uh VW 6VV?I 1 jW.kl6M ui ■I II Recetfon#' 888801 021P07,2017 03:35:29 PM Jean Rlberica 5 of 5 Rao Fea:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO 9. All industrial wastes shall be stored in accordance with all State and Federal laws and regulations. 10. The facility is permitted to operate 7 days per week, 24 hours per day. 11. The Temporary Employee Housing Facility, Major, shall comply will all standards for this type of facility as outlined in the Land Use and Development Code, as amended. Page 5 of 5