HomeMy WebLinkAboutConditions of PermitPermit Conditions
Grad 12-17- 5054
1. Install BMP's prior to any construction.
2. Reveg disturbed areas within 6 months.
3. Verify seed mixture with Steve Anthony Garfield County Veg. @945-1377
ext. 4305.
4. Control all noxious weeds.
5. Submit State storm water permit certification page once issued by the
state.
6. Provide traffic control signage during hauling operations.
7. See grading plans C1-C6 and submitted information for other requirements.