HomeMy WebLinkAbout1.15 CDOT Access Permit Submittal Acknowledgement12/20/2017
Microgrid Energy Mail - Microgrid Energy - solar access permit at existing location
Jonathan Fitzpatrick <jfitzpatrick@microgridenergy.com>
Microgrid Energy - solar access permit at existing location
Roussin - CDOT, Daniel <daniel.roussin@state.co.us> Wed, Dec 20, 2017 at 9:00 AM
To: Jonathan Fitzpatrick <jfitzpatrick@microgridenergy.com>
Thanks Jonathan. We will process the permit and get back with you soon.
thanks
Dan
Dan Roussin
Permit Unit Manager
Traffic and Safety
P 970.683.6284 1 F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
daniel.roussin@state.co.us 1 www.codot.gov/ 1 www.cotrip.org
On Tue, Dec 19, 2017 at 5:06 PM, Jonathan Fitzpatrick <jfitzpatrick@microgridenergy.com> wrote:
Here is the updated civil plan set including the perpendicular orientation of the driveway. You'll see the note on the
access indicates it will be completed per CDOT standards, and the shape has been modified to be perpendicular to the
highway.
Thanks,
Jon
On Thu, Nov 9, 2017 at 9:33 PM, Jonathan Fitzpatrick <jfitzpatrick@microgridenergy.com> wrote:
Dan,
And the site plan/civil docs are attached. They were too large to send with the other files.
Thanks,
Jon
On Thu, Nov 9, 2017 at 9:26 PM, Jonathan Fitzpatrick <jfitzpatrick@microgridenergy.com> wrote:
Dan,
Hopefully this email comes through. It's about 17 MB so kind of large.
https://mail.google.com/mail/u/0/?ui=2&ik=ba222d4a6d&jsver=emPAL2OLemU.en.&view=pt&msg=16074a7bcc2Obb12&q=daniel.roussin%40state.co.... 1/4
12/20/2017 Microgrid Energy Mail - Microgrid Energy - solar access permit at existing location
The property hasn't been platted, but I think I have all of the other requested documents. If not, just let me know
what I'm missing and I'll get it over to you.
Thanks,
Jon
On Mon, Oct 30, 2017 at 12:03 PM, Roussin - CDOT, Daniel <daniel.roussin@state.co.us> wrote:
You can send it to me by email.
Dan
Dan Roussin
Permit Unit Manager
Traffic and Safety
P 970.683.6284 1 F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
daniel.roussin@state.co.us 1 www.codot.gov/ 1 www.cotrip.org
Peccle System Technology
yoai—to be the best DOT ROAD
On Mon, Oct 30, 2017 at 11:44 AM, Jonathan Fitzpatrick<jfitzpatrick@microgridenergy.com> wrote:
Dan,
Perfect, I'm just waiting for the landowner to return to me the signed application and statement of authority.
Can I submit all of this to you via email or do I have to print/mail the materials?
Thanks,
Jon
On Thu, Oct 26, 2017 at 8:46 AM, Roussin - CDOT, Daniel <daniel.roussin@state.co.us> wrote:
Jon - Here is a checklist on what I will need with the application. It will need to be signed the landowner and
all the things on the checklist. Once we get this, then we will proceed with the access permit.
thanks
Dan
Dan Roussin
Permit Unit Manager
Traffic and Safety
https://mail.google.com/mail/u/0/?ui=2&ik=ba222d4a6d&jsver=emPAL2OLemU.en.&view=pt&msg=16074a7bcc2Obb12&q=daniel.roussin%40state.co.... 2/4
12/20/2017 Microgrid Energy Mail - Microgrid Energy - solar access permit at existing location
P 970.683.6284 1 F 970.683.6290
222 South 6th Street, Room 100, Grand Junction, CO 81501
daniel.roussin@state.co.us 1 www.codot.gov/ 1 www.cotrip.org
Pe 7�e' System Techr1OLQg
y
our fam—to be. the best DOT ROAD
On Tue, Oct 24, 2017 at 12:55 PM, Jonathan Fitzpatrick <jfitzpatrick@microgridenergy.com> wrote:
Mr. Roussin,
We spoke early last month about a solar project I'm working on just west of Silt. I'm going to request
access to the site via an existing residential/agricultural access described in the attached draft application
document. Could you please review it and let me know if I've completed it correctly? The information at
the top of the second page indicates I should check in with you about additional document required with
the submittal, so that's one thing I'm interested in.
The project will take about 6 weeks to build, but once built we only visit the site about 4 times annually.
There is no one stationed on site. During construction we will have a few trucks bringing equipment in
during the first week, but traffic will be limited to local construction crews after site mobilization. I want to
make sure I'm apply for the right type of access with respect to the anticipated uses. I expect the
residential uses will continue to be the primary driver of use on this road.
I'm available via phone if that's easier.
Thanks,
Jon
303-506-7792
1 JONATHAN FITZPATRICK 1 Project Development Manager
jfitzpatrick@microgridenergy.com
M 303.506.7792 1 Linkedln
Microgrid Energy 1 Energy Performance Accelerated
microgridenergy.com
JONATHAN FITZPATRICK 1 Project Development Manager
jfitzpatrick@microgridenergy.com
M 303.506.77921 Linkedln
Microgrid Energy 1 Energy Performance Accelerated
microgridenergy.com
JONATHAN FITZPATRICK 1 Project Development Manager
jfitzpatrick@microgridenergy.com
M 303.506.7792 1 Linkedln
Microgrid Energy 1 Energy Performance Accelerated
microgridenergy.com
https://mail.google.com/mail/u/0/?ui=2&ik=ba222d4a6d&jsver=emPAL2OLemU.en.&view=pt&msg=16074a7bcc2Obb12&q=daniel.roussin%40state.co.... 3/4
12/20/2017 Microgrid Energy Mail - Microgrid Energy - solar access permit at existing location
JONATHAN FITZPATRICK 1 Project Development Manager
jfitzpatrick@microgridenergy.com
M 303.506.7792 1 Linkedln
Microgrid Energy 1 Energy Performance Accelerated
microgridenergy.com
JONATHAN FITZPATRICK 1 Project Development Manager
jfitzpatrick@microgridenergy.com
M 303.506.7792 1 Linkedln
Microgrid Energy 1 Energy Performance Accelerated
microgridenergy.com
https://mail.google.com/mail/u/0/?ui=2&ik=ba222d4a6d&jsver=emPAL2OLemU.en.&view=pt&msg=16074a7bcc2Obb12&q=daniel.roussin%40state.co.... 4/4