HomeMy WebLinkAbout1.19 Confirmation of Xcel Energy Approval12/4/2017 Solar Garden: SRC062867 - SRC Portal
Xcel Energy'
Home Solar Gardens Reports
SRC Custom Links
• Application Process Instructions
• Builders Call Line
• Contact Us
• FAQs
• Glossary
• Privacy Policy
• Sample Documents
• Terms of Use
Welcome, Jonathan Sullivan
Jonathan Sullivan
My Company Profile
My Profile
Channel Manager
SolarRewardsCom munity
Search
1 Search All
Go! 1
Advanced Search.
Solar Garden
SRC062867
•• Back to List: Solar Gardens
Printal
Solar Garden Detail
Information
Garden Name
SRC Producer / Garden
Operator
Primary Application Manager
Developer/Owner
Expected Operational Date
Account Number
Premise Number
Location
Garden Street
Garden City
Garden State
Garden Zip Code
Garden County
PVWatts Location Override
Primary Solar Array
Mount Locationl
Tracker Typel
Array Size 1 (kW)
New Equipment
Additional Solar Arrays
Mount Location2
Tracker Type2
Tilt2
Azimuth2
Array Size 2 (kW)
Yearly Estimated Energy Prod 2
(kWh)
Mount Location3
Tracker Type3
Tilt3
Azimuth3
Array Size 3 (kW)
Yearly Estimated Energy Prod 3
(kWh)
Edit Submit Subscribers I Download Documents I Upload Documents 1 Withdraw
Mesa CSG 3 LLC
Mesa CSG 3 LLC
Jonathan Sullivan
Microorid CSG Portfolio 1 LLC
6/1/2018
31145 US 6
Silt
CO
81652
GARFIELD
Ground
1 -Axis Tracking
1,000.000
Ground
Fixed
Ground
Fixed
System Information
Created By Shawn Queenan, 10/17/2017 6:31 AM
Solar Garden ID SRC062867
STEP 1: INITIAL APPLICATION AND DEPOSIT/ESCROW
Deposit Form Received
Deposit Amount
Escrow Form Received
Escrow Amount
Escrow/Deposit Approval
11/9/2017 1:16 PM
$100,000.00
10/24/2017 1:47 PM
$100,000.00
11/8/2017 7:57 AM
STEP 2: SUBSCRIBER VALIDATION AND PERMIT DOCUMENTATION
Subscribers Submitted
State Certificate Form Received
Contract Received
STEP 3: ENGINEERING REVIEW
Line Diagram Received
Site Plan Received
Interconnection Application
Received
Date Developer Requests
Account/Premise
Date Meters Requested
Interconnection Study Fee
Form Received
Study Fee Received
Sent for Engineering Review
Sent to Engineer(s)
Designer
Interconnection Cost Estimate
Engineering Approval
11/9/2017 1:38 PM
10/20/2017 1:24 PM
10/20/2017 2:26 PM
11/22/2017 12:17 PM
11/22/2017 12:18 PM
11/22/2017 12:18 PM
10/24/2017 11:33 AM
STEP 4: DOCUMENTS & CONTRACT SUBMISSION
Reservation Letter Received
Interconnection Agreement
Received
Invoice Received
Insurance Received
Inspection Received
Low Income Proof Received
Meter Phone Number
STEP 5: APPLICATION COMPLETION
Application Complete
STEP 6: ACTIVE
Garden Expiration Date
Application Activated
Validation Flags
Allocation to Low Income El
Subscriber 0 5%
Solar Garden Allocation
Total kW Allocated
Available Garden kW
18.001
981.999
Status Step 3: Engineering Review
REC Payment per kWh $0.0080000
Application Required 6/30/2018
Completion Date
Total System Cost
Name Plate Capacity (kW DC)
Yearly Estimated Energy
Production (kWh)
Substation Liter
Program Type CO
$1,500,000.00
1,000.000
1,597,810.38
Tiltl
Azimuth1
Yearly Estimated Energy Prod 1
(kWh)
0.00
180.00
1,597,810.38
Mount Location4 Ground
Tracker Type4 Fixed
Tilt4
Azimuth4
Array Size 4 (kW)
Yearly Estimated Energy Prod 4
(kWh)
Mount Location5 Ground
Tracker Type5 Fixed
Tilts
Azimuth5
Array Size 5 (kW)
Yearly Estimated Energy Prod 5
(kWh)
Last Modified By Jonathan Sullivan, 11/22/2017 12:18 PM
Record Type Solar Garden - CO
Deposit Amount Override
Escrow Amount Override
Documents and Contract
Approval
Meter Set Request
Witness Test Procedures
submitted
Low Income Allocations 0.000
Low Income % 0.00
https://na48.salesforce.com/a0Z0B00000KTr8b 1/2