Loading...
HomeMy WebLinkAbout1.19 Confirmation of Xcel Energy Approval12/4/2017 Solar Garden: SRC062867 - SRC Portal Xcel Energy' Home Solar Gardens Reports SRC Custom Links • Application Process Instructions • Builders Call Line • Contact Us • FAQs • Glossary • Privacy Policy • Sample Documents • Terms of Use Welcome, Jonathan Sullivan Jonathan Sullivan My Company Profile My Profile Channel Manager SolarRewardsCom munity Search 1 Search All Go! 1 Advanced Search. Solar Garden SRC062867 •• Back to List: Solar Gardens Printal Solar Garden Detail Information Garden Name SRC Producer / Garden Operator Primary Application Manager Developer/Owner Expected Operational Date Account Number Premise Number Location Garden Street Garden City Garden State Garden Zip Code Garden County PVWatts Location Override Primary Solar Array Mount Locationl Tracker Typel Array Size 1 (kW) New Equipment Additional Solar Arrays Mount Location2 Tracker Type2 Tilt2 Azimuth2 Array Size 2 (kW) Yearly Estimated Energy Prod 2 (kWh) Mount Location3 Tracker Type3 Tilt3 Azimuth3 Array Size 3 (kW) Yearly Estimated Energy Prod 3 (kWh) Edit Submit Subscribers I Download Documents I Upload Documents 1 Withdraw Mesa CSG 3 LLC Mesa CSG 3 LLC Jonathan Sullivan Microorid CSG Portfolio 1 LLC 6/1/2018 31145 US 6 Silt CO 81652 GARFIELD Ground 1 -Axis Tracking 1,000.000 Ground Fixed Ground Fixed System Information Created By Shawn Queenan, 10/17/2017 6:31 AM Solar Garden ID SRC062867 STEP 1: INITIAL APPLICATION AND DEPOSIT/ESCROW Deposit Form Received Deposit Amount Escrow Form Received Escrow Amount Escrow/Deposit Approval 11/9/2017 1:16 PM $100,000.00 10/24/2017 1:47 PM $100,000.00 11/8/2017 7:57 AM STEP 2: SUBSCRIBER VALIDATION AND PERMIT DOCUMENTATION Subscribers Submitted State Certificate Form Received Contract Received STEP 3: ENGINEERING REVIEW Line Diagram Received Site Plan Received Interconnection Application Received Date Developer Requests Account/Premise Date Meters Requested Interconnection Study Fee Form Received Study Fee Received Sent for Engineering Review Sent to Engineer(s) Designer Interconnection Cost Estimate Engineering Approval 11/9/2017 1:38 PM 10/20/2017 1:24 PM 10/20/2017 2:26 PM 11/22/2017 12:17 PM 11/22/2017 12:18 PM 11/22/2017 12:18 PM 10/24/2017 11:33 AM STEP 4: DOCUMENTS & CONTRACT SUBMISSION Reservation Letter Received Interconnection Agreement Received Invoice Received Insurance Received Inspection Received Low Income Proof Received Meter Phone Number STEP 5: APPLICATION COMPLETION Application Complete STEP 6: ACTIVE Garden Expiration Date Application Activated Validation Flags Allocation to Low Income El Subscriber 0 5% Solar Garden Allocation Total kW Allocated Available Garden kW 18.001 981.999 Status Step 3: Engineering Review REC Payment per kWh $0.0080000 Application Required 6/30/2018 Completion Date Total System Cost Name Plate Capacity (kW DC) Yearly Estimated Energy Production (kWh) Substation Liter Program Type CO $1,500,000.00 1,000.000 1,597,810.38 Tiltl Azimuth1 Yearly Estimated Energy Prod 1 (kWh) 0.00 180.00 1,597,810.38 Mount Location4 Ground Tracker Type4 Fixed Tilt4 Azimuth4 Array Size 4 (kW) Yearly Estimated Energy Prod 4 (kWh) Mount Location5 Ground Tracker Type5 Fixed Tilts Azimuth5 Array Size 5 (kW) Yearly Estimated Energy Prod 5 (kWh) Last Modified By Jonathan Sullivan, 11/22/2017 12:18 PM Record Type Solar Garden - CO Deposit Amount Override Escrow Amount Override Documents and Contract Approval Meter Set Request Witness Test Procedures submitted Low Income Allocations 0.000 Low Income % 0.00 https://na48.salesforce.com/a0Z0B00000KTr8b 1/2