HomeMy WebLinkAbout2.0 PermitNO. 119
SPECIAL USF PERMIT
Garfield County, Colo. July _29
19 74•
Applicant: STATE DEPARTMENT OF HIGHWAYS
Address of Applicant: P. 0. Box 2107 - 606 S. 9th St. - Grand Junction, Colo.
Special Use: To extract materials to build roadway from materials pit
designated as the Dalrymple Heavy Riprap Pit.
This Special Use Permit is in compliance with Sections 4.03 and 7.03 of
the Garfield County Zoning Resolution and as per application.
Building Permit No. (if applicable): N/A
This Special Use Permit is hereby granted , (state whether granted
or denied) subject to compliance by applicant with all statements, representa-
tions, provisions and conditions set forth in the application and also subject
to the following conditions:
1. Traffic Control:
Upon passage of the resolution submitted by the Division making
the prima facie speed limit 30 mph (10 and 15 mph advisory signs
to be used) on the county road in ouestion, the Division agrees
to sign and post this road accordingly; the Colorado State Patrol
agrees to patrol this road during the contractor's operations.
The contractor agrees to arrange a meeting prior to beginning
operations involving the truck drivers selected to use this road,
interested people along th road, and the Division of Highways'
personnel to discuss the hazaris that exist along this road.
2. Load Lima ts-
Load limits shall: approx'ma'e ' cubic yards (arorrxicstely 12 ton
net weight). Roc= a 111 be :;lacer, in such a marrer t t ne rock
can fail from truce-- The weight cont -di will be done in the fo`-
lowing manner - the first aid rossib , the seco d truck will be
weighed on certified scales c vi"g the state inspector a 'isual
view of the truck's aoacit- to handle 7 c hic yards. Thee -after,
the state inspector -hall .ont'ro' theamour' of rock to be caded
in each 'ruck.
3. Removal Q;,ant i tj:
The total amount to be rer•ove: from the Dalrymple °asalt Riprap
Pit is 7700 cubic yards. Daus o` actual haul sha11 be 1 mi<tei t+
90 contractor work'ng days. raul wi-1 be 1 mited to Project : 70-1(39).
4, County Road Maintenance:
The Division agrees to require its contractor to repair any damage
through reasonable continued maintenance, caused the county roads
in quest'on. Said roads are to be left in as good condition as
existed prio- to haul.
5. Existing Gate Maintenance:
The Division shall require its contractor to maintain existing
gates on County Secondary Road 325 as necessari during the haul
to protect livestock_
6. Dust Pollution Control:
The Division agrees to use Emulsified Asphalt as a dust palliative
in residential areas as needed.
7. Irrigation and Utility Protection:
The Division agrees to adequately protect and/or replace any irri-
gation structure subject to damage during the contractor's hauling
operations. The Division also agrees to examine all irrigation
structures Prior to beginning operations in anticipation of replacing
and/or repairing before operations begin in lieu of avoiding inter-
rupted irrigation flow.
8. Traffic Respect:
The contractor will be required to respect the rights of citizens
using the county roads with regard to the movement of livestock
and farm machinery. The contractor will not be permitted to haul
when the county road is being used by the school bus.
9. Use Restrictions:
Haul will be permitted during daylight hours only.
STATE REASON OR REASONS FOR DENIAL ERIOW:
N/A
The concurring is a vote of the majority of the Board of County Commissioners.
Dated this 29th day of July , A. D. 1974 .
Chairman - Board of County Commissioners
Garfield County, Colorado