Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-01-18-5073 Whitney & Michael Scurlock New SF Residence Springridge Reserve — Phase 4, Lot 75 TBD Hidden Valley Drive Glenwood Springs, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.) 2) IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES REDLINED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 3000 PSF. 4) INSTALLATION OF A RESIDENTIAL FIRE -SPRINKLER SYSTEM IS REQUIRED, AND SYSTEM SHALL BE DESIGNED TO COMPLY WITH N.F.P.A. 13D OR I.R.C., SECTION 2904. VERIFY ALL FIRE SPRINKLER SYSTEM REQUIREMENTS AND COORDINATE INSPECTIONS WITH LOCAL FIRE DISTRICT. PROVIDE EVIDENCE OF ROUGH -IN APPROVAL AT FRAMING INSPECTION, AND FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 5) SEPARATE LOCK -OFF OR ACCESSORY DWELLING UNIT AT LOWER LEVEL IS SPECIFICALLY NOT AN APPROVED USE UNDER THIS BUILDING PERMIT, AND ANY SUCH USE WILL FIRST REQUIRE A LAND -USE CHANGE PERMIT UNDER PROVISIONS OF GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE. 6) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.