HomeMy WebLinkAboutEngineer Report 01.12.17oddo
engineeringJob:
Project No.
Date:
Location:
Present:
ODDO ENGINEERING,INC.
FIELD REPORT #1
Posluszny Residence, 0412 Sun King Dr
Glenwood Springs, Colorado
1600-25
December 21, 201ó (January 12, 2017)
Job site
Mike Gueriera mike@dmneuman.com
Robert Oddo, Oddo Engineering
Field Observation Notes:
1. The as built entry pre-manufacture truss layout is acceptable with one less truss from the
shop drawings.
2. Provide 2 x 6 minimum blocking in between roof trusses along the north bearing wall
3. It appears that the 9 t/2" TJI floor joist were installed per the construction documents
hanging from (3) 14" ML with Simpson IUS face mount hangers. Acceptable.
4. From our general observation it appears.th¿ll the wood lì'aming has been installed per lhe
construction documents and meets the design intent; acceptable'
Þ t
òr
?13 Cooper Avenue I Suite 200 t Glenwood Springs, CO 81601
(970) 945-1006 o Fax (970)945-2966 o E-Mail bob@oddogws.com