Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-02-18-5095 Grace Bible Church New Classrooms (Manufactured Building) 755 Spencer Parkway - Parachute, Colorado 1) FACTORY-BUtLT STRUCTURES ARE REGULATED & INSPECTED BY COLORADO DEPT. OF HOUSING (c.D.o.H.) AND ALL FACTORY-BUtLT STRUCTURES tN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. FINAL APPROVED C.D.O.H. INSTALLATION INSIGNIA SHALL BE AFFIXED PRIOR TO GARFIELD COUNW,S FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 2) FOUNDATTON, CRAWL SPACE, BUtLDtNG EGRESS AND RELATED SITE WORK SHALL COMPLY WITH 2015 TNTERNATTONAL BUtLDtNG CODE (t.B.C.), 2009 INTERNATIONAL ENERGY CONSERVATION coDE ( t. E.c.c.) AN D MAN UFACTU RER',S I NSTALLATION REQU IREM ENTS. 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY',S COMMERCIAL BUILDING REQUIRE- MENTS, DESCRIPTION OF PLAN REVIEW COMMENTS & INSPECTIONS POLICIES. 4) ALL WORK SHALL COMply W|TH BATTLEMENT MESA PUD'S'PUBLIC, SEMI-PUBLIC AND RECREATIONAL" (P.S.R.) ZON E DISTRICT REG U LATIONS. 5) FACTORY-BUtLT STRUCTURE tS APPROVED AS NON-SPRINKLERED, WPE V-B CONSTRUCTION wtrH occuPANcY GROUP "A-3" (ASSEMBLY) USE. 6) AppLtcANT SHALL CONTACT LOCAL FtRE DISTRTCT FOR FIRE CODE REQUIREMENTS INCLUDING FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL LETTER FROM FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION AND CERTI FICATE OF OCCU PANCY. 7l vERtFy coMpLtANcE wtTH EGRESS REQUIREMENTS PER 20L5 LB.C., CHAPTER 10 AS FOLLOWS: A. ACCESSIBLE MEANS OF EGRESS - SECTION 1.009 B. DOOR HARDWARE, LOCKS, LATCHES & LANDINGS AT DOORS - SECTION 1010. c. Exlrs -sEcÏoNS 7022, 1024, tO27, 1028 D. VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH-IN INSPECTION 8) ACCESSIBILTY REQUIREMENTS PER 2015 l.B.C., CHAPTER L1 INCLUDING: A. ACCESSIBLE ROUTE _ SECTION 1104 B. ACCESSIBLE ENTRANCES _ SECTION 11.05 C. PARKING & PASSENGER LOADING - SECTION 1106 D. SIGNAGE FOR PARKING SPACES & PUBLIC RESTROOMS _ SECTION 1-111 9) LtGHT, VENTTLATION & TEMPERATURE CONTROLS PER 201"5 lBC, CHAPTER 12. 10) TOTLET & BATHROOM REQUIREMENTS PER 2015 l.B.C., SECTION 1210. NOTE: SINCE THIS NEW BUILDING IS ACCESSORY TO EXISTING CHURCH, THE EXISTING PUBLIC RESTROOMS AT CHURCH MAY BE USED TO FULFILL PUBLIC RESTROOM REQUIREMENTS FOR NEW CLASSROOMS. VERIFY COMPLIANCE OF EXISTING RESTROOMS WITH ACCESSIBILITY REQUIREMENTS PER I.B'C, CHAPTER 11. 11) ELECTRTCAL REQUTREMENTS, pERM|TTING & INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL BUILDING INSPECTION AND CERTI FICATE OF OCCU PANCY.