HomeMy WebLinkAboutPlansConference Room Renovation Scale: i /L' = i -u ELECTRIC4 PErMTTING & INSPECTIONS ARE BY THE COLORADO STATE ELECTRICAL BOARD ELECTRICAL FINAL APPROVAL IS REQUIRED AT COIFINAL INSPECTION ;Main Level Plan scale: 1/4" _ I' -U' Renovation Notes: ORemove existing door and frame assembly 0 Provide wood stud infill wall at door opening, gypsum board both sides, match wall plane; texture and paint to match existing 3O Install new solid wood door and frame as indicated on plans. Size to match adjacent finished door; frame similar to existing; provide office lockset and key to match existing. Remove existing carpet and/or pad. 5O Install new high traffic closed loop carpet/pad. Color to be selected by owner. Finish wall and ceiling where existing wall has been removed; textured to match adjacent. 0 All interior walls, window sill, casing, and ceiling, after preparation, shall receive one coat of primer and two coats of latex -based low VOC paint. Colors to be selected by owner. Remove existing vinyl base. 0 Install new vinyl base. 10. Cut opening in existing wall and provide trim board, jack studs and double 2x10 structural header as rough framing for new door. <1 1,> Communications wiring to be installed by United Companies APPROVED SUBJECT TO NOTED EXCEPTIONS & iNSPECTIONS Gt.RFI:E'_D COUNTY BUILD i E , DEPARTMENT DATE 11145111 EiY WAP FIELD COPY NO INSPECTION WITHOUT THESE PLANS ON SITE Page Of Jeff Johnson G° rc h t cturrd PCS 136 East Third Street Rifle, CO 81650 970-625-0580 parch@rof.net Copyright 2017 COL A, $G0 W 09-13-17 LL 20M M UP C 'a. CL L rki I Construction Building Renovation Plan 1 I Date: 09-05-17 11 1708A ARI �O CCZ Rim U UP C 'a. CL L rki I Construction Building Renovation Plan 1 I Date: 09-05-17 11 1708A ARI