HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-03-18-5130
Alan & Kathleen Rand
Detached Pole Barn & Garage
L2L5 N. Cedar Ranch Road, Rifle
Cedar Springs Ranch - Lot 2
A. WORK TO COMPLY WITH 201.5 I.B.C. ,2OL5I.R.C., 2OO9 I.E.C.C., AND MANUFACTURER,S
I NSTALLATION SPECI FICATIONS.
B. IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED
'GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED ITEMS NOTED ON PLANS
REFERENCE SPECIFIC ITEMS ON THIS LIST.
C. STRUCTURE IS APPROVED AS A DETACHED RESIDENTIAL ACCESSORY BUILDING, TYPE V-B
NON-SPRI N KLERED CONSTRUCTION, OCCU PANCY G ROU P U (UTl LITY).
D. WORK SHALL COMPLY WITH ,,RURAL" ZONE DISTRICT REGULATIONS PER GARF]ELD
COUNTY,S LAND USE & DEVELOPMENT CODE. ANY CHANGE IN USE/OCCUPANCY OF
THIS STRUCTURE MAY REQUIRE A LAND USE CHANGE PERMIT OR AMENDED BUILDING
PERMTT(S).
E. OPEN-HOLE SOILS REPORT MAY BE REQUIRED AT FOOTING INSPECTION TO VERIFY
1,500 PSF SOIL BEARING CAPACITY PER MANUFACTURER,S REQUIREMENTS, AND THIS
REQUTREMENT (tF AppLtcABLE) rS LEFT TO BUILDING INSPECTOR'S DISCRETION.
F. IF BUILDING IS TO BE HEATED - NOW OR IN THE FUTURE - INSULATION AT THERMAL
ENVELOPE SHALL MEET 2OO9 I.E.C.C. MINIMUM REQUIREMENTS (SEE ITEM #25). ALSO
REFERENCE ITEMS #59,62,63,64,65 AND 71 FOR MECHANICAL & HEATING SYSTEM
REQUIREMENTS.
G. ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL REQUIRED AT FRAME INSPECTION, AND ELECTRICAL
FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE
OF OCCUPANCY.