Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-03-18-5130 Alan & Kathleen Rand Detached Pole Barn & Garage L2L5 N. Cedar Ranch Road, Rifle Cedar Springs Ranch - Lot 2 A. WORK TO COMPLY WITH 201.5 I.B.C. ,2OL5I.R.C., 2OO9 I.E.C.C., AND MANUFACTURER,S I NSTALLATION SPECI FICATIONS. B. IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED 'GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED ITEMS NOTED ON PLANS REFERENCE SPECIFIC ITEMS ON THIS LIST. C. STRUCTURE IS APPROVED AS A DETACHED RESIDENTIAL ACCESSORY BUILDING, TYPE V-B NON-SPRI N KLERED CONSTRUCTION, OCCU PANCY G ROU P U (UTl LITY). D. WORK SHALL COMPLY WITH ,,RURAL" ZONE DISTRICT REGULATIONS PER GARF]ELD COUNTY,S LAND USE & DEVELOPMENT CODE. ANY CHANGE IN USE/OCCUPANCY OF THIS STRUCTURE MAY REQUIRE A LAND USE CHANGE PERMIT OR AMENDED BUILDING PERMTT(S). E. OPEN-HOLE SOILS REPORT MAY BE REQUIRED AT FOOTING INSPECTION TO VERIFY 1,500 PSF SOIL BEARING CAPACITY PER MANUFACTURER,S REQUIREMENTS, AND THIS REQUTREMENT (tF AppLtcABLE) rS LEFT TO BUILDING INSPECTOR'S DISCRETION. F. IF BUILDING IS TO BE HEATED - NOW OR IN THE FUTURE - INSULATION AT THERMAL ENVELOPE SHALL MEET 2OO9 I.E.C.C. MINIMUM REQUIREMENTS (SEE ITEM #25). ALSO REFERENCE ITEMS #59,62,63,64,65 AND 71 FOR MECHANICAL & HEATING SYSTEM REQUIREMENTS. G. ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL REQUIRED AT FRAME INSPECTION, AND ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.