HomeMy WebLinkAbout06.0 Section 5 Impact and TrafficSECTION 5
Impact and Traffic
Impact Analysis 4-203G
Traffic Study 4-203L
Road Waiver
February 26, 2018
David Rasmussen
826 Suite C Hwy 133
Carbondale, CO 81623
Re: Response for Duplex Proposal, Road Waiver for Mountain Shadows Subdivision and Existing
Mountain Shadow Drive Road
SE Job #17076.01
Dear David,
Following Policy 01-14, Sopris Engineering reviewed the Roadway Standards for the proposed internal
road, for Mountain Shadows Subdivision with our Road Wavier on May 17th, 2017. The proposed
subdivision will now have a final build out of three duplexes.
Our pervious letter, for a road wavier used the Institute of Transportation Engineers, (ITE), Trip
Generation 7th Edition states to state that single family home has an Average Daily trip of 9.57 per unit.
Under the ITE standard ADT's for duplexes is 5.86 per unit. The total number of units for the proposed
subdivision is 6, resulting in 36 ADTs. The increase of 7 Average Daily Trips leaves the internal road in the
Semi Primitive category of Table 7-107: Roadway Standards. The resulting increase in ADT's will not
increase the Roadway standards, thus we request that the Road waiver be modified to reflect the
building of Duplexes instead of single family homes.
Under the previous Road Wavier approved by the county the existing road currently has 154 ADTs, and
an additional 20 ADT's, putting Mountain Shadows Drive into the Rural Access, design standards
category of Table 7-107 of the Garfield County Land Use Code, Article 6. The proposed duplexes will
only increase the ADT's on the external road from 174 to 181 ADT's. This results in the road staying in
the Rural Access Road Category, under Table 7-107. As previously stated in our Road Wavier from May
17th, currently the roadway meets all the designs standards of the county, but the minimum Right -of -
Way width. The existing road is platted with a Right of Way of 30'. This has functioned for many years as
is and has been adequate for the usage and safety of the roadway. Since the proposed subdivision is not
increasing the usage in the next category, being a Secondary Access, we request the county approve the
Road Waiver for the building of Duplexes instead of Single Family Homes.
If you have any questions or need additional information, please call.
Sincerely,
SOPRIS ENGINEERING, LLC
6' 46`s • • • '
�ONAL t 4
er
h`�
Yancy NiailitoPeNinciple
502 Main Street • Suite A3 • Carbondale, CO 81623 • (970) 704-0311 • Fax (970) 704-0313
SOPRIS ENGINEERING • LLC
civil consultants
ARTICLE 4-203G 1-8
G. Impact Analysis.
Where the proposed development will impact specific features of the site, the Applicant shall describe both
the existing conditions and the potential changes created by the project. The Impact Analysis shall include a
complete description of how the Applicant will ensure that impacts will be mitigated and standards will be
satisfied. The following information shall be included in the Impact Analysis:
1. Adjacent Land Use. Existing use of adjacent property and neighboring properties within 1,500 -foot
radius.
a. Land use to the North: one single-family residence on the north side of Mountain Shadows
Drive before it turns into empty mountainside.
b. Land use to the West: High density single family residential cluster homes in Chalet Village,
medium density single family residences along Creekside Ct, agricultural lands along Mitchell
Creek and more mountain side.
c. Land use to the South: Directly on the southern property line is a multi -unit property and a
single family residence. Off of Donegan Rd there are many multi -unit properties and single
family residences. Just to the south of that is a combination of a school, commercial properties
such as car dealerships and the mall, mobile home park and government buildings.
d. Land use to the East: High to medium density single family homes on lots ranging in size
from 0.20-1.0 acres mostly contained in the Western Hills Subdivision. There is also an empty
commercial lot that look like a field.
e. It should be noted that do to the terrain and vegetation along property lines there is a limited
view of the development itself.
2. Site Features. A description of site features such as streams, areas subject to flooding, lakes, high
ground water areas, topography, vegetative cover, climatology, and other features that may aid in the
evaluation of the proposed development.
a. All three lots and buildings will be on a slope of varying degrees with the uphill unit having one
floor with a crawlspace below and the downhill unit having a basement below.
b. All three lots are south facing with a mix of sun and shade in summer and winter.
c. There is very little vegetative cover aside from grass throughout most of all three lots and
some trees of mostly smaller trunk size along the western and southern property lines.
d. It is not in a flood nor slide zone.
e. Reynolds and Cain Ditch Company has a ditch running along the southern property line. Any
building will remain outside of this easement.
3. Soil Characteristics. A description of soil characteristics of the site that have a significant influence on
the proposed use of the land.
a. There is no significant soil characteristics. See Section 3 for Grading and Soil details.
4. Geology and Hazard. A description of the geologic characteristics of the area including any potential
natural or manmade hazards, and a determination of what effect such factors would have on the
proposed use of the land.
a. There is no significant soil characteristics. See Section 3 for Grading and Soil details.
5. Groundwater and Aquifer Recharge Areas. Evaluation of the relationship of the subject parcel to
Floodplains, the nature of soils and sub -soils and their ability to adequately support waste disposal,
the Slope of the land, the effect of sewage effluents, and the pollution of surface Runoff, stream flow,
and groundwater.
a. All units on all three lots will connect with the city sewer system
b. Two water retention areas are at the southern part of the property before the ditch to help curb
runoff.
6. Environmental Impacts. Determination of the existing environmental conditions on the parcel to be
developed and the effects of development on those conditions, including:
a. Determination of the long-term and short-term effect on flora and fauna;
i. With the planning of draught resistant and native plants (where possible) the flora of the lots
will be improved.
ii. With the development of the lots there is no effect on fauna since the use of the property is
ARTICLE 4-203G 1-8
not being changed dramatically from its current state nor impacting the state of neighboring
properties.
iii. Plants installed will follow city bear guidelines.
b. Determination of the effect on designated environmental resources, including critical wildlife
habitat;
i. There is no impact on environmental resources nor effect on wildlife as it is not in a critical
habitat.
c. Impacts on wildlife and domestic animals through creation of hazardous attractions, alteration
of existing native vegetation, blockade of migration routes, use patterns, or other disruptions;
and
i. There is no impact on wildlife nor domestic animals.
d. Evaluation of any potential radiation hazard that may have been identified by the State or
County Health Departments.
i. No radiation has been identified by the State nor County Health Department.
7. Nuisance. Impacts on adjacent land from generation of vapor, dust, smoke, noise, glare or vibration,
or other emanations.
a. None of the above will be generated as the internal road (driveway) will eventually be paved.
b. The slope of the lots help with creating a natural privacy and lower profile of any development.
8. Hours of Operation. The Applicant shall submit information on the hours operation of the proposed
use.
a. To be consistent with residential uses.
Article 4-203L — Traffic Analysis
Assessment of Traffic Impacts.
We do not expect construction of the duplexes in this application to significantly impact
local traffic. The proposed size of the duplexes is comparable to single family
residences and we do not anticipate construction traffic to be greater than the amount of
construction traffic that would be generated by single-family residences. There is ample
room on the site for storage and parking. It should also be considered the subdivision
(site or property) where work will be done is at the end of a dead end street where very
little existing traffic occurs.
1. Study/Analysis
a. If the Director determines that any 1 of the following thresholds is
exceeded:
i. Traffic volumes projected at any intersection when a State or
Federal highway exceeds current volumes by 20%, as determined
by CDOT using current traffic counts and CDOT-approved
methodology;
1. Answer: Not affected
ii. Traffic volumes projected on any County road segment exceed
current volumes by 20%;
1. Answer: Not affected
iii. Traffic volumes on any road segment identified or contained within
an approved municipal street plan within a 1 -mile radius exceed
current volumes by 30%.
1. Answer: Not affected
2. Basic Traffic Analysis. The Basic Traffic Analysis shall include the following
information:
a. A map or maps depicting the parcel or activity area and showing the
Article 4-203L — Traffic Analysis
following information:
i. (1) Existing and proposed internal roads, adjoining roads, access
points, and access points for the finished development;
1. Answer: See Site Plans Section 2
ii. (2) All County roads within a 1 -mile radius of the development;
1. Answer: CR 136, CR 135, CR 132, CR 130
iii. (3) The nearest proximate intersections with State or Federal
highways likely to receive traffic impacts from the development;
and
1. Answer: Interstate 70 and State Highway 6 (and 24) is
within one mile and will not be affected by the increase
created by changing the MSP subdivision lots from
SFR to Multi -Family.
iv. (4) Activity areas for construction activity.
1. Answer: All construction will take place on MSP. Any
disruption to the access easement will be part of the
building permits.
b. A narrative description of existing land uses on the parcel,
including the following information:
i. Answer: There is no current use of the land.
ii. (1) Current Trip Generation estimates at existing access points;
1. Answer: There is one access point. During the busiest
time of development there will be roughly 6 trips a day.
Article 4-203L — Traffic Analysis
iii. (2) County driveway permits for the access points and status;
1. Answer: Not applicable; access and parking are
supplied by the internal road created and approved
with the subdivision.
iv. (3) Permit requirements for access to a State highway,
railroad crossings, and status;
1. Answer: None required
v. (4) All access easements and information regarding the legal
status of these easements; and
1. Answer: See Section 7 regarding Legal Access
vi. (5) Other appropriate current traffic information and legal
constraints that may apply.
1. Answer: Not applicable
c. A description of the construction of the development, including the
following:
i. (1) Staging and storage areas;
Answer: Storage and staging will be on site.
ii. (2) Temporary access points;
Answer: Access will be at the existing access point off of
the ROW access easement off of Mountain Shadows Drive.
iii. (3) Duration, types, and frequency of heavy truck traffic;
Answer: 1-2 trucks a day for one month during the site
improvements and foundation stage.
Article 4-203L — Traffic Analysis
iv. (4) Access road segments to be impacted; Answer: The
access road will not impacted as the transport of the
buildings will be quick, with proper support vehicles, permits
and following CDOT regulations.
v. (5) Projected lane closures or traffic interruption, and a statement
of mitigation measures that will be applied to minimize disruption
and damage; and
1. Answer: Only impact will be to the access easement
when it goes down to one lane for 4 days while the
utilities are trenched under the road.
2. Answer: Contractor will facilitate the flow of local
traffic during trenching.
vi. (6) All County or State permits that will be required. Answer: To
be submitted with the building permits
3. Detailed Traffic Analysis. In addition to the information provided in the Basic
Traffic Analysis, the following information shall be provided in a Detailed Traffic
Analysis. The Detailed Traffic Analysis must show the highest probable volumes
from the proposed uses and densities to be allowed at build -out. The Detailed
Traffic Analysis shall include an analysis of the existing and proposed levels of
service and shall address adequacy of capacity for the proposed use, and any
additional information available and applicable to County roads.
a. Access points to and from the development shall be analyzed for AM and
PM peak hour use for turning movements to determine the necessity for
traffic control and signalization, geometrics including turning lanes and
acceleration and deceleration lanes, and signage.
i. Answer: The subdivision is off of an access easement at the
end of a dead end street. Proper traffic control with flaggers
and signage will be in place during required times such as
lane closure (if necessary).
Article 4-203L — Traffic Analysis
b. County Road segments where traffic is expected to increase by over 20%
shall be characterized in detail by current level of service, roadway
condition and type, lane width, shoulder characteristics and condition,
available right-of-way, speed limits, any weight limits, existing safety
concerns and considerations, likely increases in maintenance
requirements, and status for improvement in the County capital
improvements plan. Probable maintenance and improvement cost
estimates shall be provided.
i. Answer: Traffic is not expected to increase by over 20%
c. County road intersections where traffic is expected to increase by over
20% shall be characterized by existing traffic control and signalization,
AM and PM peak hour utilization with turning movements, projections for
levels of service, and recommended modifications for intersection
geometrics, including turning lanes, control or signalization devices,
acceleration or deceleration lanes, and advance signage where
appropriate. Probable cost estimates shall be provided.
i. Answer: Traffic is not expected to increase by over 20%
d. State or Federal highway intersections where traffic is expected to
increase by over 20% shall be characterized by existing traffic control and
signalization, AM and PM peak hour utilization with turning movements,
through movements as applicable, projections for levels of service, and
recommended modifications for intersection geometrics, including turning
lanes, control or signalization devices, acceleration or deceleration lanes,
and advance signage. Consultation with the Colorado Department of
Transportation is required and shall be documented. Probable cost
estimates shall be provided.
i. Answer: Traffic is not expected to increase by over 20%
4. Calculation of On -Site and Off -Site Improvements and Fees.
a.
Answer: See SIA in Section 4
Article 4-203L — Traffic Analysis
5. Additional Submittal Requirements and Documentation.
a. Existing County permits, including driveway permits and access
permits;
i. Answer: Permits to be pulled with building permits
b. Existing
access easements;
i. Answer: See Site Plans and/or Plat in Section 2
c. Existing permits from CDOT, railroads, or other applicable entities;
i. Answer: Not applicable
d. Evidence of consultation with the County for future access locations;
i. Answer: Not applicable but should be noted the County
already approved the subdivision and proposed improvement
including the road and pertinent road waivers.
e. Evidence of consultation with CDOT for future access permits, as
applicable;
i. Answer: Not applicable
f. Any proposed access easements, agreements, and modifications and
current status; and
i. Answer: See Site Plans in Section 2
g. Any proposed noise barrier or sound wall improvements.
i. Answer: Not applicable
County Standards for Roads Vs. Existing and Proposed Roads
ADT = 5.86 per unit for duplexes*
ADT = 9.57 per residence*
15 homes in challet village (143.55 ADT) + Starr Residence (9.57) + 6 proposed units in
Mountain Shadow Place subdivision (35.16 ADT) = 188.28 ADTs
* ITE standard ADT
181.83 ADTs with subdivison SFR
188.28 ADTs with subdivision 6 Units
6.45 ADT = the increase by approving the duplexes. The increase is less than
one SFR. This increase is less than 20%
County - Rural
Access Road
Access Easement
County - Semi
Primitive Road
Proposed Internal
Roadway
ADT
101-200
172.26
21-100
25.16 (6 Units)
Min ROW Width
50'
30'
40'
40'
Lane Width
11'
11'
10'
8'
Shoulder Width
4'
0
2'
2
Ditch Width
6'
n/a
4'
n/a
Cross Slope
3%
n/a
3%
2-3%
Shoulder Slope
5%
n/a
5%
2-5%
Minumum Radius
80'
0
50'
25'
Max Grade
12%
5%
12%
10%
Surface
Gravel
Gravel
Gravel
Gravel
* ITE standard ADT
181.83 ADTs with subdivison SFR
188.28 ADTs with subdivision 6 Units
6.45 ADT = the increase by approving the duplexes. The increase is less than