Loading...
HomeMy WebLinkAboutCorrespondenceDave Arqo From: Sent: To: Cc: Subject: Dave Argo Friday, November 03,2017 10:12 AM 'cpearl@vnrenergy.com'; Stephen Kesler (westar@ rof.net) Brooke Winschell; Lindsay Krol Steel Warehouse/Storage Building - Permit #BLCO-10-1-7 -4978 Chase: We have reviewed plans submitted for Vanguard's steel warehouse/storage building, but before we can finalize our review & issue a building permit we need to receive additional information and/or verification about the following items: a. Soils Report - Please submit a copy of the soils report from CTL Thompson as referenced on the foundation drawings. b. Pre-Fab Steel Building Plans - We need clarification from General Steel's Engineer regarding the following items: o Reference Building Code - Drawings call out 2OL2l.B.C. as reference code, but Garfield County adopted the 2015 l.B.C. in July 2016. We require Engineer's verification that this structure meets all requirements of the 2015 l.B.C. o Snow Load Requirements - Specifications call out 40 PSF snow load but this value is specified on plans as both Ground Snow Load (Pg) as well as Roof Snow Load (Pf) - values which are actually different. We require verification Engineer's verification that this structure meets our local requirements of 40 PSF as measured at roof. c. Driveway Permit - Please submit paperwork verifying that you have properly secured a driveway permit from Garfield County's Road & Bridge Dept. d. Statement of Authority - Since you aren't the legal property owner, we need to receive a Statement of Authority from Vanguard Operating LLC that you are acting as their officially sanctioned representative in this matter. lf you should have any quest¡ons about either of these final two items, please contact either Brooke or Lindsay at our office as they have also been copied on this email. We will place this project in our "pending approvals" file while awaiting your response to these questions. Thank you for your assistance - Dave Argo Plans Examiner Garficld County Community Development Department 108 8th Street, Suite 407 Glenwood Springs, CO 81601 Tel: 970-945-8272 Ext. 7610 Emo il : d a rg o @ go rfi eld-county.com We b : g a rf i e I d -co u n ty. co m CONflDENTIAUTr NOTTCE: This emoil communicotion ond any files transmitted olong with it are intended only for the person or ent¡ty to wh¡ch ¡t ¡s oddressed. tf you have received this emoil in error, pleose immediately not¡ly the sender by email ond delete it from your files. 1 Dave Argo From: Sent: lo: Cc: Subject: Dave Argo Friday, November 03,20L7 L2:2L PM 'cpearl@vnrenergy.com' Patrick Waller; Lindsay Krol FW: Steel Warehouse/Storage Building - Permit #BLCO-L0-17-4978 Chase: It was also pointed out to me by Lindsay Krolthat this project also requires a minor modification of the current Land Use Change permit before we can issue a building permit. I have copied both Lindsay and Patrick Waller, one of our staff planners who I believe you have previously spoken with about this matter. ln addition to resolving the building permit issues I sent to you earlier today, we also require your follow-up on this minor modification of the LUCP with our planning department. Please contact Pat at your earliest convenience to initiate this process. Thank you - Dave Argo Plans Examiner Garfield County Community Development Department 708 gth Street, Suite 401. Glenwood Springs, CO 81601 Tel: 970-945-8272 Ext. 1610 Emo il : d o rgo@ go rfield-cou nty.com Web : ga rfie ld-cou nty,com CONFiDENTIAL]T. NOTICE: This emoi! commun¡cotion ond ony fites transm¡tted olong with it are ¡ntended only for the person or ent¡ty to which it is addressed. tf you hove received this emoil in error, please immediotely notify the sender by emoil ønd delete it from your files. From: Dave Argo Sent: Friday, November 03,2OL710:12 AM To:,cpearl@vnrenergy.com'<cpearl@vnrenergy.com>; Stephen Kesler (westar@rof.net)<westar@rof'net> Cc: Brooke Winschellcbwinschell@garfield-county.com>; Lindsay Krol<lkrol@garfield-county.com> subject:.stee I wa rehouse/storage Bu ild i ng - Permit #BLco-10-17 -497 8 Chase We have reviewed plans submitted for Vanguard's steel warehouse/storage building, but before we can finalize our review & issue a building permit we need to receive additional information and/or verification about the following items: a. Soils Report - please submit a copy of the soils report from CTL Thompson as referenced on the foundation drawings. b. pre-Fab Steel Building plans - We need clarification from General Steel's Engineer regarding the following items: Dave Argo Sent: To: Cc: From: Attachments: Chase Pearl <cpearl@vnrenergy.com> Friday, December 0t,2OI7 L2:13 PM Dave Argo Patrick Waller; Glenn Hartmann RE: Steel Warehouse/Storage Building - Permit #BLCO-10-l-7-4978 georeporI_GSO6169.OO0 1-25 R]-.pdf; epperly-building permit app-signed by scott- 20L7L20I.pdf Subject: Dave, Pleasg see attached: vÁl Soils Report - geo report attached ,,161 pre-Fab Steel Building Plans - waiting for a letter of clarification from the building manufacture tÁ Driveway permit - it was determined one was not needed ,A Statemeni of authority - permit application signed by the President of Vanguard I will get the letter of clarification from the building manufacture to you as soon as I get it, but wanted to get you the others first. I am working with Glenn Hartman on the amendment to the LUCP Let me know if you have questions. Thanks Chase From : Dave Argo [ma ilto :daroo@ga dield -cou ntv. com] Sent: Friday, November 03,20L7 L2:2L PM To: Chase Pearl Cc: Patrick Waller; LindsaY Krol su bject: FW : steel wa rehouse/storage Bu ild ing - Permit # BLco- 10- 1 7 -497 8 FXTFRNAL - This is an EXTERNAL ernail Exercise caution. DO NOT open attachments or clicl< links from unl<nowrl sencJers or unexpected email Dave Argo From: Sent: To: Orrin Moon < Orrin.Moon@Crfr.us> Friday, April 20, 2018 L2:57 PM Chase Pearl; Dave Argo RE: Metal Building plan reviewSubject: Chase/ Dave, I have reviewed your plans for the building at the end of 6 Lazy K Road in Silt and have no problems with the site plan and or the building being built. I will request the following for the C of O for the building when finished: t. The building shall have and address assigned by Garfield County and posted on the driveway accessing to the buílding along with the address on the building' Z. Fire extinguishers are required installed, mounted and readily accessible inside the building. The extinguishers shall be accessible within 75' from any location inside of the building. 3. lf any Flammable/Combustible liquids and or any Hazardous Materials are stored in the building then a NFPA 704 placard shall be installed on the entrance of the building matching the hazard. 4. Final inspection of site and building required for fire department sign-off for C of O. Please feel free to contact me with any questions or concerns you might have TTI&IÙKYCIU, CIRß.IIìf D. I\'IOON PR.EVENTTON DIVTS,ION CÌIIETITIßE MÅßSHAL EOLOS,qDO. RTVEB f"I8E RESCUE 970-625-1Z¿bz orrin.moon@crfr.us trúEryrrfrcr. t0t0H,$t HïEa. ¿ tr. # {S '.8ST ?lllt , {.. Íru.ffir '\[' /il frü From : Chase Pearl [mailto : cpearl@vn renergy.com] Sent: Thursday, April 05, 2018 7:30 AM To: Orrin Moon Subject: Metal Building plan review Orrin, Please see the attached site and building plans along with the email from the county. Thanks Chase Pearl Construction Foreman Vanguard Operating, LLC 720.402.7s42 2 Dave Argo From: Sent: To: Cc: Subiect: Attachments: Dave Argo Monday, March 26,2018 2:27 PM 'Chase Pearl' Glenn Hartmann RE: Bldg. Permit #BLCO-L0-17-4978 Circle B Land Co..pdf Chase: This morning I spoke to Glenn Hartmannn, who forwarded the Minor Modification paperwork along to me for my review. After reviewing this paperwork, there are 2 things that still need to be done before we can issue a Building Permit: (L) tocal Fire District Review - Can you please have the local fire district send me an email verification that they have reviewed the new building plans? This item is identified as compliance item (d) in the Director's Decision (see attachment). (2) Updated Site Plan with Building Footprint - Unfortunately, we don't have a clear copy of the updated building envelope and new building footprint shown. Can you please send me a partial site plan with this new information? Since we already have a large-sized site plan, you can simply send a smaller size PDF if to the same scale as the original drawing. Once we have these 2 items completed, we can issue the Building Permit. Thanks for your assistance Dave Argo Plans Examiner Gurfitld Ctruut1, Community Development Department 108 8th Street, Suite 407 Glenwood Springs, CO 81601 Tel : 970-945-8272 Ext. 1610 Email : d a rg o @ g o rfi eld-cou nty. com Web : g o rfie I d-co u nty. com CONF.DENT)AuT| NOTICE: This emøil communicøtion ond ony files tronsmitted olong with it ore intended only for the person or entity to which it is addressed. lf you have received thís email ìn error, pleose immediately notify the sender by email and delete it from your files, Gurfield Coülnty Community Development Department March 22,2018 Chase Pearl Vanguard Operating LLC 112Red Feather Trail sitt, co 81652 RE: Director Decision - Minor Modification to the Circle B Land Company LLC, Use Change Permit (LIPA-05-1 4-7915) Dear Chase: The County is in receipt of your Application requesting a Minor Modification to the existing Circle B Land Company LLC, Land Use Change permit for a 5 Acre Storage Yard (laydown yard) and Welding Facility (LIPA-05-14-7915). The site is located approximately 5 miles south of the Town of Silt, off of County Road 326 in Section 23, T65, R92W of the 6th P.M. on a portion of that property known by Assessor's Parcel No.2179-233-00-203. ln accordance with the Gaffield County Land Use and Development Code Section 4-106 a pre-application meeting has been held to consider whether the requested modification meets the criteria contained in Section 4-106 (C) for a Minor Modification and a Director's Determination issued finding that the Minor Modification criteria were met. The Director's Decision is hereby issued, approving the Minor Modification as requested, in accordance with Section 4-106 8.1 .a., with the following clarifications and determinations. a. The Amended Land Use Change Permit Applicatíon submittals were determined to be complete in accordance with the Director's Determination Letter dated 2123118. b. That the Applicant has demolished the pre-existing barn structure. c. That the Applicant has established a revised building envelope for a new structure that will fully comply with all building code and fire code uirements. 1 issuance of the Buildi revrew s pnor Permit. WI tngtre e a co nm