Loading...
HomeMy WebLinkAboutOWTS Design Report 11.17.2017PERCOI..ATION TEST AND ON-SITE WASTEWATER TREATI'IENT SYSTEM DESIGN 13100 couNw RoAD 204 DE BEQUE, CO Prepared For Golorado Bullding Systems Prepared By: CAPSTONE ENTFRPRISES WEST,LLC GEOTECHNICAL AND MINING ENGINEERING TESTING AND INSPECTION SERVICES óI8 PARTEE DRIVE GRAND JUNCTION, CO 8I5O/* PHoNE (970) 250-5551 marti n@capstonewest.com t{ovember 17,2017 JobNo.4142 CAPSTONE ENTERPRISES WEST,LLC GEOTECHNICAL AND MINING ENGINEERING TESTING AND INSPECTION SERVICES óI8 PARTEE DRIVE GRAND JUNCTION, CO 8I5OI' PHONE (970) 250-5551 marti n@capstonewest.com November t7,2OL7 JOB # 4L42 Attn:Mark Dearth Colorado Building Systems Grand Junction, CO Subject:Percolation Test and On-Site Wastewater Treatment System Design, 13100 County Road 204 At your request, on October 23,20t7 Capstone Enterprises West, LLC directed and observed the excavation of three test p¡ts to evaluate onsite soils for design of an On-Site Wastewater Treatment System (OWTS). The suitability of soils was evaluated by performing a percolation test, as prescribed by the Garfield County regulations. The results of the percolation test and the OWTS design are presented in this report. lf you have any questions, or if we may be of further assistance, please do not hesitate to contact us. Respectfully Submitted : CAPSTONE ENTERPRISES WEST, ttc Martin W. Chenoweth, PE Registered Professional Engineer MWC 37784 2 PERCOI.AT¡ON TEST Per your request, Capstone Enterprises West, LLC performed a percolation test for your proposed building site. The test was performed as prescribed by the Garfield County regulations updated on April 21,2014. The site is in the east half of the southeast quarter of section 25 Township 6 South Range 99 West. The following map shows the general location' Ítû ¡ ¡ Í -t ,#1 'I +¡¡f tl The property is made up of 2 40-acre parcels that is a combination of irrigated farm land and undisturbed wilderness. The construction site will be in the farmed land. The following images show the property limits and the proposed building site. .Pt ,&<.,. 3 The proposed building site is in the irrigated land. This field slopes gently to the south at approximately 4o/o. The following image shows a detail of the proposed building site and the location of the test pits (TP) and the percolation holes (PH). 4 The OWTS investigation was performed at the same time as the geotechnical investigation for the foundation recommendation. Test pit TP1 was excavated to as the profile hole for the OWTS design. The profile hole was excavated to a depth of 9.0 feet (excavator refusal). Free water was not encountered nor was there evidence of a seasonal high-water table. The geologic log is presented on the following page. q PROFILE HOLE GEOLOGY Tp-1 0 TOFSOIL- Clay w/ Roo* Lt Brn- Silty Clay $fteetwash Sravels Thin Flat Fragments 10 A total of 3 perk holes were dug to evaluate the percolation rates in the shale. All holes were moisture conditioned as prescribed by Garfield County regulations. I 2 3 4 5 6 7 I I 6 The percolation test was performed 24 hours after the initial conditioning. The results for the percolation test are presented on the following pages. PH-1 Ëlapsed Time Cumulative Drop Percolation Rate Ultimate Perc Rate Design Perc Rate L+30"0 30 60 90 L20 0.00 3.63 6.50 8.50 12.00 8 9 L1 10 10 1.1 PH.2 Elapsed Time Cumulative Drop Percolation Rate Ultimate Perc Rate Design Perc Rate 14-30"o 30 60 90 L20 0.00 r.75 3.00 4.50 6.00 L7 20 20 2A 20 20 PH-3 Elapsed Time Cumulative Drop Percolation Rate Ultimate Perc Rate Design Perc Rate 1ll.30"0 30 60 90 t20 0.00 1.38 2.50 3.50 s.50 22 24 26 22 22 26 1 2û la 16 i.4 ----- Lifiìits -- PH-l _- PH-2 PH"] -Ò--a"- 20 Water Drop Vs Ïime 0J !J o-oL CJ fı i1 0L t) 4 2 0 U 40 6e¡ 8û Ilapsed Time {rninutes) 1.0i1 12û I All three perk test holes absorbed water within the prescribed limits (greater than 5 minutes per inch and less than 60 minutes per inch). The average of the last half hour of the two-hour test was 17 minutes per inch. Based on the results of the percolation test and the Garfield County Guidelines, the system has been designed based on a Long Term Acceptance Rate (LTAR) 0.60. Teble f0-1 Level Shaded a66 oqulÞ syc6m daign by I prôfe$longlcnginæ¡' TEatrc¡t l6.r¡s sÉ deliæd ¡n Trble 6-3. untiñ€d ß¡nd fileE ¡n lhose sotltypo! ghSll provids pelhoggn mofl. lbÊlgn shall confom to sdim ll c.z.q uñl¡nod s¡nd F¡fiæ . Htsh€r tong-tem æccfle¡6 rat6 fq l@fmnt Lsvst 3N may be ¡llq/id lor OWTS nqu¡Þd to haw s d¡rch¡rgs prm¡, if ltn qpabilily ol lhe dsslgn to achi€w 3 hlghol long.l.m d@ple@ Etê €n be sub6tantitt€d sdl TYps,fort¡Þ, St,uctw rnd P.rol.aid Ralc Ra¡gð Lorlg-l¡m Acc¡pa¡H R.Þ (LTARI; Od¡oE p€r d.y pÍ lqu¡rê fæt Soil Type UgOA Soll fô¡tuÞ uSoASoil Sl¡uohn- frhrp! ugDA 8óll 8lruc{uE. Cnd¡ Feftol¡llon tuÞ(tPll lntbnıl Lewl f I fralnant LPal 2t lmtmil Lwd 2ll! fuürfil bv¡l gr ÌEaùtsil Lwel 3llr' 0 gonTy¡c r r|$ mm ü¡n 3C9ß Rocl( (>zmm)i Sollly!.r2{$ümD ttrã t096 Rodr (>ânml 0 (8ln¡L Gnlîl <5 f¡Hîünm 3-tbôt dr.Þ uillßd ¡¡nd lllt r nqulnd¡ Mhkn ñ 2-tbol dd¡ uìilmd nrÉ iùt Ëqt¡trd Sand, Loamy ssnd 0 sr5 0.Eo r.?6 1.2a 1.10 1.40 2 slndy LM, Ltrr, sll Lom PR (Prbrl¡tic' ÊK (Blod(V¡ GR {geub¡) 2 (ModË¡e) 3 (Süûno)rÈ35 0.80 0.00 03t 1.00 t.@ 2A Sandy L@. LoEm. S¡lt Lorm PR, BK. 6R 0 (rcne) I (Weák) Meslw 2€4)&50 o.70 o.70 0.r0 0.60 3 Srndy Lom Cl¡y Sily Lom. Clay Cl¡y Lo€m PR, BK, GR 2,3 4160 035 0.60 0.Eo 0,60 0.€0 3 $nûychylam,e,hy l-o¡r!,8lþC¡y l¡tî FR. BI(, €R 0 tHblYl 6t-75 0.90 O.¡al,0.40 0r0 o.tt a $¡n{y chr, ohy, srt Cl¡t Pñ, FK oÊ ¡,3 7ù00 0.20 0.30 '0.30 030 ol0 a g.ndt Clrt, C¡r, tlltc¡v Pn, rl( 6R 0 I llhl.hr 9r¡20 0.r!o.20 0-20 0¿0 0.20 6 tol¡Ïyprr ¡.a F{¡lt 1,2,3 l¡t.0.10 0,t6 0.1ó o.tı 0.lg NOTE; 1 2 9 WASTE WATER TREATMENT SYSTEM DESIGN A single dwelling is planned for this site (-2,000 square feet). The residence at this site is planned to be a three (3) bedroom dwelling. Using the guidelines in the Garfield County On-Site Wastewater Treatment System (OWTS) Reoulations. Effective Date: April 21 ,2014, (OWTSR) the following sewage flow calculations were prepared: MAIN HOUSE Base flow 150 gallons per bedroom * 3 Q =450 gal lday Once again using the OWTSR the absorption area was calculated. Where: A = Absorption Area in square feet Q = Design Flow of sewage in gallons/day LTAR = Long Term Acceptance Rate (From Table 10-1,) o 450 AREA =LTAR 0.6 =750sqft Base Area Size Adjustment Factors Gravity Rock Total Absorption Bed Area 750 sq. ft. 1.2 1.0 900 sq. ft. A single l2footwide by 75 foot long absorption bed will be needed along with a 1,000 gallon sept¡c tank. The design details are attached. 10 1REV6t8t17DATEAdded EasementsDESCRIPTIONVIWCBYCKCAPSTONÊENTERPRISESó18 PARTEE DRIVEGRAND JUNCTION, CO 81504PHoNE (970) 250-s55tma rtin@capstonewest,comWEST,LLCBY MWCHENOWETH1'lt17t17PROJECT NO. 4142SHEET NO. 1 OF3scALE 1"=50"OWTS GENERAL LAYOUT13100 COUNTY ROAD 204355 rr351 t'r¡å2S lo f:e * 4a/aI'rt:rrJ J'..,,WELLT00' os REVInspection PortsPerforated ¡n GravelCapped 12" Above Ground4" PERFORATED DiSTRIBUTION LINES6" GRAVEL UNDER. 2" GRAVEL OVERFILTER FABRIC OVER GR,AVEL1.0" - 2.5'CLEAN ROCKUNCOMPACTED SOIL CAP(MOUND 5olo)1.01.03.0BED IN SECTIONEFFLUENT TN71Inspection Ports3DATEDESCRIPTIONBYCKCAPSTONFENTERPRTSESWEST,618 PARTEE DRIVEGRAND JUNCTION, CO 8I5OôPHoNE (970) 2s0-355tmartin@ca pstonewest.comLLCPROJECT NO. 4142BY tr¡ w cxElowern11117t17OWTS CONSTRUCTION DETAILS13100 COUNTY ROAD 204SHEET NO. 2oF3SCALE NTS REVFloor ElevationExisting Ground976.5EFFLUENT LINE.3%DISCHARGE LINE -3%4" SCH 401,000 Gal tankScale (feet)DATEDESCRIPTÏONBYCKCAPSTONÈENTERPRTSESWEST,óI8 PARTEE DRIVEGRAND JUNCTION, CO 81504PHoNE (970) 250-5551mart¡n@capstonewest.comLLCPROJECï NO. 4142BY MWCHENOWETH'l1t17t17OWTS SYSTEM PROFILE13100 COUNTY ROAD 204SHEET NO. 3oF3scALE 1.=15'