HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-05-17-4753
Red Barn Guest Ranch — Bridal Suite Lodging
345 Mid -Valley Lane, County Road 262
New Castle, Colorado
1) ALL WORK TO COMPLY WITH THE 2015 I.B.C., I.M.C., I.P.C., I.F.G.C., THE 2009 I.E.C.C.,
I.F.C., AND IN ACCORDANCE WITH MANUFACTURERS' INSTALLATION INSTRUCTIONS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS
AND INSPECTIONS POLICY.
3) ALL WORK MUST COMPLY WITH CONDITIONS OF THE CURRENT LAND -USE PERMIT.
4) BUILDING IS APPROVED AS NON-SPRINKLERED, CONSTRUCTION TYPE V -B WITH
OCCUPANCY/USE = RESIDENTIAL GROUP R-1.
5) PROVIDE COPY OF ENGINEER'S FINAL INSTALLATION REPORT FOR NEW SEPTIC SYSTEM,
INCLUDING SIZING OF SYSTEM AND DESIGN CRITERIA TO ACCOMMODATE ALL NEW
OCCUPANCIES/USE WITHIN EXISTING BUILDINGS (CARRIAGE HOUSE, GUEST HOUSE &
BRIDAL SUITE).
6) FIRE PARTITION SEPARATION WALLS ARE REQUIRED BETWEEN SLEEPING ROOMS PER
I.B.C., SECTIONS 420.2 AND 708. SEPARATION WALLS SHALL HAVE A FIRE -RESISTIVE
RATING OF NOT LESS THAN 1 HOUR, AND SHALL EXTEND FROM TOP OF FOUNDATION
UP TO THE UNDERSIDE OF ROOF SHEATHING.
7) SPECIFIC REFERENCE IS MADE TO THE ATTACHED STRUCTURAL ENGINEER'S EVALUATION
REPORT OF THE EXISTING STRUCTURE. INCORPORATE ALL PERTINENT REQUIREMENTS
FOR BUILDING CODE COMPLIANCE AS CONTAINED IN THIS EVALUATION REPORT.
8) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT I.F.C. REQUIREMENTS. FIRE DISTRICT
FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
9) LOCKS, LATCHES & LANDINGS PER I.B.C., SECTION 1008.
10)ACCESSIBILTY REQUIREMENTS- INCLUDING ACCESSIBLE ROUTES, ENTRANCES, DOORS,
PLUMBING ELEMENTS & FACILITIES - PER I.B.C., CHAPTER 11, AND ICC/A117.1-2009.
11) LIGHT AND VENTILATION PER I.B.C., CHAPTER 12.
12) PLUMBING REQUIREMENTS PER I.B.C., CHAPTER 29 & INTERNATIONAL PLUMBING CODE.
13) MECHANICAL & VENTILATION REQUIREMENTS PER INTERNATIONAL MECHANICAL CODE.
14) ELECTRICAL REQUIREMENTS, PERMITTING & INSPECTIONS PER STATE OF COLORADO
ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAMING
INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY.