HomeMy WebLinkAboutSection 4 ComplianceGIANINETTI SPRING CREEK GUEST RANCH
LODGING FACILITY
SECTION 4
This section includes point by point responses to Article 7 Standards, Divisions 1-
3 and the Impact Analysis per Section 4-203 G of the Garfield County LUDC.
Please note that these responses are only for the Gianinetti Spring Creek Ranch
Lodging Facility. Responses for the Event Center/Meeting Facility portion of the
Guest Ranch are in the separate, companion application.
1IPage
SECTION 4
COMPLIANCE WITH ARTICLE 7, DIVISIONS 1 - 3
The following section of this application addresses compliance with the criteria
and standards of Article 7, Divisions 1-3 of the Garfield County Land Use and
Development Code. Responses to each criterion are in "italics". Where
standards don't apply, NA or reason for non -applicability will be stated.
DIVISION 1 GENERAL APPROVAL STANDARDS FOR LAND USE
CHANGE PERMITS
Section 7-101 Compliance with Zone District Use Restrictions.
Response: The site is located in the County's Rural "R" Zone
District. The Gianinetti Spring Creek Ranch Lodging Facility
will be in compliance with the Zone District, lot and building
requirements, Intent Statement, use and general restrictions
and measurements contained in Article 3 (Zoning) of the
LUDC. With such a large parcel, compliance with Zone
District dimensional criteria is very easy. For example, the
setback for many structures on the site to the West property
line is approximately 400 feet. Guest cabins will be less than
25 feet in height.
Section 7-102 Compliance with Comprehensive Plan and
Intergovernmental Agreements
Response: We addressed this issue in detail in Section 2 of
the Application — Project Background and Information.
Garfield County Comprehensive Plan 2030 designates the
site as Residential Low Density. The County Comp Plan
discussion lists agricultural and rural uses and even
Accessory Dwelling units that are buffered from incompatible
uses that are nearby. Density for this designation is 10 acres
per dwelling unit.
This property is also an important component of the Town of
Carbondale Comprehensive Plan. The Town Plan notes this
property as "River Corridor and Floodplain Conservation
Area" and a further designation as "Priority Agricultural
Land". As explained in numerous places of this application,
the development plan avoids 100 -year Floodway and
preserves Wetlands and other priority areas.
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
2IPage
Please note that the Town's Comprehensive Plan does not
designate this area for annexation during the life of this
Comprehensive Plan (completed in 2013). There are three
important areas in the plan - noted as Phase 1 to Phase 3
Priority Annexation areas. Nowhere in the Town
Comprehensive Plan is the Gianinetti Family Property
designated for annexation.
Intergovernmental Agreements. Gianinetti Family
representatives have discussed this property with the Town
a couple of times, including when this plan was being
submitted. The proposed land -use was discussed as well as
the issue of utilizing the town's wastewater system. The
Gianinettis do not wish to annex to the Town of Carbondale.
They feel that the county's Rural Zoning is most appropriate
for their future needs. The Town has also been quite clear
that the town's wastewater utilities will not be able to be
utilized without annexation to the town. The Gianinettis have
thought thoroughly on this issue and still do not wish to
annex into the Town. Therefore, they have undertaken
design and planning efforts to take care of their own
wastewater and the fluid produced by this project.
Per the Intergovernmental Agreement with the Town and the
County, we acknowledge that this application will be
reviewed by the Town and have submitted a copy to the
Town in advance of the County Agency referrals.
Our conclusion is that the development plan is in
conformance with both the County and Town's
Comprehensive Plans as well as any Intergovernmental
Agreement between the two jurisdictions.
Section 7-103 Compatibility
Response: The nature, scale and intensity of the proposed
uses are compatible with adjacent land uses. Presently,
there are agricultural related uses and these have always fit
in well with the Roaring Fork River to the north as well as the
agricultural uses to the east/ southeast and Town open
space area to the south. To the west are commercial and
residential uses located in the Town's Cowen PUD and
Roaring Fork Village PUD. The guest cabins are a
compatible land -use with the adjacent Country Inn and Days
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
3IPage
Inn - located directly to the est and on the bluff adjacent to
the Guest Ranch.
Conclusion. The Project is compatible with adjacent land
uses.
Section 7-104 Sufficient Legal and Physical Source of Water
Response: There is both a sufficient Physical and Legal
source of water for the project. An Engineering Report
included in the application provide the details. The water
system is noted as a private, non -community water system
that does not require treatment. The system will be
chlorinated if a water quality report indicates that it is
necessary. The system has been designed by a licensed,
Colorado engineer.
The Gianinetti Family owns a significant water rights portfolio
that was mentioned earlier and is summarized in Section 3
The development will be obtaining an allotment from the
Basalt Water Conservancy District in concert with this
application. Once the land -use application is approved, the
Family will obtain a well permit. The well will be in the
general location has indicated on the Site Plan
Section 7-105 Central Water Distribution and Wastewater Systems
Response: Please see details on the details of the water
and Wastewater Systems as designed by the Project
Engineer. (Section 3 - Technical Documents)
Section 7-106 Public Utilities
Response: Adequate public utilities are available. The
property presently has electric service provided by Holy
Cross Electric. That is the only utility presently on site.
Propane will be utilized for all facilities. Will Serve letters are
included in Section 5- Miscellaneous Documents. Water
and Wastewater discussed above.
Section 7-107 Access and Roadways
Response: No new public roads are being provided. The
property has existing access from Cowen Drive a Town of
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
4IPage
Carbondale street. A basic traffic study is included as part of
the Engineering Report (see Section 3 — Technical
Documents). The access driveway already exists.
Comments on the road geometry, surface materials and
other information is also included in the Engineering Report.
An existing semi -primitive road system provides travel over
to various parts the property. These are considered private
driveways and are open to the owners and users of the
property, but not the general public.
No recent traffic studies related to traffic volume for Cowen
Drive were available from the town of Carbondale. The
project engineer gathered some background traffic data as
part of the Basic Traffic Study.
Conclusion. Access off the Town Street system appears to
be working satisfactorily as there are is no record of
deficiencies or complaints to or from the town. The present
access driveway already exists on site and has served the
property and Event Center for many years. Attached is an
email from the Carbondale and Rural Fire Protection District
Fire Marshall indicating that the access is satisfactory. The
Project Engineer has cited no deficiencies.
Please note that the existing access driveway from Cowan
Drive down to the Bottomland is approximately 19 feet in
width. This driveway will be widened to 20 feet at the
recommendation of the Fire Marshall. This width is narrower
than required for a semi -primitive driveway/roadway. A waiver
has been requested. See Sections 2 and 3 of the application.
Section 7-108 Use of Land Subject to Natural Hazards
Response: We have addressed Floodplain Regulations
Wetlands and High groundwater as part of the engineering
reports application. There will be no development near the
hillside. There are no known areas of mud flow, radiation,
snow/have landslides etc. A Geotech Engineer has analyzed
the soils related do septic suitability.
Section 7-109 Fire Protection
Response: Wildfire Hazards are low or "Not Rated" for the
subject property according to the County Risk Assessment
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
5IPage
Maps. Both the Project Planner and Project Engineer have
discussed emergency access and Fire Protection with the
District Fire Marshall and he has been submitted a copy of
the proposed Site Plan. He will respond formally as part of
the County Referral process.
DIVISION 2 GENERAL RESOURCE PROTECTION STANDARDS FOR
LAND USE CHANGE PERMITS
Resource Protection Standards apply to all proposed land -
use changes, unless specifically exempted.
Section 7-201 Protection of Agricultural Lands
A. No Adverse Effect to Agricultural Operations.
Response: There should be no adverse effect. The property
is fenced along the West and South boundaries and guest
will be instructed to remain on the property.
B. Domestic Animal Controls.
Response: Any dogs will be kenneled or sheltered as
necessary.
C. Fences.
Response: No new fences are included in the development
application.
D. Roads
Response: No public roads are being constructed. All
internal roadways are considered to be private driveways.
They will not be paved. Snow removal will be performed as
necessary for the cabins by the owner. Dust control will
occur as necessary both during and after construction —
primarily by application of water if necessary and by
application of Mag Chloride if those efforts are not
successful. Please note that all internal private drives are
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
6IPage
positioned well away from neighboring agricultural
operations.
E. Ditches
No adverse affect on Ag Lands: The Lyons Ditch proceeds
through the area. The Gianinettis are the only shareholder.
There are no downstream users.
Tail water and underutilized augmented water from the
Weaver Leonhardy Ditch (AKA Gianinetti ditch) comes to the
property. There are no downstream users.
Existing ditches will not be modified. Any crossings will have
adequate culverts. No development will channel surface
water to any ditches.
Section 7-202 Protection of Wildlife Habitat Areas
Response:
There are no identified critical Wildlife Habitat Areas. This
subject property is not identified as Winter Concentration
area or Severe Winter range for either elk or mule deer.
There are no known raptor nests or similar critical breeding
habitat. No new fences are being constructed which would
interfere with any animals that may cross the property.
Section 7-203 Protection of Water bodies
Response: The protection of the Roaring Fork River
Floodway and Wetlands has been documented in other
sections of the application.
The 35 -foot horizontal setback from any TOHWM (Typical
and Ordinary High Water Mark) is being maintained from all
water bodies including ditches, ponds, streams and the river.
Hazardous materials (if any) will also comply with the
minimum 100 foot setback from TOHWM.
• In addition:
Significant existing native vegetation will not be
removed.
• Natural service drainage characteristics will be
maintained. Grading will be minimized.
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
7IPage
• Development will comply with all applicable County,
state and federal laws including those of the CDPHE
Water Quality Control Division and the Army Corps of
Engineers.
Section 7-204 Drainage and Erosion
Response: Comments are as follows:
• Site disturbance will be minimal. The refined site plan
indicates that there will less than 1 acre of site
disturbance, and therefore will not require a discharge
permit from the CDPHE. If final construction details show
disturbance greater than 1 acre, the owner will apply for
the appropriate Discharge Permit.
• No lots are being created — residential or commercial.
• Hard surface is minimized throughout the project. For
example, there are no paved or driving surfaces — which
minimizes storm water runoff.
• Runoff is being designed to seep naturally into the
property without being directed into water bodies or
ditches.
• Positive drainage is being maintained away from all
buildings.
• Initial indications are that there will be no required
detention ponds for runoff.
Section 7-205 Environmental Quality
Response:
• No impacts are foreseen related to air quality — no
activities related to the development should create smoke
or other discharges related to air quality.
• Water Quality. Activity areas are designed to be at an
acceptable distance between any water bodies, ditches
etc. Any hazardous materials will be stored in compliance
with state and federal regulations.
Section 7-206 Wildfire Hazards
Response:
• The subject property is listed as being in a low or non-
rated wildfire hazard area. Areas of significant slope are
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
8IPage
relatively small and limited to the Western fringe of the
property.
• Fire Marshall has been made aware of plans and has
previously visited the site. He will comment as part of the
County Referral Process.
Section 7-207 Natural and Geologic Hazards
Response: An existing overhead power line goes through
the property. Portions of this power line will be under
grounded. Any additional electric to the site will be provided
underground.
The Area is subject to Floodway and Wetlands regulations.
These have been noted previously in the application and the
necessary engineering designs are provided throughout.
The property is not located in an avalanche, landslide, rock
fall, alluvial fan, areas of extreme slope subject to
development etc.
Section 7-208 Reclamation
Response: The development will comply with the standards
outlined in Section 7-208 of the Land Use Code. Site
disturbance will be relatively minimal. Improvements to the
private driveways and a small extension of dirt road are
relatively minimal. All guest cabins will be modest in size
(400 to 750 ft. 2 in size) and a maximum of 9 cabins (12
bedrooms) is relatively modest for an 83 acre property. All
disturbance will be reclaimed and re -vegetated with native
grasses.
DIVISION 3 SITE PLANNING AND DEVELOPMENT STANDARDS
The standards in this section apply to any land use change
and all uses, including divisions of land and PUD's. Single-
family dwelling units are exempt. Some standards would
appear not to be relevant due to the specific use —
Community Event/Meeting Center. Minimal development
will be undertaken on land outside the northern portions of
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
9IPage
the parcel. However, we will address these sections for
completeness purposes and in order to show the
relationship of the existing land use with applicable
standards as much as possible
Section 7-301 Compatible Design
Response: The Events Center and its proposed
management plan meets these standards.
A. Site Organization. NA. There are no public streets or
defined lots or common areas around which to organize
the site. Parking will be located adjacent to any cabins.
Access is by the existing access drive. Pedestrian and
bike access is also accommodated via the access
driveway.
8. Operational Characteristics. There are no everyday
activities from this particular use. There are no general
hours of operation etc. Other comments:
• No dust, objectionable orders, gas or fumes should be
admitted to adjacent property.
• Noise should not be a problem for the guest ranch
area. The various members of the Gianinetti family
live adjacent to the site and regularly police it. The
secluded nature helps with this noise buffering.
C. Buffering. No required buffering is anticipated. The guest
ranch lodging cabins will be located at the northern
portion of the property and away from adjoining property
boundaries. No buffering requests, either of a visual or
noise buffering nature have been made in the past
because of previous events. Moreover, lands to the
north, east and south are in the same zone district and
have similar land uses.
D. Materials. Materials will be barn wood or other
appropriate, rustic finishes. Specific exterior materials have
not yet been designed.
Section 7-302 Off- Street Parking and Loading Standards
Response: Section 7-302 A- 0, may not be applicable. Uses
are intermittent and no regular off-street parking or loading is
required. There are no adjacent public streets.
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
101Page
Parking areas will be adjacent to the cabins.
Section 7-303 Landscaping Standards
Response: The project will comply with the intent of the
County's Landscaping Standards in this section. Specifically:
no trees or other significant vegetation are being removed.
Trees and shrubs may be planted by the cabins and any
trees will be compatible with the plantings by the Event
Center. Areas required for landscaping will not be used for
any parking or storage. There is sufficient clear vision area
and no trees exist or are being planted vicinity of Cowen
Drive and the access driveway.
Section 7-304 Lighting Standards
Response. No outdoor lighting is proposed at this time. Any
lighting that is necessary will comply with the standards of
this section of the Garfield County LUDC, and will be
downcast and shielded as necessary.
Section 7-305 Snow Storage Standards
Response: Snow will be plowed from the access driveway
and from the vicinity of the cabins as necessary. Snow
storage will not be a problem on such a large parcel.
Section 7-306 Trail and Walkway Standards
Response: NA. There are no permanent facilities, regular
hours of operation or permanent residential units which will
make trails or walkways necessary. The property is generally
open, and visitors/event attendees can walk where they
wish.
Gianinetti Spring Creek Lodging Facility— Compliance Article 7
Wage
Impact Analysis
Below are the evaluation criteria outlined in Section 4-203 G (Impact Analysis) for the
Gianinetti Springs Creek Lodging Facility. We will address each criterion on a point by
point basis. Where they do not apply, we will indicate with "NA"
1. Adjacent land use. Existing use of adjacent property/neighboring properties within
1500 -foot radius.
Response: The most intense use from a development perspective occurs to the west
of the subject property — a portion of Roaring Fork Village and Cowen Convenience
Center of the Town of Carbondale. To the east and south are generally
rural/agricultural land uses. To the north is dryland/riverbank of the Roaring Fork
River, the SH 82 right-of-way and steep hillside adjacent to the BLM/ Red Hill Area.
More specifically:
West: Single Family subdivision — Roaring Fork Village & Gianinetti Subdivision
5 townhome units
Commercial/office, hotel/motel and convenient center (Cowen Center)
South: Single Family residence at rural Garfield County density
Delaney Park (AKA Delaney -dog park) - Town of Carbondale
East: Agricultural and single-family rural residential lots
North: Streambank (dry) going from Roaring Fork River to State Highway 82
SH 82 right-of-way
Steep hillside rising from SH 82 towards BLM/Red Hill Recreation area
2. Site Features. A description of site features such as streams, areas subject to
flooding, lakes, topography, vegetation cover etc.
Gianinetti Spring Creek Lodging Facility Impact Analysis
2IPage
Response: The subject property is generally located in the Roaring River Bottom
land adjacent to the Town of Carbondale's Northeast boundary. Site features are as
follows (see Boundary Survey/Existing Conditions Map):
• Roaring Fork River main channel
• 3 stream/ditches emptying into the Roaring Fork River
• North riverbank (dry) leading from Roaring Fork River to SH 82 roadway
surface
• Roaring Fork River Floodplain
• Wetlands
• Irrigated hay fields
• General agricultural equipment and storage
• 2 ponds
• newly constructed Agricultural Barn
• Hillside along West property boundary characterized by Oak brush and other
upland vegetation
Impact to natural site features will be nonexistent or minimal. Structural development is
limited to a maximum of 9 small lodging cabins. The dirt road circulation system already
exists on property though this may be expanded to some degree for circulation
purposes. Parking area areas for the cabins will be unpaved. Utility infrastructure will be
minimal. This includes construction of a OWTS, a non-public water system and new
propane service. Electric overhead already exists on site and any new electrical service
will be provided underground. The existing overhead will be partially undergrounded.
3. Soil Characteristics:
Response: The subject property is subject to alluvial deposits, riparian areas,
ditches/streams and irrigated hay fields. Depth to groundwater is approximately 2
feet. An in-depth soil studies has not been done at this time. Pits's have been dug
for the OWTS analysis and inspection done by HP Kumar. A letter on the results is
attached.
4. Geology and Hazard. A description of the geologic characteristics of the area
including any potential natural or man-made hazards, and the determination of what
effects such factors would have on the proposed use of land.
Response: As noted above, a formal Geotech analysis has not been undertaken as
the geologic and natural hazards appears self-evident. Hazards are high
groundwater table, Roaring Fork River Floodplain and riparian areas.
Gianinetti Spring Creek Lodging Facility Impact Analysis
3IPage
Floodplain. Project engineer has confirmed the Floodway and Floodplain area. All
development will remain out of the Floodway. Otherwise, development will comply
with County and National standards, with the finished floor elevation for any guest
cabins being 1 foot higher than base flood elevation.
Wetlands. A qualified Riparian/wetlands professional has identified the Wetlands
and confirmation by the Army Core of Engineers is in process. All development will
occur outside the Wetlands area. Wetlands were identified and mapped in calendar
year 2017.
High Groundwater. This has been taken into account with the development plan.
Development will utilize Best Management Practices related to construction of
facilities, septic and extension of internal driveways. Paving/hard surface
improvements are being kept to a minimum.
It is our opinion that impact of all geologic and other hazards is minimal and has
been mitigated/meets all County and Federal standards.
5. Groundwater and Aquifer Recharge Areas. Evaluation of the relationship of the
subject parcel to floodplains, the nature of soils and subsoils and their ability to
adequately support waste disposal, the slope of land, effect of sewage effluents, and
the pollution of surface runoff, streamflow and groundwater.
Response: Description of the physical site has been made a number of times in this
application. We believe that the impacts of the proposed land -use are nonexistent or
minimal.
Floodplain. The Project Engineer has confirmed the location of the Floodplain. There
will be absolutely no development in the Floodway. The Floodplain downstream of
the subject property will not be affected. Construction of the guest cabins will be in
conformance with local and national regulations — Finish Floor elevation 1 foot above
BFE.
Soils and Subsoil's — ability to adequately support waste disposal. The septic system
is a mounded system and is being built in compliance with all County regulations. A
formal OWTS application will be made in compliance with all County permitting upon
approval of the LUCP. HP Kumar has inspected the pits for suitability of septic.
Wetlands. No construction is to take place in the defined Wetlands area. Wetlands
have been defined by a competent professional.
Slope of Land. No impact. Hillsides are not being proposed for any development act
to the or any disturbance.
Pollution of surface runoff, streamflow and groundwater. Operation should not cause
additional pollution that would affect streamflow and groundwater. Guest cabins will
Gianinetti Spring Creek Lodging Facility Impact Analysis
4IPage
have people utilizing and enjoying the area in a passive manner and not undertaking
activities such as car repair, changing oil or any commercial/industrial related
activities. There will be no car repairs or even any recreational activities which
should generate pollution. Property owners will supervise events and take care of all
debris, solid waste etc. Septic is sized to accommodate proposed events and guest
cabins.
6. Environmental Impacts. Determination of the existing environmental conditions of
the parcel to be developed and the effect of development on those conditions,
including:
a. Determination of the long-term and short-term effect on flora and fauna;
Response - Flora and Fauna: Any construction will be taking place in open areas
where there are native or pasture grasses. No significant vegetation will be cut or
removed. Negative effect on fauna should be minimal. No additional fences are
being proposed — so wildlife should build a pass-through as they have historically
done. It is our understanding, due to its location and necking down of the river
area by the SH 82/133 bridge does not make it generally conducive as a major
migration route.
b. Determination of the effect on designated environmental resources, including
critical wildlife habitat;
Response: as noted above, project will stay out of Floodway and Wetland areas.
We are not aware of their being any critical wildlife habitat designation for this
parcel/property.
c. Impacts on wildlife and domestic animals through creation of hazardous
attractions, alteration of existing native vegetation, blockade of migration routes,
use patterns, or other disruptions; and
Response: No significant impact foreseen. Alteration of existing vegetation will be
nonexistent or minimal —No attractive or hazardous nuisances are being created.
No migration routes are being blocked. No other disruptions should occur.
No "attractive "or hazardous nuisances are being constructed or utilized on site.
d. Evaluation of any potential radiation hazard that may have been identified by the
state or County Health Departments.
Gianinetti Spring Creek Lodging Facility Impact Analysis
SIPage
Response: To our knowledge, no known radiation hazards have been identified
in this vicinity.
7. Nuisance. Impact to adjacent land from generation of vapor, dust, smoke, noise,
glare or vibration, or other emanations.
Response: The nature of the guess cabin area is such that no unusual vapor, glare
or vibration should be created. These are not industrial, semi -industrial or
commercial in nature. By its Floodplain and Bottomland nature, the area is relatively
moist and dust should not be a problem (plus it is relatively protected from huge
gusts of wind due to being tucked up to the base of the hill).
Noise was brought up as an issue during the Pre -application Meeting. However, the
concern for noise would be from the Event Center, not the cabins.
8. Hours of Operation.
No set hours of operation are intended for the cabin/lodging area.
Gianinetti Spring Creek Lodging Facility Impact Analysis