HomeMy WebLinkAboutGeotechnical Engineering Study 02.16.2010Tu*hBri unb þøøøúatvø
CONSU LTING GEOTECHNICAL ENGINEERS AN D MATERIAL TESTING
GEOTECHNTC/\L ENCINEERTNG STUDY
STEEL BUTLDING, VAULTS, PONDS AND
ON*SITE IND]VTDUAL SEWAGE DTSPOSAL SYSTEM
CGRS PROJECT NO. L-L02i 0-1_L127 aa
NE]./4, NË1 / 4 , SL'2, T7S, R93W
RIFIJE, COLORADO
Prepared for
LLr.lf 5
PROJECT NUMBER: G09033cE
FEBRUARY 16, 201.0
"Copyright @ Terra Firma Consultanls, Tnc. 2009" all rights reserved
p.0. 80x 3986
GRAND JUNCTION, CO 81502
(e7o) 24s6506
FAx: (970) 248-97s8
P. O. BÕX 0043
MONTROSE,CO 81402
(e7o) 243-2154
F,Ax: (970) 249-3262
Tw*htúænil þøønúatw
CONSULTING GEOTECI.INICAL ENG I NEERS AN D MATEH IAL TESTI NG
CGRS
P. O.
Fort
Box 1498 .
Collins, Colorado 80522
February 16, 2010
P. O, BOX 0045
MONTROSE, CO 81402
(970) 249-21 54
FAXr (970) 24s-3262
Attention: Mr. Paul Sorensen, P.E
PN: G09033cE
Subject: Geotechnical Engineering Study for Lhe
Proposed Steel Building, Vaults, Ponds and
On*Sit.e Individual Sewagie Disposal System
NEI-/4, NEI-/4, SLz, T7S, R93W
nifle, Colorado
Mr. Sorensen
Lambert and Associates is pleasecl to present. our geotechnical
enqineeríngr study for t.he subject projecL. The fietd study was
completed on December 23, 2009. The laboratory study was
complet,ed on Jart.uary 22, 20L0 . The analysi-s was perf ormed and
the report prepared from .Tanuary 25 Lhrough February 1-6, 2010.
Our geotechnícal engineering report is attached.
We are available to provide material t.esLing services for soil
and concrete and provide fourrdation excavation observat.ions
during construction. We recomrnend that. Lambert and AssociaLes,
the geotechnical engrineer, for t.he project provide material
testing services to mainLain continuity between design and
construction phases.
If you have any quesLions concerning t.he geotechnical
engineering aspect-s of your project please contact us. Thank you
for the opportunity to perform thi-s study for you.
Respectfully submiLLed,
LAMBERT AND ASS
Danie LamberL, P.E
P. O. BOX 3988
GRAND JUNCTION, CO 8.f 502
(970) 245-6506
FAx: (970) 248-9758
2
c09033c8
TABLE OF CONTENTS
1.0 INTRODUCTTON
Proposed Construct.ion
Scope of Services
CHARACTERISTTCS
Site Location
Síte Conditions
Subsurface Conditions
Sit.e Geology
Seismicity
3.0 PLANNING AND DESIGN CONSIDERATIONS
4. O ON-SITE DEVELOPMENT CONSIDERATIONS
5. O FOUNDATTON SUPPORT CHARACTERÏSTIC
5.1 Swell Potential
5.2 Set,t,J-ement Pot.ential
5.3 Soil Support Characteristics
6. O FOInVDATION RECOMMENDATIONS
6.l- Drilled Piers
6.2 Spread Footing Foundations
TNTERIOR FLOOR SLAB D]SCUSSION
LEACH FIELD CONSTDERATIONS
COMPACTED STRUCTUFAL FILL
O LATERAL EARTH PRESSURES
O DRATN SYSTEM
O BACKFTLL
O SURFACE DRAINAGE
O LANDSCAPB TRRIGATÏON
O SO]L CORROSIVITY TO CONCRETE
O RADON CONSTDERATTONS
O POST DESIGN CONSTDERATIONS
l-7 .l- Structural Fi]l QualiLY
L7.2 Concrete QualitY
1B. O I,TM]TATTONS
MATERIALS TESTING CONCEPT
ASFE PUBLICATION
PROJECT VICTNITY MAP
TEST BOR]NG LOCATTON SKETCH
CONCEPTIONAI, SKETCH OF FOOT]NG SUBGRADE
EMBEDMENT CONCEPT
BACKFTLL ZONE OF INFLUENCE CONCEPT
DRAIN SYSTEM
FTELD STUDY
KEY TO LOG OF TEST BORING
LOG OF TEST BORTNGS
LABORATORY STUDY
SWELL_CONSOI,IDATTON TESTS
GEOLOGY DISCUSSTON SOUTHWtrST COLORADO
GEOLOGY
GENERAL GEOTECHNICAL ENGTNEERING
CONSIDERATIONS
RADON FLOI^J CONCEPT
Page L
1_
L
¿
a
3
3
4
4
4
5
'7
7
B
a
ôo
I
11
L9
¿¿
24
26
21
zó
29
29
30
31-
J¿
Figrure
TREATMENT
Appendix
Figures A1
Figures A2 - A7
Appendix B
Figures Bl- - 82
Appendix C
Appendix D
Figure Di
lsmhert snù ßlggocinted
L.L
L.2
O SITE
2.L
1a
2.3
z.c)Ê,
7,0
8.0
9.0
10.
1_1-.
L2.
t-3.
L4.
1EIJ.
1b.
L7.
l-
aL
3
4
5
6
A
CONSULIING GEOTECHNICAL €}IGINÊÉRS ANO
ITATERIAL IESIING
c09033cFl
1.0 INTRODUCTTON
This report presents the results of the geotechnical engiineering
st.udy we conducled for the proposed steel building, st.orag'e ponds,vaults and sepLic system. The study was conducted at the request,of Mr. Paul sorensen, P.E. CGRS, in accordance with our proposal-
for geotechnical enqineering services dated sepLember 30, 2009.
The conclusions / sugtgiestions and recommendatíons presented ínthis report are based. on the data gat,hered during our site andlaboratory study and on our experience with similar soil condi-Lions. FacLual data gat.hered during t.he f ield and laboratory workare summarized in Appendices A and B.
1-. 1 Proposed ConsLruction
It is our understanding the proposed construction is to include
an approxímate forty two (42) foot by eiqhty Eight (BB) foot slabon grade type building, several underground vaults, seveïal storage
Lype ponds and an on-site domest,ic effluent. sewaqe disposal system.
L.2 Scope of Services
Our services included geotechnical engineering field and labora-Lory stuclies, analysis of the acquired dat.a and report preparation
for the proposed site. The scope of our services is outlined
below.
The fielcl study consisted of describing and sampling the soil
materials encountered in nine (9) small- díameter continuous
f liqhl aug:er advanced t.est. borings.
Two (2) tesL borings were located in the general vicinity of
Lhe proposed storaqe ponds.
Three (3) t.est boríngs were locat.ed in the greneral vicinity of
the proposed building and vault.s.
- We advanced one (1) profile test. boringr and three (3) shallow
percolat.ion tesL borings within the general vicinil-y of the
proposecl ef f l-uent. disposal system leach f ield area.
The materials encounLered in the t.est borings \^/ere described
and sampl-es ret.rieved for the subsequent laboratory study.
The laboratory study included LesLs of select soil samples
obtained during the fíeld study to help assess:
l'smbert snb ãggscúetsd I
I
COIISULf ING GEOTECHNICAL ÉNGINEERS ANO
MATÊR¡AL T€STING
c09033GE
the soil strength potential (inlernal friction angrle and
cohesion) of samples tested,
Lhe swell and expansion potential of the samples tesled,
Lhe set.tlemenl/consolidat.ion potential of the samples
Lested,
the moisture conLent and density of samples tested, and
t.he soil sulfate concent,ration of soíl samples LesLed.
This report presents our g-eotechnical engineeríng commenLs,
suggestions and recommendations for planning: and design of site
development including :
viable foundation types for t.he conditions encountered,
allowable bearing'pressures for t.he foundation types,
lateral earth pressure recommendat.ions for desígn of
taterally loaded walls,
geoLechnical eng,ineering- considerations and recommendations
for concreLe slab on grrade floors, and
geotechnical engineering considerations and recommendations
for compacted sLructural fiIf '
Our comments, suggestions and recommendations are ]:ased on the
subsurface soil and g¡round waLer conditions encountered duringt
our siLe and laboraLory st-uclies'
Our study did not. include any environmental
..i ^^,.^^
or geologic hazard
2 . O S]TE CHARACTERISTICS
Sit.e characterist.ics include oÌ:served existing and pre-exLscrng
site conditions that may influence the geotechnical engineering
aspecLs of t.he proposed site development '
2.L Site Localion
The sit.e is located in the NE L/4 0f the NE i-l4 0f section
Township 7s, Range 93W in Garfield" county, souLh of Rifle,
colorado. A project vicinity map is presenLed on Figure 1-.
flsmbert snù ß[ggocÍuteg
1)
.)
CONSIJLIING GEOTECHNICAL ËNGINEERS ANO
I¡AfERIAL TÊSTING
c0 9 03 3GE
2.2 Site Condition
The site is currently a vacant tract of land. The area is
relat.ively flat, vegeLated wit.h grass and weeds, and exhibits
surface drainage toward Lhe east. The northeast portion of t,he
site is current.ly occupied by a pigging station. North of the site
is an existing compressor sLation.
The site is bord.ered to the east. by a dirt access road. The site
is bord.ered. tó the west and south by land. símilar in Lerrain to Lhe
subject site.
2.3 Subsurface Conditions
The subsurface exploration consisted of observing, describing and
sampling the soil materials encountered in nine (9) small diameter
auger advanced test borings. The approximaLe locations of Lhe test
borings are shown on Figure 2. The logs describing the soil
malerials encounLered in t.he test boringrs are presenLed ín Appendix
A.
The soil materials encountered wifhin the tesL borings generally
consisted of silty, sandy clay material underlain by Wasatch
FormaLion material. The formational maLerial was encounLered at
approximate ciept.hs of Lwo and one-half (2-L/2) to six and one-half
(6-1/2) feet. below existing site qrades ancl ext,ended to the depLhs
explored, approximately nine t9) to twenLy-seven (27) feeL below
exísting site surface grades. Free subsurface water was not
encoun.Lerecl during the drilling operations.
At Lhe time of our field study Lhe proposed development siLe was
not irrigated. It has been our experience that. after the sit.e is
d.eveloped and once landscape irrigation begins the free subsurface
water level may tend Lo ríse. In some cases t.he free subsurface
waLer level rise, as a result of landscape irrigation and ot.her
d.evelopment, influences, can be fairly dramaLic and the water level
may become Very shallow.
IL is difficutt t.o pred,ict if unexpected subsurface conditions
will be encountered during conslruction. Since such conditíons may
be found, we suggest that the owner and the contracLor make provi-
sions in t.heir budget and. construcLion scheclule to accommodate
unexpecLed subsurface conditions .
Lembert enù Ftrggstísted
3
CONSULTING GEOTËCHNICAL ENGINEERS ÀND
MAÌERIAL TESTING
A brief discussíon of the gerreral geology of the area near the
site is presented in Append.ix c. The surface geology of the síte
was determined by obseivation of the surface condiLions at the site
and observingi t.he soils encounLered in t.he Lest borings on Lhe
siLe.
c0 9 03 3GE
2 .4 Sit.e GeologY
'¿ .5 SeasmtcatY
According Lo the International Building Cod.e, 2006 EdiLion, based
on the subsurface condiLions encountered and the assumption that'
t.he soils described in the t.est. borings are líkety representative
of the top 100 feet of the soil profilel vre recommend Lhat the sj'te
soil profile be So.
3.0 PLANN]NG AND DESIGN CONS]DERJ\TIONS
A çteologic hazard study was not requesLed as part of the
this report, however there are some conditions which were
at the site durinq the field sLud.y which may influence the
menL.
scope of
observed
develop-
may
in
kept
Al1 of the suggtesLions and design parameters presented ín this
report are based on high quality craftsmanship, care duringr con-
struction and post construction cogni zance of the potentíal for
swell or seLtlement of the síLe support materíals and appropriaLe
post construct.ion maintenance'
All construct.ion excavaLions should- be sloped to prevenL
excavat.ionwa]-lcollapse.Wesuggestthatasaminimumthe
excavalion walls should be sloped at an inclinaLion of one-and-one-
halfQ_I/2)toone(1)(horizont'altovertical)orflat.ter.The
area above the foundat.ion excavations should be observed at -east
daily for evidence of slope movement during construction' I:
evidence of slope movement is observed we should be contacLec
immediaLely.
we anticipate Lhat excavaLion and firl placement operations
be associated with the proposed síte development. Excavatio::s
the area which generale verLical or sloped exposures should be
to a minimum.
f.smbert nnù FlggnúEted
4
CONSULTING GEOIECHHICAL EHGINEERS ANO
I¿ATERIAL TÊSTIÑG
c0 9 03 3cE
Excavations whi-ch result in cut. slopes with a vertical height.greater than about four (4) feet. or wiLh a slc;pe or struct.ure aboveshould be analyzed on a Site slrer-:i .ßic hasis. ,l,emporary excavrtio¡rcut slopes in competent material should not, exceed a one-and-one-half Lo one (t*1-/2 to 1-) (horizontal t.o vertical) inclination. A1lconstruction excavations should conform to OccupaLional safety andHealLh Administ,ration (OSHA) standards or safer. All permanent.slopes should have inclinaLions of t.hree to one (3 to 1) (horizontalto verLical) or shallower, Excavation cul slopes steeper t,han one-and-one*half to one (L-1,/2 t,o j_) (horizont,al to verLical) should beanalyzed on a per site basis.
Slope and excavation
and/or ot.her means Lo
be allowed to cascade
of any slope.
surfaces should be prot.ected by vegietatíonprevent erosion. Surface runoff should notover Lhe top of a slope or to pond at the toe
hie anticipate that some embankment, fill slopes will be construct-ed on lhe site. Fill slopes g.reater than abrout three (3) feetvertical heigrhL or fill slopes supporting structures wíll requireadclitional analysis' we reconìmend that each proposed f ill slope onthe sit.e be analyzed on a per site basis when the proposed siteconfiguration and fill material- has been determíned. rf fill slopeswill be constructed on site we should be contacLed to providegeotechnical eng"ineeringr review and recornmendaLions for the clesiç¡rnand construction of Lhe slopes.
4, O ON-S]TE DEVELOPMENT CONSIDERATIONS
we anticipate that the subsurface water elevation may fluct.uatewith seasonal and oLher varying conclit.ions. Excavations mayencount.er subsurface wat,er and, soils that tend Lo cave or yie1d.rf water is encountered it may be necessary to dewater construct.ionexcavations Lo provide more suitable workinq condiLions.Excavations should be well braced or sloped to prevent, wal1 cof-lapse. Federal, stat.e and loca1 safety codes should bre obrserved.Al-l construcLion excavations should conform to occupational Safetyand HealLh Administration (OSHA) st.andards or safer.
The site
\^/ater away
allowed Lo
ated water
construction surface should be graded to drain surfacefrom the site excavations. surface water should not beaccumulat.e in excavalions during construcLion. Accumul--could neg:at.ively influence the site soil condítions.
T.smbert snù Flggstíeteø
5
CONSULIING GÉOTECXNICAL ENGINE€NS ANO
MAIERIÀL IESIINC
c09033cE
Construction surface drainage should ínclude sv/ales, if necessary
to divert surf ace v/ater away f rom Lhe const.ruction excavaLions.
Organic soil materials were encountered in the Lest borings. The
organic soil materials are not suitable for support of the struc*
ture or structural components. The organic soil materials should
be removed prior to foundation construction.
It is our understanding that the site development. will include a
domest,ic efftuent syslem which will include a leach field. The
moisture from t,he leach field w111 ínfluence the moisture content
of the site subsurface soifs. An increase in t.he subsurface mois-
Lure content will decrease the strength of the influenced soi1s.
The formational malerial encount.erecl in Lhe test. borings was very
hard. IrVe anticipate that it may be possible to excavate this
material ,' ho\nrever, additional effort may be necessary. We do not
recommend blastinçr t.o aid in excavàtion of the material. Blasting
may fracture t.he formational matería} which will reduce the support
characterisLic integrity of the format.ional material.
It. has been our experience that sites in developed areas may con-
tain exist.ing subterranean st,ructures or poor qualÍty man placed
fill. ff subLerranean sLrucLures or poor quality man placecl fill
are suspecLed or encountered, they should be removed and replaced
with compact,ed structural fill as discussed under COMPACTED STRUC-
TURAL F]LL below
The proposed builclinq site has been used in the recent past for
agrrícultural purposes. We anticipate t.hat the near surface site
soils may have been tilled to a depth of about twelve (L2) t.o
eighteen (18) inches. Tilling typícally result,s in a loose l-ow
density soil with low supporL characteristics and high sett.l-ement.
characteristics. The foundations or any concreLe flat work should
noL be supported t¡y tilled soils. The near surface tilled soils
should be removed and replaced with compact ed struct-uraf fill in
areas supporting structures, st,ructural components or concrete flat
work.
The soil materials exposed in the bott.om of the excavation may be
moíst and may become yieldinq under construction traffic during
construction. fL may be necessary tÕ use Lechniques for place¡nenL
of fill material or foundation concrete which limits construci.ion
t.raffic in the viciniLy of the very moisL soil mat.erial . lf
yielding should occur during consLruction iL may be necessary co
![smbeut nnù ßlssocisteø
6
COHSULlING OEOÍECHNICAI FNG¡NFFRS ANO
ÍATERIAL TCSfING
c09033cE
constrlrct a subqrade stabilizati.on fill btanket or simirar toprovide construct.ion traf f ic access. T'he subgrade stabilizat.ionblankel may includ.e over excavaf.irrg llre snhgrade soils orre (I) toseverar feet and repracing with aggregat,e subbase course Lypematerial-. The stabilization blanket may also include geotex¡ilestabilization fabríc at t.he bottom of the excavation prior topracement of aggregate subbase course stabilization fill. othersubgrade slabilizat.ion techniques may be avail-able. we areavailable to discuss this wilh you.
5. O FOUNDAT]ON SUPPORT CHARACTERTSTIC
Two crj-teria for foundat.ion design which musL be saLisfiedsaLisfactory performance are :
for
r-)conlact stresses must. be 10w enough to preclude shearfailure of t.he foundation soils which would result. in lat.eralmovemenL of the soils from beneat.h t.he found.at,ion, and
2) settl-ement or heave of the foundation must be within amol.rntstolerable t.o t.he superstrucLure.
The soil materials encountered in the test borings have varyingengineering characteristics LhaL may ínfluence the design and.construction considerations of foundations. The characteristícsinclucle swell pot,ential, settlement. potential, bearì_ngi capacity andthe bearing conditions of t.he soil-s support.ing the f oundalions.These are discussed below.
5.1 Swell Pot.ential
some of the materi-als encountered in the test borings at theanLicipated foundation depths may have swell pot.ential. swellpotential is the tendency of the soil Lo increase in volume whenbecomes wetLed. The volume change occurs as moist.ure is absorbedinto Lhe soil and waLer molecules become aLtached to or adsorbedthe individual clay plat1et.s. Associat.ed with the process ofvolume change ì-s swell pressure. The swell pressure is the forcethe soils applies on its surroundings when moisture is absorbedinto t.he soil. Foundation design consideraLions concerningswelling soils include st.rucLure Lolerance t.o movement. and deaclload pressures to help restrict uplift. The st,ructure's toleranceto movement should be addressed by Lhe structural engineer and isdependent upon many facet,s of the design including the overallstructural concept and the buílding' material. The uplift forces or
T.embert enù €lggseiflteø
iL
br¡
7
CONSULTING GEOÍECIINICAL ÉNGINÉERS ANO
I'AIERIAL IESTING
c09033c8
pressure due to wetted clay soils can be addressed by designing' the
foundaLions to account for swelling soils.
5.2 Settlement Potential
Settlement pot,ent.íal of a soíl is the tendency for a soil to
experience volume change when subjectecl Lo a load. Sett.lement is
charact,erized by downward movemenL of all or a port.ion of the
supporLed st.ructure as the soil particles move closer together
resulLing in decreased soil volume. Settlement potential is a
funct,ion oÊ foundation loads, depth of footing embedment, t.he widt.h
of the footing and the selLlement potenlial or compressibility of
the influenced soil. Foundation design considerations concerning
setLl-ement poLent.ial include the amount of movement tolerable to
the sLructure and t.he design and construction concepts to help
reduce t.he potential movement.
5.3 Soil Support Characteristics
'l'ne sof I
properLies
width, the
the lowest
the amount
bearing capacity is a function of the engineering
of the soils supporting the foundalions, the foundaLion
depth of embedment of the bottom of the foundat.ion below
adjacent. grade, Lhe influence of the ground wat.er and
of settlement tolerable Lo Lhe struclure.
Foundat,ions for the structures should be placed on relatively
uniform bearing conditions. Varying support characteristics of the
soils supporLing the foundation may result in nonuníform or
different.ial performance of the foundation. The influence of
nonuniform bearingr conditions may be reduced by recognizing ancl
accommodating during the site specific design.
6. O FOUNDATION RECOMMENDATÏONS
Geotechnical engíneeri-ng consideraLíons which influence the
foundat.ion design and consLrucLion recommendations presented below
are discussed in Appendix o.
We have analyzed drílled piers
poLenLial foundation sysLems for
are discussed below.
and spread footing foundaLions as
the proposecl struct.ures. These
We recommend thaL the enLire st,ruct.ure be supporLed on only one
foundaLion type. Combining foundation types wíl-1 result in differ-
flsmhert snù Øggscisteg
ö
:t
CONSULlIHG CEOTECHNICAL ENGINEERS AND
MATERIAL TESTING
c09033G8
enLial and unpredictable foundation performance between t.he varying
-[ourrrlaLiutr Lypes. Wë recommend that t,he strucLure f ootprirlt not, be
traversecl l:y l-Ìie cut./fill contacL which would result in a portion
of the sfructure underlain by fill material and part of the
structure underlain by materials exposed by excavaLed cut. ff Lhis
conditíon will exist please contacL r.ls so that. v/e can revise our
recommendations to accommodate the cut/f.Ll-I conLacL scenario.
All of t.he design parameLers present.ed below are basecl on tech-
nigues performed by an experienced compeLenL contractor and high
quality craftsmanship and care during construction. We recommencl
post const.ruclion cognizance of t.he volume change potential of t.he
near surface soil materials and Lhe need for appropriate post
const,ruction maintenance .
The spread fooLing recommendations include recornmended design and
const.ruction t.echniques to reduce t.he influence of movement of the
soil materials supporting the foundation but should. not be
interpreted as solutions for complet,ely mitiqating the potential
for movement from the support soil mat,erial volume change.
Exterior col"umn supporLs shoulcl be supported Lry foundatlons
incorporat.ed into the foundation system of Lhe structure nol
supported on flatwork. Column supports placed on exterior concrete
flatwork may move if the support soils below the concreLe slab on
grade become wetted and swel1 or freeze and raise or settle.
Differential movement of the exLerior columns may cause stress to
accumufate in the support,ed structure and translate int.o other
porLions of the structure
6.1 Drilled Piers
Drilled piers or caj-ssons that are drilled into the unweathered
formaLional mat,erial may be used to supporL the proposed structure.
The piers should be drilled a minimum lengt.h of fifteen (15) feet
or a minimum of ten (10) feet into Lhe harcl unweaLherecl formational
material, whichever ís deeper. The piers should be designed as end
bearingi piers using a formational mat.erial bearing capacity of
L7,000 pounds per square foot and a side friction of L,'700 pounds
per square foot for the porLíon of bhe pier in t,he unweaLhered
formational material. The drilled piers should be desigrned with a
minimum dead load of 1,000 pounds per square foot.. Varying
weathering and formational compet,ence may result in a shorter
required penetrat.ion of the drilled piers inLo t.he formational
material to provide the end bearing capacity discussed above. We
le¡nbert snù Flggsciuteg
:
i
9
CONSULIING GEOTECHNICAL €NGINEERS ANO
TTAÎERIAL IESfING
c09033cE
should be contacLed to observe the pier drilling operations and
provide additional geotechnical engiineering suggestions and
recommendatic¡ns for design bearing' capacíty and minimum penetraLi-on
into the format.ional material as needed.
There are differing theories on the use of side shear as part of
tLie load carrying assessment of drilled pier foundation systems.
The differences are related t.o the strain compatibility between end
bearing and side shrear. One theory is t.hat mobilization of the
drilled pier ís required to generate t.he side shear soil strength
values. This mobilization would require the movemenL of the botLom
of the pier which may not be a desirable characLeristic. Anot.her
Lheory is t.hat. the support materials will develop staLic frictional-
forces in contact with Lhe materials along- the surface of the pier.
It is our opinion t.hat sufficient movement of the piers Lo mobi-
lize skin friction for bearing supporL may resulL in undesirabl-e
performance of the pier in Lhe form of settlement. We suggest
consideration Lo the amount, of sett.lement tolerable Lo t.he struc-
ture be íncluded in your assessment íf skin friction is used in
your desigrn as part of the bearing support of the drilled pier.
We suggest ttrat piers be designed using end bcarinq capacity
only. The side shear in the formational material may be usecl for
Lhe desig:n t.o resist uplift forces. When using skin friction for
resistinq uplift we sì-rggest that you discount the upper porLion of
the pier embedment in the formational material to a depth of at
leasL one and one-half (L-L/2) pier diameters into Lhe formaLional
material.
The l:ott.om of the píer holes should be thoroughly cleaned to
insure that all loose and clisturbed materíals are removed prior to
placing pier concreLe. It is very important. to thoroughly clean
Lhe botLom of the pier holes prior to placement. of the pier
concret,e. Loose disLurbed material left. in the bott.om of t.he pier
hole will likely result in long term settlement of the piers as Lhe
disturbed material- consolidat.ed under the pier loads. The pier
holes shoulcl be observed during the excavation and cleaning
operation and" again immediaLely prior Lo placement. of pier co:rcrel-e
aft.er steel reinforcemenL and any casinq materials have been
insLalled Lo verify that material was noL dislodge into the pier
hole d.uring steel reinforcement or casing placement'
Because of the
when unloaded by
reboundinq poLential in t.he formational materials
excavation and because of Lhe possibifiLy of
[smbert anù flgsocinted
10
COHSULTING G€OÍÉCHNICAL ENGINEERS ÀNÛ
I.lATEÍIIAL TÊ,51ING
G09 03 3cE
desiccation of the newly exposed mat,erial we suggest that. concretebe placed in t.he pier holes immediately after excavation and
cleaninq.
rf the piers are designed and constructed as discussed above weanLicípate thaL the post construction set.t,lement poLenLial of eachpier may be less than about one half (1"/2) inch.
The portion of Lhe pier above the format.ional surface and in theweathered formational material should be cased with a sono tube orsimilar casing to help prevent flaring on the top of the pier holes
and help províde a posit.ive separation of the pier concrete and t,headjacent soils.
Conslruction of the piers should includ.e exLreme care Lo prevent
flaring of the top of the piers. Enlarged port.ions of the drilledpier excavat.ion near the surface may perform similar t.o Lhe Lopflaring. Preventing flaring may be aided by casing the drirledpier excavalion with a sono Lube or similar casing. Reducingflaring is to help red.uce the pot.ential of swelling soils to imposeuplift forces which will puL the pier in tension. The clrilledpiers should be verLically reinforced to provide tensile strenqthin the piers should swelling on site soíls apply tensile forces onthe piers. The structural engineer should be consulted to provide
strucLural desigri recoinmendations .
Free grouncl water was moL encount.ered during the clril1ing
operations, however, our experíence in the area indicates thatfractured layers may exíst in the formationa] material and t.hat. thefractured layers may carry or store water.
If ground water is encountered during pier drilling, Lhe pier
holes should be dewatered prior to placing pier concrete and nopier concrete should be placed when more than six ( 6 ) inches of
waLer exists in t.he bottom of the pier holes. The piers should be
filled \,^/ith a tremie placed concret,e immediately after t.he drittingf
and creaninq operation is complet.e. rl- may be necessary to case
the pier holes with temporary casinE to prevenL cavingl during pier
const,ruction.
Difficult c1ríl1ing condiLions were encountered with our drill rig
cluring our fiel-d sLudy. We anticipate that pier drillíng equipment
available in the area may have difficulLy drilling the format.ional
material. ït may be necessary to obtain specialty drilling equip-
ment, possibly not. available in western Colorado, Lo advance the
drilled pier holes. We are available to discuss this with you.
Lsmbert snù flggsrífltsd
CONSUTTING GEOTÊCHI¡ICAL ENGINEÉRS ANO
ll
MATER!AL TESTING
c0 9 03 3cE
The contact between the weaLhered formaLional material and the
unweaLhered formational material may be gradual and difficult' I'o
identify. The minimum penetraLion of the drilled pier ínto the
unweat,hered format.ional maLerial as discussed above is important,
for the long term performance of the pier foundation. We should be
contacted to observe the pier d.ríllíng operation t.o verífy the
construction techniques used, the material encounLered during the
drillinçt operalion and condition of the bott.om of t.he drilled pier
hote prior Lo placement of pier concrete '
The structural engrineer should be consulted to províde sLrucLural
design recomnendations for the drilled píers and girade beam founda-
tion system.
6.2 Spread Footing Foundations
In our analysis it was necessary to assume that the material
encounLered in t.he test borings extended throughout the building
siLe and to a depth below the maximum depth of t.he influence of the
foundatíons. VrIe should be contacled to observe the soiL materials
exposed in t.he foundatiorr excavations prior to placement of
foundations to verífy the assumptions macle during our analysís '
The shale derived soil materials near Lhe surface and Lhe shale
layers within Lhe formaLional maLerial are expansive. These
materials are likely Lo be encounLered in the foundation
excavations. Spread footingr foundations should not be supported on
materials wiLh differing support characterístícs ' The site
maLerials may vary from soil to sandstone to shale within the
founclation excavaLion. These varyingr support material conoíUions
will result in differing lonq term performance of the different
areas of the spread footing. For this reason we Suggesl that if
formational maLerial is encounLered only in portions of the
foundation excavaLions at footing depth t.he foundation in all areas
should be ext,ended to support. all foundalion members on the
formational materíal. Overexcavation and placing of compacted filf
material blanket, as discussed in this report, beneath the spread
footing will somewhat mask t.he long term performance
characLerisLics of t.he differingr support. materials.
The bottom of the foundation excavations should be Lhoroughl-y
cleaned and observed when excavated.. Any loose or disturbeC'
maLerial exposed in the foundation excavaLion should be renoved
prior Lo placing foundation concreLe'
T,nmbert f,ilù Øggocísteg
I
:,.
¡
1,2
cnNsurflNG cEolEci{NlcAL ENGIt{€ERS ANO
I¡ATERIAL TEETII.¡G
c09033cE
The bottom of t.he foundation excavations shoulri he compacf.erlprior to placing compacted st.ruct,Lrral filt or foundation concrete.hle suggest thc mate¡rials exposed b'e cornpacLeú Lu aL leasL:rinety(90) percent of the materials moísLure content-dry density rela-Lionship (Proctor) tesL, ASTM Dl-557. Excavation compaction is tohelp reduce the influence of any disturbance that, may occur duringthe excavation operat,ions. Any areas of roose, low density oryielding soils evidenced during the excavalion compaction operaLionshould be removed and replaced with compacted structural fill.caution should be exercised during t.he excavat.íon compactionoperations. Excess ro1líng or compacting may increase pore pres-sure of the subgrade soil material and degrade the inLegrity of thesupport scils. Loose or disturbed material in the bottom of t.hefoundation excavatj-ons which are intended Lo support sLrucLural
members will like1y result. in large and unpredictable amounts ofseLtlemenl., if the Loose or disturbed mat.erial is not compact,ed"
The boLtom of any footíngs exposed t.o freezing temperatures
shouLd be placed below the maximum depth of frost penetration for
Lhe area. Refer t.o t.he local building code for d.etails.
All footings should be appropriately proportioned. to reduce t.hepost consLruction differential settlement,. Footingis for largelocalized loads should be designed for bearing pressures and.footing dimensions in the range of adjacenL footings to red.uce Lhepotential for differential seLt.lement. We are avaílable to cliscussthis wiLh you.
Foundalion walls should be reinforced for geotechnicar
enqineering, purposes. The sLructural engineer should be consultedfor foundation design. The structural engineeringr reinforcingdesign t.ailored for t.his project will be more appropriate Lhan the
suggestions present.ed above.
The structures may be f ounded on spread footings. Vrle recommend.the use of a blanlcet of st,ructure fill material beneath the spreadfootíng foundation members. spread foot.ing's may be placed eitheron the natural undisLurbed soils or on a brankeL of compacted
st,ructural fill. The blanket of compacted sLructural fill is tohelp provi-de uniform support. for the footings and Lo help reduce
the theoretical calculaLed post. construct.ion settlement.. The
theoretical calculated post construction settlement and associat.ed
fill t.hickness supportingr the footings are presented below.
{,smbert snù Øsøaú&tes
]
t-3
CONSULIING GEOTECHNICAL ËNGINÊ€RS AI{D
MATERIAL TESTING
c09033GE
We suggest that you consider Lhe foundation be supported on a
blankeL of compacted structural fill at least one (1) foot thick Lo
help mask the influence of volume change soil materials supporting
the footings. The blanket of compact.ed structural fil1 will not
prevent movement of the footings from volume change in the support-
soil materials but will mask the influence of volume changes of the
soils supportinq t.he foot.ings. If the footings are supported on a
blanket. of compacLed sLructural fitl the blanket. of compact,ed
structural fill should extend beyond each edge of each footing a
distance at leasL equal to the filf thickness. This concept is
shown on Figure 3.
Geotechnical engineering recommendations for constructing
compacted structural fill are presenLed below'
AII footinqs should have a minimum depth of embedment of at leasL
one (1) foot below the lowesL adjacenL grade when placed either on
the naLural- und.isturbed soils or a blanket of compacted strucLural
f ill. Deeper embedment will be need,ed for footings exposed t"o
exteríor cflmaLe.
The l:earing capacity wíll depend on the minimum depth of embedm-
ent. of the boLtom of the fooLinqs below the lowest adjacent girade
and Lhe support characLeristics of the soils supporLing the founda-
tion. Ot.her characteristics may influence embedment. The emhed-
ment. concept is shor¡rn on Figure 4. Bearing capacity and' associated
minimum clepLh of embedment of the l:ottom of the footing below the
lowest acljacent grade are presented below'
SPREAD FOOTING
SOTL BEARING CAPACITY
CONTINUOUS ISOLATED
L, 650
1-, 900
2 ,200
2 ,350
2,700
3, 100
ð
( feeL )
0
I
2
A* Minimum clept.h of embedment for fooLinqs adjacent Lo level
areas
If deeper embedment is considered for increased bearing capacity
greater t.han presented above, we should be conLacted t.o provide
aclditional analysis and recommendations as needed' The bearing
capacity design value is based on several considerations and these
may change with dePth'
T.smhert nuh ß[ggnrinteg
CONSULf ING GEOTECHNICAL ENG¡NÊERS AND
MATERIAL TESIING
!
:.
L4
c09033cE
The bearing capacíty may be increased by about twenty (20¡percent. for transieuL loacls such as wind and seismic loads.
rt is our opinion that footings exposed to frost or freezingground influences and all exLerior footings should. be embedded tofrost depLh or deeper. rnt,erior fooLings should have a minimumdepth of embedmenL of at least, one (1) foot on all sides to providea more predictable long Lerm performance of the footing. weunderstand Lhat consLruction techniques Lypically used in Lhe areamay result in some of the footings in the crawl space constructedwilhout signíficant embedment of t.he botLom of the footingr belowLhe lowesL adjacent grade. For this reason v/e have provided desiç¡'nval-ues for footings consLructed with little or no embedment. rt. ísour opinion that. the performance of footing consLructed without
embedment may be influenced by erosion, temperature changes,moist,ure content chang,es, swell pot.ential of Lhe soil supportingrthe footings and weat,hering of t.he soils supporting the footingsand will have a less predictable settlement response Lhan footingswíth embed.ment.
Exterior footíngs and footings \,úit.h uneven backfill may result inmovement of Lhe footings. Embedment of the footings on all sideswill help reduce the poLential for movement of footings with uneven
backf il1. Vrle do not recofiìmend exterior f ootings or footings withuneven backfill be consLructecl wiLhout a minimum d.ept.h of embedmenLof the bottom of Lhe footinq below t.he lowest adjacent grade of atl-easl one (1) foot on all sides of Lhe footings.
The minimum depth of embedment ís sufficient only t.o develop thetrea-ring capacity for desig"n prirposes and. does not account for frostínfluences - Actual design and construction should resulL ininterior foolings with one (1) foot or more embedment and exteriorfootings with frosL depth or more embed.ment. Typically deeper
embedment will i-ncrease bearing capacity and decrease posLconst.ruction settlement and decrease the influence of expansivesoi1s.
The soil sample tesled had a measured swell pressure ofapproximately 500 pouncls per square foot. and the actual swellpressrire of the support materials could be greaLer. when wetLedthe sit.e. soil materials have t.he ability to raise supported
foundat.ion members wiLh loads less than Lhe swell pressure. The
foundaLion design should be as rigid as possible wiLh as high of
dead load as can be avaitable. The greater the dead load on thefootings the less the potential for movement from the foundation
Lsmbert snù Hgøocistes
a
t-5
CONSULÍ IHG GEOTECHNICAL ENGIHEERS AND
HAlERIÀL TESIING
c0 9 03 3cE
soils should Lhey become wetted. If t,he soils become wetled they
will swell and will raise the foundation portions supported on the
weLted soils. If the structure is supporLed on spread footings the
owner musL realize that. post conslrucLion movement of the footings
is likely. We are available to discuss the implÍcaLions of
supporting foundatíons on swelling soils.
Interior column loads supported on spread footingrs which are
sLructuratly connected to the other foundation members will provide
more uniform performance of the inLerior footings with respect Lo
t.he other found.aLion members and will help reduce the potenLial
differenLial seltlement between int,erior and exLerior foundation
members. The f oundat.ion walls should be desigtned to act as beams
t.o clist-ribute stresses associated with the swelling volume changies
of soils. The beam design should be addressed by Lhe project
sLrucLural engineer,
Exterior column supporls should be support.ed by foundations
incorporat.ed into the foundation system of the strucLure not
support.ed on flatwork. Column supports placed on exterior concrete
flatwork may move if the support soils below the concrete slab on
grade become wetled and swe1l or freeze ancl raise or settle.
Differential movemenL of the exteríor columns may cause stress to
accumulate in the supported sLructure and translale inLo other
porLions of the struclure.
The calculated theoretical estimated posL conslruction seLtlemenL
and swell potential may be reduced by placing the footings on a
blanket of compacted sLructural fifl. The calculated ttreoretícal
estimated post construction setLlement and associat.ed t.hickness of
compacted structural fill are presenLed below.
TH]CKNESS OF
COMPACTED STRUCTURAL F]LL
CALCULATED THEORETICAL ESTIMATED POST
CONSTRUCTION SETTLEMENT FOR
CONTINUOUS SPREJ\D FOOTTNGS
( TNCHES )STTPPORTTNG F'ÔNTNTNêS
ì
:
0
*B/2
B
38 /2
1"-L /2
1
3/4
L/2
-t tr
CONSULTING GEOTECHNICAL ENGINEERS À¡ID
MATSNIAL IESTING
G09033cE
THTCKNESS OF
COMPACTEIJ STRUCTURAL FTLL
CALCULATED THEORETTCAT, ESTTMATED POST
CONSTRUCTTON SETTLEMENT FOR
ISOLATED SPRE.â.D FOOTINGS
( TNEHE,C )sITppÔR1.TNt',l I.OO.FÏT\TGS
0
*B/2
B
3B/2
2-L/ 4
L_L/B
1 /1
1//.
*B is equal Lo Lhe footing \^/idth
The calculated theoretical estimat.ed sett,lement values above areappropriate for conLinuous spread foot.ings wiLh a \,,,/idth of abouttwo (2) feet or less and isolated spread foot.ings with a width ofabout four (4) feet or less. Larger footings should be analyzed, ona footing, load and width specific basis.
Footings should be sized so thal each fooLingr is in a similarsize and load rang"e as nearby fooLings to encourag:e simi-larperformance. very large foot.ings or heavily loaded footíngs willinfluence the support soil materials t.o a deeper depth than smallor lighlly loaded footings and therefore will have different post
const,ruction perf ormance .
The calculated settlemenL estimat.es are theoretical only
sett,lement could vary throughout the site and wiLh time.
Actual
If the footings are supported on a blankeL of compacted st.ructur-al fil1, the blanket- of compacted st,ructural fill should extend.
beyond each edgre of each footing a clisLance aL leasL equal to thefill thickness. This concept i-s shown on Figure 3. CompactedStructural Fil1 is discussed in Section 9.0 below.
The siLe soil samples tested have a measured swell pressure ofless than 100 pounds per square foot, however, the act,uar swellpressure of the support material could be g:reaLer. This swellpressure \¡/as measured for soils at the iniLial moisLure conte:rt ofthe soil sample tested. The swell pot.ential of the site soilmateriafs could vary significant.ly and. could be great.er than ihat.
measured. The measured swell pressure may be influenced. by drstur-
bance of the sample during' the sampling operation and the soii
suction poLential and initial moislure conLenL.
Changes in Lhe initial moist,ure cont'ent will
ence the swel1 pressure of the sit.e soils. If
sígnificantly influ-
the initial moisture
Lambert snù Øggstinteg
I
LI
collSULTlNG GEOIÉCHNICAL ENGINE€RS ANO
MATERIAL TESTING
c09033Gtr
conlent of t.he found.ation soils is less Lhan that of the test
sample Lhe acLual swell pressures will likely be significantly
higrher t.han measured.. If the ínitial moisture contenL of Lhe
founclatíon soils is greater than that of t.he test sample the aclual
swell pressures may be less than measured.
The soil sample tested had a measured swell pressure of
approximaLely 400 pounds per square fooL and the acLual swell
pressure of the supporL materials could be greater. When wet-ted
the site soil materials have the ability to raise supported
f oundat.ion members with loads less than t.he swell pressure. The
foundat.ion d.esign should be as rigid as possible with as high of a
dead. load as can be availabte. The greater the dead load on Lhe
footings the less the potential for movemenL from the foundation
soils should. t.hey become wet.ted. If the soils become wetted they
witl swell and will raise the foundation porLions supported on the
wetted soils.
If liqhtly loaded sLructure members are supporled on spread
footings on expansive soil material then the owner musL realize
Lhat post consLruction movemenl of t.he footings is 1ike1y. These
ligrhtly loaded areas of the footing should be designed with
sufficient structural int.egrity to resist the forces from swelling
soi ls .
Foundation members that will have significant.ly small or low dead
loads, such as foundations beneaLh wall openingrs such as doorways,
may be provided with positive separation between the foundaLion
concreLe and. the und.erlying soil materials. That separation may be
provicled by using commercial void form material. We recolÌlmend LhaL
the struct,ural engineer be consulted concerning the void form
design concepL.
If Lhe void form desigrn concept is part of the foundation design
we sug.gest that the foundation design may consider including a four
(4) to six (6) inch corrugaled paper void form maLerial beneath the
footinqs in the lightly loaded port,ions of the foundation. The
corrugiated paper void forms provide temporary supporL for
foundaLion concreLe during construction. The low strength of the
voíd form material is intended to a1low the underlying soil
materials to expand. into the void form thereby exerting Less or no
uptift pressure on the foundation in the areas it is usecl' We are
available to d.iscuss the implications of supporting foundations on
swelling soils.
T.amhert nnù Aøgsríflted
CONçULTIN6 GEOTECIiNICAL ÊNGINEERS AND
:J
1-B
MATERIAL TESTING
G09033GFl
The bot.tom of the foundation excavations shouLd. be Lhoroushlyclearrecl and observed by the project Geotechnical Enqineer or hisrepreserlLdtive when exca,val-ed. Any o1d fil-l- or loose or disturbedmaterial exposed in the foundation excavatíon should. be removed orremedíed prior t.o additional construct.ion.
we recommend LhaL we be contacled to observe the foundationexcavations and backfill operations during const,ruction ¡o verifythe soil support. conditions and. our assumpLions upon which ourrecoflìmendations are based. Tf necessary we may revise our recom-mendations based, on our observations. We are available t.o providematerial testing servíces during t.he const,ruct.íon phase of theproj ect.
1,0 TNTEF-TOR FLOOR SLAB DTSCUSSION
It is our understanding that concret,e slab on grade floors may beinclucled in [he const.rucLion. The natural soils thaL will supportinterior floor slabs are stable at their natural moist.ure content.However, Lhe owner should realize that when wetted., the siLe soils
may experience volume changes. The site soil samples t.ested had, ameasured swell- pressure of approximately 500 pounds per square foot.and an associat,ed magnitudes of o .7 to l_.I percent of the weLtedsoil volume at a surcharge load of 100 pounds per square foot.
The recommendatj-ons in this report do not address a monolit.hicfloor slab/footing combination. The design and constructioncharact,eristics of the monolithic floor slab need geotechnical
engineering design parameters cailored specifically for amonolithic slab and íntegral footing. Generatly this typefoundaLion/floor combination in Lhis area with these sitecondiLions does not. perform as well as oLher choices.
Condit,ions which vary from those encountered during: our fieldstudy may become apparent during excavation. I¡le should be conLact-ed t.o observe the condirions exposed at concrete slab on gracle
subgrade elevat,ion Lo verify t.he assumpt,ions made during thepreparation of this report. and to provide additional geotechnical
engineering suggrestions and recommendations as needed.
Engineering clesign dealing wit.h swelling soils is an art which isstill developing. The owner is cautioned Lhat the soils on this
site may have swelling pot.ential and concrete slab on g'rade floors
and ot,her liqhLly loaded members may experience movemenl when the
l[.smbert anù €lggstí&teø
L9
COHSULTING GÊOTÊCHNICAL ÉNGINÊERS AND
¡,tA1ÉRIAI TESIING
c0 9 03 3cE
supporting soils become wetted. We suggest you consíder floors
suspended from the foundation sy.stems as structural floors or a
similar design that will not be influenced by subg¡rade volume
changes. If Lhe owner is willing to accept the risk of possible
d"amage from swelling soils support.inq concrete slab on grade
floors, Lhe followinq recommendations to help reduce the damage
from swellingi soils should" be followed- These reconÌmendations are
based on generalty accep¡ed design and construcLion procedures for
construction on soils t.hat tend to experience volume changes when
wetted and. are intended to help reduce the damage callsed by swell-
ing soil materials. Lamberl and AssociaLes does noL intend that
the owner, or the owner's consultants should interpreL these
recorTìmend.at.ions as a sotution to the problems of swellinq soils,
buL as measures to reduce the influence of swelling soils '
The shallow soil materials tested have a moderaLe volume change
potential under lighL toading conditions ' concrete slab on grade
floors may experience noticeable movemenL when slrpporLed by the
natural onsite soils. concrete slab on grade floors will perform
best if clesigned Lo tolerate movement inLroduced by the subqrade
soil materi.al s.
concrete f]atwork, such as concrete sl-ab on grade floors, should
be underlain by compact.ed sLrucLural fill. The layer of compacLed
fill should be at least one (1) fooL thick or thicker and con-
structed. as discussed under COMPACTED STRUCTURAL FILL below' A one
(1) foot thick or thicker blanket of sLrucLural fill maLerial
beneath Lhe concrete flatwork is not sufficient Lo enLírely mask
the set.tlement or swell potenLial of the subgrad'e soil maLeríal bul
will only provide better subqrade conditions for constructíon' The
concrete slab on grade should be desígned by a sLructural engineer
Lo be compatible with the site soil conditíons '
The naturaf soíl malerials exposed in the areas supporting
concreLe slab on grade floors should be kept very moist clurinq
constructíon prior to placemerit of concreLe slab on girade floors '
This is Lo help increase the moísture regime of the potent'ially
expansive soils supporting floor slabs and help reduce the expan-
sion potentiat of the soils. we are available to discuss Lhis
concept with You.
concreLe slab on grad.e floors should be providecl with a positíve
separaLion, such as a slip joint, from all bearing members and
utilíty lines to allow their independent. movements and to help
reducepossibledamagethatcouldbecausedbymovementofsoils
20
T'ambert nnÙ Øggocinteø
CONSULTING ßEOTFCHNICAI FNGINCERS ANO
t¡alcRlaL TrSl¡l¡c
G09033c8
supporting inLerior slabs. The f loor slab should, be consL:n:ef.eri asa floating stab. All water and sewer pipe lines should be isolat.ed.
f'c-rrrL Lhe slab. Any equipment placed on the floatingr floor slabshould be const.ructed with flexible joint,s to accommodate futuremovement, of the floor slab with respecl to the struct,ure. wesug-gest partitions constructed. on Lhe concrete slab on g,rade floorsbe provicled with a void space above or below the partitions torelieve st,resses induced by elevation changes in the floor slab.
Floor slabs should noL extend over foundat.ions or foundationmembers. Floor slabs which extend over foundations or foundation
members will likely experience post const.ruct.ion movement as aresult of foundalion movements. We are available t.o discuss t.hiswich you.
The concrete slabs should be scored or jointed to help define thelocations of any cracking. we recommend that. joint spacing bedesigned as out]ined in ACr 224R. fn addiLion joinLs should bescored in t.he floors a distance of about three (3) feeL from, andparal1e1 to, the wal1s.
It should be not,ed that when curing' fresh concrete experiencesshrinkage' This shrinkage almost. always results in some cracks inthe finishecl concrete. The actual shrinkage d.epend.s on the config-uration and strengrLh of the concrete and placing and finishingtechniques. The recommended joints d.iscussed above are inLended tohelp define the locatíon of the cracks but. should not beinterpretecl as a solution to shrinkage cracks. The owner musLunderst.and that concrete flaLwork witl contain shrinkage cracksafter curing and that all of the shrínkage cracks may not belocaLed in control joints. Some crackingr at random locations mayoccur.
rf moisture migration t.hrough Lhe concreLe slab on gracle floorswill adversely influence the performance of t.he floor or floor
coverj-ngs we suçÍgest t.hat a moisture barrier may be installed
beneaLh the floor slab to help discourage capillary and vapormoisture rise through the floor slab. The moisLure barríer mayconsist of a heawy plastic membrane, six (6) mil or grreater,protecled on t.he top and bottom by clean sand. The clean sand willhelp to protect the plastic from puncLure. The layer of clean sandon the top of the plastic membrane will help Lhe overlying concreleslab cure properly. According to Lhe American ConcreLe Institute,proper curing requires at least three (3) Lo six (6) inches ofclean sand beLween t.he plastic membrane and the bottom of the
Lsmbeut snù Elgøoc{eteg
2L
CONSULTI}IG GEOIECHNICAL ENGIN€€RS ANO
i{AÏÊRtAL TESTINC
c09033cE
concrete. The plastic membrane should be lapped and taped or glued
and protected from punctures during construction'
The Port.land CemenL AssociaLion suggesLs that welded wj-re rein-
forcing mesh is not necessary in concrete slab on grade floors when
properly jointed. It is our opinion that. welded wire mesh may help
improve the int.egrity of the slab on grade floors. We suggest Lhat.
concrete slab on grade floors should be reinforced, for geolechni-
ca1 purposes, with at least 6 x 6 - w2.9 x W2.9 (6 x 6 - 6 x 6)
welded wire mesh positioned midway in the slab. The sLructr.tral
engineer shoul-d" be contacted for structural design of floor slabs.
B. O LEACH FTELD CONSIDERAT]ONS
PercolaLion tesLs were conclucted in three (3) t,est borings
located within the proposed leach field area. The percolation
tesLs \^/ere cond"ucLed to help idenLify the g:eneral percolaLion rate
of the siLe soil materials. The logs of the soil- materials
encountered in the profile test boring is presented on Figure A7 in
Appendix A. The results of the percolation tests are presented in
Appendix A and indicate a percolation rate ranging from twenty-
eight (28) to t.hírty-six (36) minutes per inch'
Groundwater was not encountered Lo the depths explored within the
percolation profile borinq, approximately nj-ne (9) feeL.
fnformalion provided in "Guidelines on Individual Sewage Disposal
Systems" by Lhe Colorado Department of Health inclicates Lhat. a
percolation rate between 5 and 60 minut.es per inch is acceptable
for sLandard leach field disposal systems. If the percolation rate
is less Lhan 5 minul-es per inch or qreater than 60 minuLes per inch
or if free giround water is less than four (4) feet. below the boLt,om
of the proposed leach field or if formational material is less than
four (4) feet. below the bottom of the leach field Lhen the leach
f ield" should be designed by a regiistered engi-neer. We are
available to discuss the percol-ation test resulLs wiLh you.
9.0 COMPACTED STRUCTURAL FÏLL
Material characteristics desirable for compacted sLructural- f:11
are cliscussed in Appendix D. Areas that are over excavaLed cr
sliqrhtly below grrade should be backf illed to gracle with properl¡'
compacted structural filt or concrete, not loose fill ma¡eriai' I:
l,srTrbert snù Høgnústeß
22
CONSI¡I TING GEOTECHNICAL ENGINÊEÂS AND
I¡ATERIAL fE6TII¡G
c09033cE
backfilled wiLh other than compacLed strucLural fitrconcrete there will be significant post constructionproportional- to the amount of loose material.
material or
settlement
Because of the swell pot.ential of t.he on sit.e soils, it is ouropinion that the on site soils are less desirable for use as
compacted st,ructural fifl than an imported non-expansive granular
material as discussed in Appendix D. we anticipaLe Lhat. it may notbe cost effective to import non-expansive granular st.ruct.ural fitlmaLerial and t,hat the owner may prefer to use on site material- for
compacted st.ruct.ural f il1.
rf the on site soil materials are used as compacLed structuralfirl Lhe soí1s should be moisture cond.itioned to about two (z) t,ofour (4) percent wet. of oplimum moist.ure content and. compacted toat least ninety (90) percent but not more than ninety-fíve (95)percent of the maximum dry densiLy as defined by ASTM Dl-557,
modif iecl moisture-density relat.ionship (proctor) test. The soil
maLeríals should be placed in thin lifts about six (6) inches in
compactecl Lhickness and compacted with a kneading type compactor
such as a sheepsfooL t]æe roller. The on site soils may be veryclifficult t.o appropriately compact. Reconditioning and using theonsile soils for compacted struct.ural fill material may be more
costly than using an imporLed granular non-expansive material. Weare available to discuss this with you.
All areas to receive compacted st-ructural fill should be properly
prepared prior to filr placement.. The preparaLion should inctude
removal of all- organj-c or deleterious material. The areas toreceive fill maLerial should be compact,ed. after the organic delete-rious material has been removed prior t.o placinq the fitl material.
The area may need t.o be moist.ure conditioned for compaction. Any
areas of sofL, yieldÍng, or low clensity soil, evidenced during the
excavaLion compact.ion operation should be removed. The area
excavated Lo receive fill shou]cl be moisture conditioned to wet of
opt.imum moisLure cont.ent as part of the preparation to receive
filI. Fitl should be moisture conditioned, placed in thin lifts
not exceeding six (6) inches in compacted thickness and. compactedto at least ninety (90) percent of maximum dry density as definecl
by ASTM D1557, modif ied moj-sture content-dry density (proct.or)
test.
After placemenL of the structural fill Lhe surface should noL be
allowed to dry prior Lo placing concrete or addiLional fill materi-
al. This may be achieved by periodícally moistening Lhe surface of
Lsûnbcrt snù FLggasíetos
I
:i
¿J
COHSULTIIIG GÉOTÉCHNICAL ÉNGINEERS ANO
MATERIAL IESTING
c09033c8
the compacted sLructural fill as needed to prevent drying of the
structura] fill. We are available Lo discuss this wit.h you.
The soil materials exposed in t.he bottom of the excavalíon may be
moist. an¿ may become yielding under construction t,raffic during
construclion. It. may be necessary to use techniques for placement
of fill materials or foundation concrete which limit construction
traffic in the very moist soil materials. If yíelding should occur
during const,ruction it may be necessary to consLrucL a subqrade
stabilization fill btanket or similar to provide construcLion
traffic access. We are available to discuss this with you.
We recommend that the geot.echnical engineer or his
be presenL during the excavaLion compaction and fill
operalions Lo observe and Lest Llie mal-erial.
representat,ive
placement
10. O LATERAL EARTH PRESSURES
Laterally loaded walls supporting soil will act as retaining
walls and should be designed as such. Watls that are designed to
cleflecL and mobíl-Lze Lhe internal soil sLrength should be designed
for active earth pressures. Walls that- are resLrained so that they
are not able to deflect t.o mobilize inlernal soil st.rength should
be designed for aL-rest earth pressures. The values for the
l-ateral eart.h pressures will depend. on the type of soíl retained b1z
the wal-1, backfill configuration and construction technique. If
the backfill is not, compacted the laLeral earth pressures wíll be
very clif ferenL from Lhose noLed below'
Lateral eart.h pressure (L. E. P. ) values are presented belo',v
Level Backfill
with on-site soils
(nounds oer cu]:íc fo L Ðer foo[ oi clepth)
Active L
At-rest
Pas s ive
The soil samples tested have measured swe1l pressure of abouL 500
pounds per square foot. and the actual swell pressure of the
backf i11 mat,erial could be gireater. Our experíence has sho-."n that
the actual swell pressure may be much higher' If the retai:recl
soils should become moistened af ter const.rucLion Lhe soil rnal' swell
against retaining wal1s. The watls should be designed t.o resist
T"srflbert snù Øggocisteg
PE 50
65
")? rì
L.E.P
L.E.P
24
CONSI¡I.ÍING GEOTECHNIçAL ENGI¡¡E€RS ANO
MATERIAL TESTING
G09033cE
the swell pressure of the soil materials if these are used. as parLof t.he backfill within t.he zone of infruence. Tkre zone of
i n f=l r,rencê côllcËpl_ is preeentod on Figure g .
The above lat.eral- eart.h pressures may be reduced by overexcavat-ing Lhe wall backfíll area beyond the zone of influence and back-filting with crushed rock type material. The zone of influence
concept is present.ed on Figure 5.
The lateral earth pressure desígn paramelers may chanqe sígnifi-cantly if Lhe area near the wall is roaded or surcharged or issloped. If any of these conclítions occur we should be contacted foraddiLional design parameters tailored to the specific site and
sLrucL.ure conditions .
suggrested lateral earth pressure (L.E.p. ) values if Lhe backf i11is overexcavaLed beyond Lhe eone of influence and backfilled withcrushed rock are presented below.
Level Backfill
with crushed rock material-
lnorrndq na r-r rkl icf oo1. ner fo o f clenlh )n{-
Active L.E. P.
At-resL L.E. P
30
50
rf t,he area behind a wall retaining soil material is sroped we
should be contact.ed to provide lateral earth pressure design valuestailored for the site specific slopecl condiLions.
Resistant forces used in t.he design of the walls wirl depend onthe type of soil that tends to resisL movemenL. we suggest that.you consicler a coefficienl of friction of 0.20 for the on siLe
soí1.
The lat.eral eart,h pressLlre values provided. above, for clesigrnpurposes, should be Lreated as equivalent fluid pressures. Thelateral eart.h pressures provided above are for level well drained
b,ackfill and do not include surcharge loads or additional loading
as a resufL of compaction of the backÊill. Unlevef or non-horizon-
tal backfill either in front of or behind warls retaining soils
will signif icantly inf luence t.he laterar eart.h pressure values.
Care shoul-d be taken during consLruction to prevent construction
and backfill techniques from overstressing the wa1ls retaining
soils. Backfill should be placed in t.hin lifts and compacLed, as
lsmbert snù Hgøseisted
I
25
CONSULfING GEOIÊCHNICAL €NGINEÊRS AND
I.IATERIAL IÊST¡NG
c0 9 03 3GE
discr:sserJ in this report to realize the lateral earth pressure
vafues.
Walls retaining soil shoutd. be designed and conslructed so that
hydrostatic pressure will not accumulate or will not affect the
integrity of the walls. Drainage plans should ínclude a subdrain
behind the wall at the bot.t.om of the backfill Lo províde positive
drainaçre. Exterior reLaining walls should be provided with perime-
ter drain or weep holes to help provide an ouLlet' for collecLed
v/aLer behind t.he wall. The ground surface adjacent to the wall
should be sloped to permit rapid draínagre of rain. snow melt and
irrigat.ion waLer a\^/ay f rom the wal1 backf í11. Sprinkler systems
should nct be installed. directfy adjacenL to retaining or basemenL
wa]1s.
I-1.0 DRAIN SYSTEM
A drain sysLem should be provided arouncl buitdingi spaces below
t.he finished grade and behind any walls retaining soil. The drain
systems are to help red.uce the pot.ential for hydrosLatic pressure
to clevelop behind retaining walls. A sketch of the drain system is
shown on Fiqure 6.
Subdrains should consisL of a Lhree (3) or four (4) inch cliameter
perforated rigid pipe surrounded by a fitter. The filter should
consisL of a fílter fabríc or a graded material such as washed
concrete sand or pea gravel. lf sand or giravel is chosen the pipe
shoulcl be placed in the micldle of about four (4) cubic feet of
âggregiaEe per linear f ooL of pipe. The drain syslem shoulcl be
slòped to positive gravity outlets. ff Lhe drains are daylighLed
the drains should" be provided wit.h all weather out.lets and Lhe
outlets should be maintained to prevent them from beingr plugged or
frozen. We do not recorffnend that. the drains be dischargred to dry
well type strucLures. Dry well slrucLures may tend to fail if Lhe
surrounding soil material becomes v/etLed and swells or if the
ground water rises to a elevaLion of or above the discharge eleva-
tion in t.he dry well. We should be callecl to observe the soil
exposed in the excavations and to verífy the cletails of the drain
sysLem.
l'smbeü snÙ Øggseínted
j
I
26
COÑSIII TING GEOfECHNIçAL ÉNCIN€ÊRS ANÛ
¡¡ATER¡/\L IESf¡NG
c0 9 0l 3GE
12. O BACKFILL
R¿r-:k I i I I ä.reas and utí1it,1. ¡t"nch baclctítl should be constructedsuch Lhat the backfill will not seLLle after completion of con-struction, and t.hat the backfill is relaLively impervious for t.heupper few feet. The backfill material should be free of trash andother deleterious material. It should be moisture condit.ioned and
compact.ed to at. least níneLy (90) percent relative compaction usinga modífied moisLure contenL-dry density (proctor) relationship Lest
(ASTM D1557 ) . only enough u/ater should be added. to the backfillmaterial- to arlow proper compaction. Do noL pond, puddle, float. orjet backfill soil materials.
fmproperly placed backfill maLerial will all-ow waLer migration
more easily Lhan properly recompacted fill. rmproperly compactedfill is likely to settle, creating a 1ow surface area which further
enhances water accumulaLion and subsequenL migration to the found.a*tion soils.
rmproperly placed backfill will al-low water to migrat.e along theut.ility t.rench or backfill areas to gain access to the subgrradesupport soil-s with subsequent. mobilization of Lhe swell or settle-
ment mechanism resulting in movement of Lhe supported st.ructure.l{oist,ure migration could al-so result in the inconvenience of freebiater in Lhe crawl space.
Backfill placement t.echníques shoutd noL jeopardize the int.egrityof existing structural members. We reconimend recently constructedconcrete structural members be appropriately cured prior t.o adjacenL
backfi llinq .
13.0 SURFACE DRATNAGE
The foundation soil materials should be prevented from becoming¡wetted afLer construction. Post construction wetting of the soil
support soil mat.erials can ínitíate swel'l poLential or settlement
¡:otential as well- as decrease the bearing capacity of the supportsoil materials . ProLecting the foundaLion from wet.Ling can be aiclecl
by providing positive and rapid drainage of surface water away from
t.he st.ructure.
The final grade of the ground surface adjacent to the strucLure
should have a well- defined slope av¿ay from the foundation walls on
all sides. The ability to establish proper site surface drainaqe
Lsilrhert euù $øgocíeteg
I
I
ì
a.-l
CONSULTIHG G€OTECHNICAL ENGINËÊRS ANO
I¡tATÉRIAL TEST¡NG
c09033G8
a\day from the st.ruclure foundation sysLem may be influenced by t'he
existinq Lopography, existing structure elevalions and the grades
and elevations of Lhe ground surface adjacenL to the proposed
sLructure. We sug'gest, where possible a minimum fall of the surface
grade away from the sLructure be t.hat which will accommodate other
project- grading" constraints and provide rapid drainaqe of surface
water av/ay from the structure. If there are no other project
constraints we sugigesL a fa1l of abouf: one (1) foot in the first Len
(10) feet away from the sLructure foundation. Appropríate surface
drainage should be maintained for the life of the project- Future
landscaping plans should. j-nclude care and attention to the potential
infl-uence on t.he long term performance of the foundalion and/or
crawl space if improper surface drainage is not maintained'
Roof runoff should be collect.ed in appropriate roof drainage
collection devices, such as eve gutters or similar, and directed Lo
discharg'e in appropriate roof drainage sysLems. Roof runoff should
not be allowed to fall on or near foundations, backfill areas/
flatwork, paved areas or other sLrucLural members. Downspouts and
faucels should discharge onLo splash blocks t.hat extend beyond the
limits of Ehe backfilf areas. Splash blocks should be sloped away
from the foundation walls. Snow storage areas should noL be located
next to the struc¡ure. Proper surf ace drainage should T:e tmirrLained
from the onset of construcLion Lhrough the proposed project life'
If significant. water concenlration and velocity occurs err:sir:n may
occur. Erosion proLection may be considered to reduce soil erosíon
potential. A lanclscape specialist or civil engineer should be
consufted for surface drainage desigin, erosion protecLion and
landscaping cons iderations .
14. O LANDSCAPE TRR]GATION
An irrigaLion system should. not be installed next Lo foundations,
concrete fl-atwork or paved areas. If an irrigation system is in-
stalled, Lhe system should be placed so t.hat. the irrigation waLer
does not fall or flow near foundations, flat.work or pavements . The
amounl of irrígat.ion water should be controlled'
We recommend. t.hat wherever possible xeriscaping concepLs be used'
Generally, the xeriscape includes planning and design concepts r';hich
will reduce irrigation waLer. The reason we suggest xeriscape
concepls for 1andscapinq is because the reduced lanclscape water will
decrease the pot.ential for waLer Lo influence the long Lerm
2B
lumbeut snb ØsgotíEtÊd
I
CONSULlINß GFNIFCHNICAL ENGINÊERS ANO
MATENIAL TESTING
G09033c8
performance of t,he sLrucL,ure foundations and flaLwork. Manypublications are available which discuss xeriscape. Colorado St.ateUniversity Cooperative Extension has several useful publications and
mosL landscape architects are familiar with the subject. Mon¡roseBotanical Society has a Botanical Gard.en, 1800 pavilion Drive, sout.hof Niagara Drive, Mont,rose, colorado, that. has a very good exhibitwíth examples and information regardingi successful xeriscape
concepts.
Due to the expansive nature of the soils tested we suggest that
t.he owner consíder landscaping, with only native vegetation whichrequires only natural precipitation to survive. AcldiLional irrigra*tion waLer will greatly increase t.he likelihood of damage to the
sLructure as a result of volume changes of the material supporLing
t.he structure.
Impervious qeoLextile mat,erial may be incorporatedproject landscape clesign to reduce Lhe potent,ial for
water Lo influence the foundation soils.
into the
irrigat ion
].5. O SOIL CORROS]VITY TO CONCRETE
Chemical tests rvere performed on a sample of soil obtained during
Lhe field study. The soíl sample was t.ested for pH, waler soluble
sultates, ancl total dissoLved salt.s. The results are presented" in
Äppcndix B. The test resulls indicate a water solul:le sulfate
content of 115 parts per million. Based on Lhe American ConcreLernstituLe (ACI) information, a waLer soluble sulfate content of l-1-5parts per million indicates negligible exposure to sulfate altack onconcrete. We suggest sulfate resislant. cement be used in concrete
which will be in conLact. with Lhe on site soils. American Concrete
InstituLe recofitmendat.ions for sulfate resistant cement, based on the
water soluble sulfate contenL should be used. The American Concrete
Institute (aCr¡ does not slate a recoñtmended maxímum water/cement
ratio for concrete where negligible exposure will occur, however,
ACf does recornmend a maximum water/cement ratio of 0,50 for concrete
where moderat,e exposure to sulfate attack will occur.
]-6. O RADON CONSIDERATIONS
Our experience
Colorado procl.uce
inclicates that many
small quantities of
of Lhe soils in wesLern
radon gias. Radon gas may tend
{embert snù Øggstigte$
?o
CONSULTING GË.OTECHNICAL ENGINEERS ANO
MATERIAL TESIING
c09033cE
Lo colfect in closed poorly ventj l.ated structures. Radon consider-
alions are presented in Appendix D.
1-1 . O POST DESIGN CONSTDERATTONS
The project g:eotechnical engineer should be consulted during
construction of the project to observe siLe conditíons and open
excavations during construction and to provide maLerials Lesting of
soil and concrete
This subsurface soil and foundation condit.ion study is ̡ased on
limited sampling; therefore, it is necessary to assume that the
subsurface conditions do not. vary g"reatly from Lhose encountered in
the field study. Our experience has shown that. significanb varia-
t.íons are likely t-o exist and can become apparent only during
additional on site excavation. For this reason, and because of our
familiarity wit.h the projecL, Lambert and Associates should be
retained to observe foundation excavations prior to foundation
constructíon, to observe the geotechnícal engineering aspects of the
construcLion ancl to be available in the event any unusual or
unexpected condit.ions are encounterecl. The cost of the geotechnical
engineering observations and maLeríal Lesting during construction or
aclditionat engineering consultatíon is not íncluded in the fee for
this report. We recofiìmend that your consLruct.ion budget ínclude
site visits early during' construct.ion scheclule for the project
geotechnical engirreer Lo observe foundaLion excavations ancl for
aclditional site visits to test compacted soil.
We recommend that the observaLion and mat.erial t.esting services
d"urinq consLruction be retained by the owner or the owner's engineer
or architecL, not the contractor, to maintain third party
credibility. We are experienced and available Lo provide material
t.esting services. We have included a copy of a report prepared by
Van Gilder Insurance which discusses Lest.ing services during con-
sLruction. It is our opiníon that Lhe owner, architect and engineer
be familiar with the informaLion. If you have any questions
regarding this concept please contacl us '
We suggest that your construct.ion plans and schedule include
provísions for geotechnical engineering observatíons and material
tesLíng during construction and your budget reflect t'hese provi-
sions.
Lsmhert nnù Øøgsritttts
30
CONSULTING GEOTECHÑICAL ÉNGIN6€RS ÂNO
MAI hRIAL TESlIHG
c0903lcE
It is difficult Lo predicL if unexpected subsurface conditionswill be encountered during construction. Since such condiLíons maybe fr:rund, we suggest. that Lhe owner and the contractor make provi-sions in Lheir budget and const,ruction schedule to accommodate
unexpecLed subsurface conditions .
L1.L Structural Filt euality
It is our understanding that, the proposed development may include
compacted structural fill. The quality of compacLed. sLructural flllwirl depend on the Lype of mat.erial used as st.ructural fill, filllift t.hickness, fill moisture condition and compactive effort. usedduring construct.ion of the structural fí1I. Engineering observationand Lesting of structural fill is essential as an aid t.o safeguardthe quality and performance of the structural fill.
Filf maLerials placed on sloped areas require special placement
techniques Lhat key the fill materials unLo the underlyingr supportmaterials. These t.echniques include a Loe key at the toe contact of
Lhe slope filr and benching the fill/natural contact up the slopej-nto the competent nat,ural material-. The placing technique will
al-so inclucle subd.rains at several l-ocaLions Lo inLercept subsurfacev/ater and route it away from the fill materials. We are available
t.o discuss these Lechniques with you and your earthwork contractor.
TesLing of the st.ructural fill normally includ.es tesLs t.o d"eLer-
mine the grain size distribution, swcll potential and moist.ure-
clensiLy relationship of t.he fill material to verify the materialsuitabilicy for use as structural fill. As the material is placed
the in-place moisLure cont.ent. and clry densit,y are tesLed to indicatethe relative compaction of the placed structural f ilf . Ilrle recommend"
t.haL your budget. include provisions for observatj-on and testing ofstructural fill during construction.
Testing of the compacted fitl material should include tests of themoisture cont,ent. and density of the fill mat,erial placed and
compacted prior t,o placement of additional fill mat,erial. We
sugqest that a reasonable number of densíty tests of Lhe fillmaterial can best be determined on a site, materíal and construcLion
basis although as a guid.eline we sugigest one tesL per about each 300to 500 square feet, of each lift of fill mat.erial. Utility trench
backfill may need to be tested about. every 100 linear feet of lift
of backfill.
Lsmbert snù flggocietgd
31
CONSTJLTING GEOTECHNICAL ENGINE€RS ANO
'TAIÊRIAL
TÊSTING
c09033GE
17.2 Concrete Qualitv
ït is our und.erstandingi current pl-ans include reínforced struc-
tural concreLe for foundaLions and walls and may include concrete
slabs on grade and. pavement. To insure concreLe members perform as
intended, the structural engineer should be consulted and shou]d
address facLors such as design loadings, anticipated mowement and
deformations.
The quality of concrete ís influenced by proport.ioning of the
concreLe mix, placement, consolidation and curing. Desirable
qualit.ies of cåncrete include compressive sLrengLh, waLer tightness
and resisLance to weathering. Enqíneering observations and testing
of concreLe during' construction is essential- as an aíd to safeguard
t.he quality of the completed concrete '
Testing of the concrete is normalty performed to determine com-
pressive strength, entrainecl air contenL, slump and temperalure' we
recofttmencl that your buclget íncluc1e provisions fOr testing of
concrete during construction. We suglgest LhaL a reasonable frequency
of concreLe tests can best be deLermined on a site, materials and
const'rr.].ctíonspecificbasisalthroughasaguidelineAmerican
concrete InsLitute, AcT, suggests Ône Lesl' per about each fifty (50)
cubic yards or portion thereof per day of concreLe maLerial placed'
].8.0 LTMITATIONS
It. is Lhe owner'S and the oln/rter's representaLíves' responsibility
Lo reacl Lhis reporL and become famitiar wit.h the recommendations and
sugqesLiorr= pr"=ented. we should. be contacted íf any guestions
arise concerning the geotechnical engineering aspects of this
project as a result of t.he information presenled in thís report'
ThescoSfeofservicesforthisstud.ydoesnoLincludeeither
=på"iri"rirv or by implication any environmental or biological
as mold, fungi, bacteria, etc') Assessment of the site or
iclent.ificaLion or prevention of pollutants, hazardous materials
conclitions. If thã owner is concerned abouL the potenLial f'or
contamination or pollution, oLher stud-ies should be performed'
The recommendations outlined above are based on our understanding
of the current.ly proposed construction. Inle are available to discuss
the details of ãLr, r""ommendations with you ancl revise them where
necessary.Thisgieotechnicalengineeringreportisbasedonthe
a')JA
Lsmhert nnb ßggocínteg
( such
or
such
CONSULTING GEOfECHNICAL EHGINÊERS ANO
MATERIAL fESTING
c09033c8
proposed site developmenL and scope of ser\¡ices as provideci lr: us byMr' Paul sorensen, p.E. CGRS, on the type of construction planned,existing sile conditions at the time of the field stud.y, arrd" on ourfindings. should the planned, proposed use of the site be altered,Lambert and Associates must be contacted, since any such changes maymake our suggtestions and recommendations inappropriat.e. This r"porlshould be used. oNLy for Lhe planned development for which thisreport was tailored and prepared, and ONLy to meet. informat.ion need.sof the owner and the o\¡iirrer ' s represent.atives. In the event that anychanges in the future design or location of the buitding areplanned, the conclusions and. recommendations contained in thisreport shal1 not be considered valid unless the changes are reviewed.and conclttsions of Lhis report are modified or verified in writing.rL is recommended t.hat, the geot.echnical engineer be provided Lheopportunity for a general review of Lhe final projecL desígn and.specificat.ions in order that. t.he earthwork and foundaLion
recolnmendations may be properly int,erpreLed. and implemenLed in thedesiqn and specif ícat,ions.
This report does not. provide eart.hwork specífications. we canprorride guidelines for your use in preparing project specificearthwork specificat.ions. Please contact. us if you neecl these foryour projecL.
This reporL presents boLh suggiestions and. recommendat,ions. Thesuggestions are presenLed so that t.he owner and L,he owner'srellrcscntat.ives may compal:e t.he cost. Lo Lhe poLent-ial risk orbenefit for Lhe sugg,esLed procedures.
This report contains suggestions and. recommendations which areintended Lo work in concert with recommendaLions provided by theother design t,eam members to provide somewhaL predictable foundationperformance. ff any of L,he recommendations are not included in Lhedesign and construction of the projecL iL may result inunpredictable foundation performance or performance different thananticípated. We recommend t.hat we be requested t.o provide geoLechr
nica] engineering observation and maLeriars tesLing during theconstruction phase of Lhe project as discussecl in t.his reporL. Thepurpose for on sit.e observation and LesLing by us duringi construc-tion is Lo help provide continuity of service from Lhe planning ofthe project through Lhe construction of the projecL. This servicewill also allov/ us to revise our recommerLdations if conditions occuror are discovered during- construcLion Lhat were not evid.enced during
Lhe init.ial st.udy. I¡7e suggest thaL the owner and the contract,or
l'smbert anù €[ggocictes
33
CO}ISULTING GEOIECHNICAL ENGIHEÊRS AND
MATERIAL IÉSTING
c09 03 3GE
make provisions in
ule to accornmodaLe
DanieI LamberL, P.E
Geot cal Engineer
their consLruct.ion bud.get. and construction sched-
unexpecLed subsurface corrditions'
We represent that our services were performed within the limits
prescribed by you and with the usual Ehoroughness and compeLence of
Lh" "rrrrenL acãepted practice of Lhe geotechnical engíneering pro-
fession in Lhe area. No vi/arranty or representation either expressed
or implied is included or int,ended ín this reporL or our contract.
we are available to discuss our findíngs with you. rf you have any
quesLions please contact us. The supportíng data for this report is
included in the accompanying figures and appendices.
This reporL is a product of Lambert and Associates ' Excerpts from
Lhis report, used in oLher documenLs may not convey the intent or
proper concept,s when taken out of conLext, or they may be
misinterpreted or used incorrectly. Reproduction, in part or
whole, of Lhis document wíthou| prior written consent of Lambert and
Associates is Prohibited.
This report ancl information presented can be used only for Lhis
site, for Lhis proposed. development, and only for the client. for
whom our work was performed. Any other circurnstances are not'
appropriate applications of this information. Other developmenl
plans wilL require project specific review by us'
We have enclosed a copy of a brief discussion al¡out geotechnícal
engineerinq reports published. by AssocíaLion of Soil and Foundation
Engineers for Your reference '
Please call when
are reguireci.
further consultation or observations and tests
If you have any questíons concerning this reporl or if we may be
of further assistance. please conLact us'
Respectfulty submit ted;
LAMBERT AND ASSOCIA Reviewed
Denni
Geotechníca1 Engineer
f.smbeff nnÙ ßlggotíntefi
TL, P. E
DRL/nr
34
CONSIII fIÑG 6EOTEÇHNICAL ËNGINÉÉRS ANû
IIATERIAL IÉSTING
::,::;:
zÌ
r
na
Frr1gr. ,,
h,lft .',
O tnaicates approximate projeci location
N
This map is intended to present geotechnical engineering data only
PROJECT VICINITY MAP
NO SCALE
?
l0l,annbcrt flnù gÍficirtrr
rUþtrl|lrv)/-oþUoFJ(fzgâ1FfJ)P-L!FJ(_)(nztnL0-)>,oo>- cü!(d!'r302 00o0)äEc'&)Od'j: c)tr(Ú:1 L)Çí Irrc)-ÕoE80(J=EÃ)oöLkÈo.9oûcú'O>c)r'È(-) ()0)É.n u)ØFızano(úOoÞoko-o(t)oo()t<d)Í).IJ(dÊxotqÊ.e.6Ja/)0,H()o__rØooÞoko.orJ7c)0-)F.xokÊØ0_.,(Je', l,:t.ll --.',''-".*''I *- ,-r --.ij-lao>. -l^ rts__.l ohñ ilvC\¡IIIIÁtrrf+.cE\-t¿CTËðËE'Ë6+aù¡ù¡lllE6rrl
c)Õz,C¡ra.D{crVr2(m{tl-o.,|]Tlo()fz.ç)ttc@l)p(Jm+ærn{3mz,IMaximum Depth ofStream ScourHáxîmum Depth ófStream ScourCompactAbutment- Còmpacted-Backf i-Abutme- Backf intr-AA--ùl-Iral FilAcomÞactedlilatiJral SoilsICompacNOT TO SCALENatural Soi l sB = Foot ing t/idth,4 = Compacted Structura I F¡ I I Th icknessand Fil I W¡dth Beyond Footín9.Ed9ê,.: ,,..D = Footing Embedment Betorr, toùre;t',¡ãJacd¡Grade :, . ¡..j,FIÞ3r*DãgnËÇrIfrDË,I1 .""úr;:¿ú
Con c re te
Fi n i shed
Floor SIab or
lnterior
Grade
Exisling Exterior GracJe
Foundation \{all
Concrete Floor SÌab or
Finished lnterior Grade
l'1ini mum
[mbedmen t
f1i n mum
trnbed::en t
EIlBEDIlTNT COI.ICEPT
oundation'l/all
þ1al I Backfi I I
't
I I
L.
Foot i ng
Foot i ng
Lnmbart flnù f[.sgottstss
Foundat ion,/Reta in i ng' Wall
Zone of I nf I uence
Concrete s I ab:on-grador finished elevation
tr 60
BACKFILL ZONE OF INFLUENCT CONCEPT
Foot i ng
,
tl,smt?ü ffiù gÍrocl¡trr
,
:
iI
Low
Foun da t i on/ Re ta i n i ncl
l¿Ja I I
I
I
I
I
Dermeabilitv
BackFi I I
1,1âteriai
l Comnacted
Backf i I I
Dra inage
B I anket
Concrete
S i ab-on-Grade I Geo techn i ca I
Fìlter Fabric
l- ree Dra i nrng'
Filter rialerial
I Perforaled Drain
Pipe SIoned to
0u t let
Hoislure ßarrier
Tlr is sketch is to shcu¡ concent only '
The text of our reDort shouid be
consul ted for addi tional information'
CONCEPT I ONAL SKETCH OT FOUNDAT I ON DRA I II SYSTEM
GrG
il
fl,e¡nhsrt nnÙ ltwdffet
nÇilder NEWsLETTER
lnsurance Corporation
Brokers since 1905 . 7@ Broadway, suite 1035, Denver, co g0200 " 303/gs7-g500
THE PROFESSIONAL LIABILIW PERSPECTIVE
Vol" 8, No" I @yrigt¡t 19SB Ar¡gust f98B
TIHO TIIRES TTIE TESTTNG LA.BORå.TORY?
It is one of those relatively small details inthe overall seheme of things. Independenttesting may be required by local building
!o9-9r: or it may be insisted upon by lenders-.
Additional testing can usually be oidered bythe design team during construction. What-ever the souree of the requirement, malyowners perceive it to be an unnecessslvburden-a¡ additional cost imposed principal-ly for someone elsets benefii.
What does this have to do with you? you
may be the only one in a position to in-fluenee the use of testing and inspection
serviees so they beeome more, rather than
less likely to contribute to a suceessful out-eome. There seems to be an a_lmost irresist-ible incünation on the part of some ownersto eest aside their potential value to theproject in favor of tne administnative andfinancial convenience of plaeing, responsibili-ty for their delivery into the hands of thegenerai contractor.
Resist this inelination where you ean. It isnot in vour eüent's best interests, and it is
certainly- not in yours. There are impoctant
issues o-f quality and even more important
issue5 of lif e saf ety at stake. In the complexenvironment of today's eonstruction arena,it makes very little jense for either of yoú
!9 fiu. up your contnol of quality control.Yet it happens aitogether too often.
Whatts Behfuld this Missdventr¡re?
the idea that millions eould be saved byeliminating the jobs of Federal workers en_gaged in construction inspection. The pro_eurement model used to support this strokeof genius was the manufactuiing segment ofthe eeonomy, where producers ıf gıoOs pur-
chased by the Government had bee-n requìredfor ¡rears to conduct their own quality assur-ence pnograms. The result w&s a trendy
new eoneept in Federal eonst¡uetion knowñas Contraetor euality Control (CeC).
It was L dumb idea. Costs were simplyshifted from the Federal payrolt to capiiai
irnpnovement budgets. Government eontrae-tors, selected on the basis of the lowest bid,were handed resourees to assure the quatityof thei¡ own performance. Some cíiO so;
many did not. AII found themselves eaughiup in an impossible eonfliet between the
demands of time and eost, on one hand, andthe dictates of quality, oR the other.
CQC was opposed by the Associated GeneralContractors of America, by independent
testing laboratories, by the design profes-
sions, and by those charged with fnont-Iineresponsibility for quatity control in theFederal Agencies. Eventualiv. even the
General Accounting Office camé'to the con-
clusion that it ought to be abandoned, But,
once set in motion and fueled by the per-
vasive infiuence of the Federal Government,the idea spread-first to state and local
governments; finaUy, to the private seetor.
i
i:
j
':
The culprit seems to be the Federal Govern- Why would the private seetor embrace suchment. In the 1960's, someone eame up with an ill-conceived notion? Because so ms.ny
Binder Key: Professional practiees
VoL I, No.8
owners view testing and inspection as an
undertaking which simply duplicates some-
thing they are entitled to in sny event.
They are confident they will be prctected
by eontraet doeuments which eover every
detail and eontingency. They look to local
building inspectors to assure eompliance with
codes. And they fully expect the design
team to fulfill its obligation to safeguard
the quality of the work.
A Fox in the Henhouse
If testing is pereeived as little more than
an 'unneeessary, but unavoidable expenset
why not make the general eontraetor respon-
sible for controlling the cost? It may pro-
duce a savings, and it certainly eliminates
an adminstrative headache. If eontractual
obligations dealing with the projeet sehedule
and budget can be enforeed, surely those
governing quality can be enforeed, as well.
Possibly so, but who is going to do it?
Some testing eonsultants wÌll not aecept
CQC work. The re&sons they give eome
from firsthand experienee. They include:
1) inadequate to barely adequate seope, 2)
selection based on the lowest bid; 3) non-
negotiable contract teri'ns inappncpriate to
the delivery of a professional serviee;4)
intimidation of inspeetors by field super-
visors; and 5) suppression of low or failing
test results. This ought to be fair warning
to anSr owner.
Keepirg Both Hands on the lYheel
The largest part of the problem, from your
point ol view, is one of artful persuasion.
If you eannot eonvinee your elient of the
value of independent testing and inspeetion,
no one e&n. Yet, if you do not, you are
Iikely to find yourself responsible for an
assuranee of quatity you are in no position
to deliver. How can you keep quatity control
where it belongs and, in the process, prevent
the owner from eompromising his or her
interests in the project as well as yours?
Consider these suggestions:
1. Put the issue on an early agenda. It
needs your attention. Anticipate the ownerts
inclination to avoid dealing with testing and
inspection, and explain its importance to the
sueeess of the project. - fer¡lst, if you ean,until your client agrees to hire the testing
laboratory independently and to establish aiadequate budget to meet the anticipatedcosts. A testing eonsultant hired by the
owner eannot be fired by the generai con-traetor for Brodueing less than favorable
results.
Page 2 1988
2. Tailor the testing rem ents carefullv.
Scissocs and paste can be your veny worst
enemies, Speeify what the job requires,
retain controi of seleetion and hiring, make
certain the eontractorrs responsibilities fornotifieation for seheduling purposes are
elear, and require that copies of all reports
be distributed by the laboratory directly to
you.
3. Insist on a ruction testin eon-
f erenee,ean 8.n esse ment oãTfffie eoordination, Inelude the owner,
the general contraetor, major subeontrac-
tors, the testing consultant, and the design
team. Review your requirements, the pro-
eedures to be fol-lowed, and the responsibili-
ties of eaeh of the parties. Have the testing
consultant prepa.re a eonf erence m emoran-
dum for distribution to all participants.
4, Monitor tests and inspections closely.
Make certain your field répresèntãtive is
present during tests and inspections, so that
defieiencies in proeedures or results can b€
reported and aeted upon quiekly. Scale baek
testing if it becomes elear it is appropiateto do so under the eireurnstances; do not
hesitate to orden additional tests if they are
requi red.
5. Ffq4!yrJ99p_y!-q client informed. With-
out your lælp, he or she is not likely to
understand what the test results mean, nor
will your eetions in response to them make
mueh sense. If additional testing is catled
for, explain why. Rememben, it is en unex-
pected and, possibly, u'rbudgeted additional
eost for whieh you will need to pave the
wey. In this sense, índependent testing and
inspection can serve an important, secondary
purpose. You might view it as a eommunica-
tions resouree. Use it in this way, and Ítjust may yield unexpected dividends,
THË PROFESSIONAL ¡.IABILITY PERSPECTIVE
IMPORTANT INFORMATION
ABOUT YOUR
GEOTECHNICAL ENGINEERING REPORT
More construction problems are caused by site subsur-
face conditions than any other factor. As troublesome as
subsurface problems can be. their frequency and extent
have been lessened considerably in recent years. due in
large measure to programs and publications of ASFE,/
The Association of Engineering Firms Practicing in
the Ceosciences.
The follorving suggestions and observarions are offered
to help you reduce the geotechnical-related delays,
cost-overruns and other costly headaches that can
occur during a conslruction proiect.
A GEOTECHNICAL ENGINEERINC
REPORT IS BASED ON A UNIQUE SET
OF PROJ ECT-SPECI FIC FACTORS
A geotechnical engineering report is based on a subsur-
lace exploration plan designeC to incorporate a unique
set of project-specific factors. Thesc rypically inciude:
the general naiure ol the structure in,,'olved, its size and
configuration: the location of the structure on the site'
ancJ its oricntation; physical concomitants such as
access roads. parking lors. anC underground utilit¡es,
and the level of aciditional risk ivhich the client assumed
by virtue of limitations imposed upon thc explorarory
program. To help avoici costl¡r problems. consult the
geotechnical engineer to derermine horv any factors
which change subsequent io the date of rhe report may-
af fect its recom menclations
Unless your consulting geocechnical engineer indicates
otherwise, ¿iotrr,tcph'cf¡ri¡ al tnqintrriui rrporl siruulc{ rrot
lir.'trS¿r'1:
" When the nature of the proposed structure is
changed. forexample. if an office building will be
erectecl ìnstead ol a parking garage. or if a ref riger-
atecl warehouse lvill be built insteacl of an unre-
frigerated one:
. when the size or conf iguration of the proposecl
structure is alrered.
. rvhen rhe loca¡ion or orientation of the proposed
struc(u rL1 is modi f ied :
' r,vhen there is a change of o',,,'ncrship. or
. for application to an adiacent sire.
CcolcrliI ica f ¡rr,,ir¡¿t'rs c ú n nL)t Ll ( ( c pt rcsporr S ifii ft l y l tlr p rù(]lffi $
n'l\ich ntttl tlev¿l¡p i[ lttc. arc not ct¡tsulter.l after ftrctors corrsid-
ered in lhtir rcporl s rirurlt4: ment lww cftcrrr4rri.
MOST CEOTECHNICAL''FINDINGS"
ARE PROFESSIONAL ESTI MATES
Site exploration identif ies actual subsurface conditions
only at those points where samples are taken. when
they are taken. Data derived through sampling and sub-
sequenl laboratory testing are extrapolated by geo-
technical engineers who then render an opinion about
overall subsurface conditions, their likely reaction to
proposed construction activiry, and appropriate founda-
tion design. Even under oprimal circumstances actual
conditions may difler from those inferred to exist,
because no geotechnical engineer, no matter how
qualified, and no subsurface exploration program, no
matter how comprehensive. can reveal what is hidden by
earth. rock and tìme. The actual interface between mare-
rials may be far more gradual or abrupt than a report
indicates. Actualcondirions in areas not sampled may
differ from predictions. Notliirrg can be done to prevent thi
wnnltipated. bul stcps un þe tttlun to help mininíze theîr
impctcl. For lhis reason. nittsl euperienced owners relaín their
¿lrotcilriicttl ro¡rsull¡rrls tirrouqh lle' ror¡strlctio n slage. to iden-
tify variances. conducr ¿ddirional tesrs which may be
needed. and to re.commend solutions to problems
encounterecl on site.
SUBSURFACE CONDITIONS
CAN CHANCE
Subsurface conclitions rne!,Ðe modified by constantly-
changing natural forces. Because a geotechnical engi-
neering report is based on conditions rvhich existed at
thc. timc of subsurface erploration. couslruct¡(ln decisíous
slro¿rlrT rrol lr.'li¿tsrd orr ti gr'oiiilì;iictrl cnqineerinq rtporlwlnse
art'r¡rruu rriru lii,tut lc¡l ¿1ff¿'¡tc,ï ¡iy {irrr. Speak rvith the geo"
technical consultant to learn il addi¡ionai tests are
aclvisable be[ore construction starts.
Construction operations at oi'ad¡ace;rt to rhc site and
n¡tural evl-nls such as floods. earthqual(es or ground-
r,v¡ter f lucruations ma!' ai:c alfect subsurÍace conditions
ancl. thus. the continuing a¡requåcy- cí a geotechnical
rel)ort. l'hr" geotechnicai engineer should be kept
appriseci c'rl ðrn,.' such eveîis ancl sho'licl be consulted to
determine il ¡clclition¡l tes:s are necessarv
CEOTECH N ICAL SERVICES ARE
PERFORMED FOR SPECIFIC PURPOSES
AND PERSONS
CL.otechni(¿|l enginecrs reports are crep:reci to meet
thL. specif ic needs ol siìecií;; incirvid..l¡ls A report pre-
prrecl for a cc,nsulting ci'. il engineer ira)- nol be ade-
qu:tc- for ô construction contractor. or even some other
consulting civil enginær Unless indicated otherrvise.
this report wes prep¿red expressly for the client involved
anil expressll' for purposes indicateC by the client. Use
b¡- any other persons for an;,' purpose. or by the client
for a different purpose. ma'; result in problems. No iir,li-
r,'irlrral otl¡r lli¡rr llì¿ r:li¡rrl sirori[l rrp¡lrr llris repL'rrt l0r ils
inl*nitd prrrpdsr u'itltt ul frsl ¡,.aftrrrig rll(lr lllr gleoteúrnicul
enlinrcr. Ntr p{rsorr slroul,i ,t¡'¡ly tftis rcporl f0r ctng plttpose
ollicr llrarr llicrt ori4írrrrlly i(rrrl.'rirpl¿rl.'.1 u'¡¡,1rul frrst conl..rrín,J
u'itJì lfc dcolcclìrrii¿tl rrrgirrccr:
der the mistaken impression that simply disclaiming re-
soonsibilitv for the accuracy of subsurface information
ui*rys insúlates them from altendant liability. Providing
the best available information lo contractors helps pre-
vent costly construction problems a¡d the adversarial
attitudes which aggravate them to disproportionate
scale,
READ RESPONSIBILITY
CLAUSES CLOSELY
Because geotechnical engineering.is based extensively
on iudgmãnt and opinion, il is far less exact than other
design disciplines. This situalion has resulted in wholly
unwãrranted claims beìng lodged against geotechnical
consulrants, To help prevenl this problem, geotechnical
engineers have developed model clauses for use in wril-
ten transmittals. These are not exculpatory clauses
designed to foist geotechnical engineers' liabilities onto
soméone else. Rather they are definitive clauses which
idenrify where geotech nical engi neers' responsibilities
begin and end. Their use helps all parties involved rec-
ogñize theìr individual responsibilities and take appro-
priate action. Some of these definitive clauses are likely
to appear in your geolechnical engineering report. and
iûu ãre encouraged to read them closely Your geo-
iechnical engineer rvill be pleased to give full and frank
answers to your questions.
OTHER STEPS YOU CAN TAKE TO
REDUCE RISK
Your consulting geotechnical engineer will be pleased to
cliscuss other techniques which can be employcd to mit'
igate risk. ln addition. ASFE has developed a variety of
rñaterials which may be benelicial Contact ASFE for a
complimentary copy ol its publications direclor-v.
A GEOTECHNICAL ENGINEERING
REPORT IS SUBJECT TO
MISINTERPRETATION
Costly problems can occur when other design profes-
sionais-develop their plans based on misinterpretations
of a geotechnical engineering report. To help avoid
thesã problems, the geotechnical engineer should be
retained to work with other appropriale design profes-
sionals to explain relevant geotechnical findings and to
review the adequacy of their plans and specifications
relative to geolechnical issues.
BORINC LOGS SHOULD NOT BE
SEPARATED FROM THE
ENGINEERING REPORT
Final boring logs are developed by geotechnic.al engi-
neers baseã upbn theìr interpretalion of lield logs
{assemblecl by site personnel) and. laboratory evaluation
of field samples. Only finalboring'logs cuslomarily are
included in geotechnical engineering reports. these [ogs
shou[d not tmder anlt circumsttuces þe retirarvn [or inclusion in
architectural or oihcr design drawings, because clrafters
may commit errors or omissions in lhe transfer process'
Atrhough photographic reproduction elimjnates lhis
probleri ii doeinothing lo minimize the possibility ol
¿ontraclors misinterpreting the logs during bicl prepara-
tion. When this occurs. delays, dispules and unantici-
paled costs are the all'too-frequenl result.
To minimize the likelihood of boring log misinterpreta-
tion, give ,on¡¡,7¿tttrs readg access to the complete g.eotechnical
enqinitrurcl report preparecl or authorized for their use'
those who clo not provide such access may proceed un-
Puf'l¡slìd,l f'U
,/5¡FE THE ASSOCIATION
OF ENGINEERING FIRMS
PRACTICING IN THE GEOSCIENCES
BBìl Colewille Road/suite G lgólsilver spring, Maryland 20910/(301) 565'2733
079,r'llt
G09033G8
The field
field study
encounL.ered
of the test
encount.ered
through 47.
Ij
APPENDIX A
study was performed. on December.22 anð.23, 2009. TheconsisLed of logging and sampling the soilsin nine (9) test borings. The approximate locationsborings are shown on Figure 2. The 1og of the soilsin t.he test borings are presented on Figures A2
The test borings were logged by Lambert and Associat.es andsamples of significant soil types were obtained. The samplesv/ere oblained from t.he test borings using a Modified CaliforniaBarrel sampler and bulk disLurbed samples v¿ere obtained.Penetration blow counts were determined using a 140 pound hammerfree falling 30 inches. The blow count,s are presented on thelogs of the tesL boringrs such as 16/6 where l_6 blcws with thehammer \^/ere required. to drive the sampler 6 inches.
The engineering field d.escription and major soil classificationare based on our interpretation of.the materials encountered andare prepared according to the Unified Soil Classification System,ASTM D24BB. The descript.ion and classifícation which appear onuhe test boring logr is inLended to be that which most accuratelydescribes a qiven interval of the test. boring (frequently anint,erval of several feet). Occasionally discrepancies occur inthe Unified Soil ClassificaLion System nomenclature between aninterval of Lhe soil log and a particular sample in the int,erval.For example, an int,ervar on t,he t,est boring logr may be identj_fieclas a silty sanci (Su¡ while one sample Laken wiLhin the intervalmay have individually been iclentified as a sandy sitt (ML). Thisdiscrepancy is frequenlly allowed to remaín to emphasize t.heoccurrence of local t,extural variat.ions in the interval.
The stratification lines present.ed on Lhe logrs are intend.edpresent, our interpretation of the subsurface conclitions
encor.r.ntered in Lhe test boring. The stratification linesrepresent the approximat.e boundary between soil types and thetransition may be gradual.
lsmbert nnù Øggscíırtsg
to
ì
A1
CONSULIING GEOf ÊCHNICAL ENGINEERS ANO
HAIERIAL TESIIhC
KEY TO LOG OF TEST BORING
Borlng Number:
Elevatlon:
Date Drilled:
Location:
Diameter:
Field Engineer:
Total Dopth:Depth to WatsratTirne of Dtilling: '
ı¡¡
E
v,
g
CLoo
0
5
10
15
20
25
Sample
Soil llescription
Type N
Sand, silty, medium dense, moist, tan
(sM)L Unified Soil Classifi cation
lndicates Bulk Bag SampleB
c lndicates Drive Sample
lncicates Sampler TYPe:
C - Modified Califomia
St - Standard SPlit SPoon
H - Hand Sampler
7t12 lndicates seven blows required to
drive the sampler twelve inches with
a hammer that weíghs one hundred
forty pounds and is dropped thirtY
inches.
BOUNCE lndicates no further
penetration occuned with
additional blows with the
hammer
NR: lndicates no sample recovered
CAVED: lndicates depth the test
boring caved after drillinq
Y lndicates the location of free
subsurface water when
measured
CLAY Note: SYmbols are ofren
used only to helP visuallY
SILT identifY the described
information Presented on
SAND the log.
GRAVEL
CLAYSTONE
SANDSTONE
Laboratory Teet Resutts
Notes in thís column indícate
tests performed and test results
if not plotted^
DD: lndicates dry density in pounds per
cubic foot
MC: lndicates moislure content as percent
of dry unit weight
LL: lndicates Liquid Limit
PL: lndicates Plastic Limit
Pl: lndicates Plasticity lndex
ru
W
-
ProjectName: CGRS No. 1'10270-1172Jaa FrojectNumber: G09033GE
$mnherf mrh $'*snrinicx
CO NSU LTINO OEOTECHN ICAL ENGI N EERS AND MATERIAL TESTI NG
Figure: A1
T-o(Dc)z.À¡3PC)C)xØzIoN){o{lv--lft)0)1laoor)7EIt(Dt'tG)o(oO(¡CJ)C)m-nı'IgN)HgttdirtÉrt+gr+ç.{vÞHÞtrr"{ r&toùþozU)ct-_Jzoomo-tmc)TzC)f-mzL.,zmmnØz.o{m7FF-ìmCNJzoÐrc,i'o ÂtãßÉoFo:v!.! .. ı-Ø(Dorı"NøN-ãtoN)f-O:fo(o(ooofÐ!l-o:f .Ígı'3ãıDr3'd.bãG)3o-TT{umëU,'{IÐrr9ãô N't-ò='zd(O ^o-t¡,aZ3ETo:':5'c)oø-loÐgoîtN)(Doootão€!¡o:g¡-l3ooE_4,='çzoa{Dm=c)ocooo-SymbolDepthØ!J¿aı-f,ôJfD-É(tci5løn:$='oı=ísØ=ìo--.ã3$o=-a;'oa'.= ct9ıl-<fU'gÐoQÕ=,UeorÞJoaq¡oa-{(DVtnoUI;¡oc)(oo)Oi O)zililc)<5É-s*SooFãã]S.^O6üí=ô Il.¿äqã,q,Qf,q)o.-<Øı'oIilililil1ilililililltililililtililililililililil1illlil tllilEo7ocØOJIèd'o
To(Dozqi3f?TU)z*oI\J-.1O*-¡NJ--lolOJT-.9.(Doz3u(D.oO(ooG](,rCImllEtfq(jHtlrù+Ëlrtssgt++-ìwÞHÞt1FllItöNc)aìz.acr-{zrFJfnc'ïz(lT-mzazmm7Øz(]{mntt'-{mQ)-lzUTEä'O a)=o4l¡Jre(D*r-tãio:í,r .. ı-*5 0r)_.o¡or3a'¡¡o(4ñØ'NlUÕ Ì\)=.O-O{ı (oo_orxl)U=.oo'of.n5= O(ct\ìñ[rrd3d.'os ão3OT-.19mF PqE, ...|:r tDä__oÉ*HnÃJ:iãò='z- *(El Fro¡ooU/lErio olo ].:l+tc,| -¡. NJl5l(ot"lzlolllotmlf,lotoICl=oıo-SymbolNoooooDepth(nÂJ=:ooüQfo)!J-lãØdsXøtr: $='ôã<7-ø=ìo--d3$o=.6'ôq-o:-<lØgUoUt=.EIot-9'o!¡oe-toonoU'=tt,f^r{T'o(, Ni(t¡ (,o) o)zo<loçòY!¿OJ:l:'O(!-Ð cD9iriNjXövi ã'^=lcD'olC)=ß)o,<oo=oililtlillilil1illllltitilililililiiltililililililililililltconoC(toOJN\¡(Ðo
!-ooc)z!J3fqc)oÐCNz.9oN]{O-.,1N-{o)s)T'aoooz3a(D-oO(ooC'Ç)rn.Tlı'ÊIfcHgt-å{.+rk¡Ht+.gè+FIwÞHÞtrF{0nt9Hc)ozØcr-{z6)6)mo{fnïz¡-mzazmmÐØzU--.tmnFr--1TNØJzoru;'o a)=oÉ=a)¡eF8e.:..ã*g)o(Drı' ¡Jørì;Nc} ¡\)=.of,o(o (oıC)go:J .T¡sı'.gãıFrJË.Oão3o_Tl{om#Ø'-{wrrQ:ta-Þ32.rî(O ^o - tJ,3cro-C,)È5'c¡J(ùgt-|cå(fG-Ào"otroî¡Jo<o)oÐJ3ooG+Jçzo=omf,c)o:f(Dıo-SymbolDepthØÐE.o6-c):OJ$-EØp=ciSXørtr: !ısãglØ=ìo5ã=Êlo=. al'C)tÞ,:ı()l.:-- É_3øIooU'ofîoacno€"o;^ c)woE:fôØ*go_=o_=c);.,ø!ù@ô\tfueã'<o99ø!¿(D'' oi{o9*fuN)st-!)Ito!loa{oqlnoo;raoc)c){1:èN)(o oJı)ÕN)roJ(nC') o,zc)<lÕ-:r: ãXlO tø XíooãgJ',-nå83a)ñ0Jöqf,o'ocJ:: OJo_<aof-oIIililililtillltilillil ltililtililililililttrloo3o-t(DØEf,û)ÀooI
l
I
,:
.
Date Drilled:
Location:
Diameter:
LOG OF TEST BORING
12122t2009 Field Engineer: DRL Boring Number: 4
See test boring location diagram Elevation:
4 inches Total Depth: 14 feet Depth to Water at Time of Drilling: None Encountered ,
o
-a
E
U)
OJo
Sample
Soil Description
Clay, silty, sandy, stiff, moist, brown,
tan, approx. 2 inches organic (CL)
Laboratory Test Results
Direct Shear Test:
DD: 119 pcf MC: 5.9%
Type N
39/6
50/6
Wasatch Formation - Claystone,
Mudstone, Sandstone and
Conglomerate
Boitom of Test Boring at 14 feet
CGRS No. 1 -1 0270-1 1727 aa Project Number: G09033G8 Figure: A5Project Name:
Wffiuhwlûnù þøør'rr¡des
CONSULTINGGEOTECHNICALbNGINËERSANDMAIbRIALItSIING
LOG OF TEST BORING
Date Drillecl: 12l22l2)Ag Field Engineer: DRl, Boring Number: 5
Location: See test boring location diagram Elevation:
Diameter: 4 inches Total Depth: 14 feet Depth to Water at Time of Drilling: None Encountered
o.o
E
Ø
o.
0)o
Sample
Soil Description
Clay, silty, sandy, stiff, moist, brown,
tan, approx. 2 inches otganic (CL)
Laboratory Test Results
Swell/Consolidatíon Test:
DD: 101 pcf MC',9.2%
Type N
16/6
20t6
Wasatch Formation - Clavstone,
Mudstone, Sandstone and
Conglomerate
Bottom of Test Boring at 14 feet
Project Name: CGRS No. 1-10270-11727aa Project Number: G09033G8 Figure: A6
WffihwtffiIù bsø,ssrúex
1
,1
I
CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING
i
:
Date Drilled:
Location:
Diameter:
LOG OF TEST BORING
1212212009 Field Engineer: DRL Boring Number: Percolation Profile
See test boring location diagram Elevation:
4 inches Total DePth: I feet Depth to Water at Time of Drilling: None Encountered
-o
E
U)
l)o
Sample
Soil Description
Clay, silty, sandv, stiff, moist, brown,
tan, approx. 2 inches organic (CL)
Laboratory Test Results
Type N
Wasatch Formaiion - Clavstone,
Mudstone, Sandstone and
Conqlomerate
Botlom of Test Boring at I feet
CGRS No. 1 -1027 O-1 1727 aa Project Number: G09033G8 Figure: A7
Wg,lø'¡beúanù þxxøfifújjø
CONSULTING GEOTECHNICAI FNGINEERS AND MATËRIAL TESTING
Project Name
G09033c8
APPENDIX B
The laboratory sLudy consisted of performing:
Moist.ure cont.ent and dry density Lests,
Swell-consolidation tests,
A Direct Shear Strength test, and
Chemical t,ests.
It should be noted LhaL samples obLained using a drive type
sleeve sampler may experience some disturbance during t.he
sampling operations. The t.est results obt.ained. usingi Lhese
samples are used only as indicators of the in siLu soíI
characterisLics.
TESTTNG
MoisLure Content and Dry Density
Moisture contenL and dry density \^/ere deLermined for each
sample tested of the samples obt,ained. The moisture cont,enL was
determined according t.o ASTM Test MeLhod D22L6 by obLaining the
moisture sample from the drive sleeve. The dry density of Lhe
sample was det.ermined by using the wet. weighL of t.he entire
sample tested. The result,s of the moisture and dry density
determinat,ions are presented on t.he logs of borings, Figiures A2
througrh 47.
Swell Test
Loaded swell- tests were performed on drive samples obtaíned
cluringr Ehe field study. These tesls are performed in general
accordance with ASTM TesL Method D2435 Lo the extenL Lhat the
same equipment and sample dimensions used for consolidation
tesling are used for the determinat.ion of expansion. A sample is
subjected to static surcharge, water is introduced to produce
saturation, and volume change is measured as in ASTM Test l¿Iethod
D2435. Results are reported as percent change in sample herght..
Consolidation Test
One dimensional consolidation propert.ies of drive samples \^/ere
eval-uaLecl according to the provisions of ASTM Test Met.hod D2435.
Lembert enù €trgsoci$teg
B1
CO'{SULTING GEOIECHN¡CAL €IIGITIEÉRS ANO
gATERIAL IESTING
c0 9 03 3GE
Water was added in all cases during the tesL. Exclusive of
special readings during consolid.atíon raLe tesLs, readings during
an increment of load \^iere taken regularly until the change in
sample height was less than 0.001- inch over a Lwo hour period.
The results of Lhe swell-consolidation load Lest are summarized
on Figures 81 and 82, swell-consolidation tesLs'
It should be noted
consolidaLion data is
in axial load. As a
be illustrated.
that the graphic PresenLation of
a presentation of volume changTe with change
result, boLh expansion and consolidaLion can
Dírect. Shear Strength TesL
Direct shear strength properties of sleeve samples were
evalua¡ed in general accordance with Lesting procedures defined
by ASTM Test Method D3080. Two (2) direct shear strength tests
was performed on samples obtained. from Test Boring Nos. 3 and 4
aL depLhs of four (4) and nine (9) feet, respectively. An
int.ernal angle of friction of 22 degrees and a cohesíon of 250
pounds per sguare foot were used for the silty clay soil
materials and an interna.l. angle of friction of 32 degrees ancl a
cohesion of 11_2 pouncls per square foot, were used for the
formational maLerials in our analysis '
Chemical Tescs
chemical l-ests for water soluble sulfates and pH were perfornred
on select sampl es obtairLed during the field sLudy' The resulcs oi
che chemical Lests are tabulateo below'
Test Boring
Depl,h 4-5 feet
8.70
water soluble sulfates 11-5 ppm
I,s¡nbert snù ß[ggocisteg
3
pH
B¿
CO'.ISULf IIIG G€OÍÉCHNICAL EN6INÊÊRS ANO
TAI ÉRIÀI TÉSÎING
10
PRESSURE (pouxus ern sqùRne roor)
100 1000 000
2
)0
2
3
oì(¡)
4
5
N
o
Þ!
B
U)
Èoo
6
7
Sweì I Undcr Constant Presgure
Due To Wetting
t
j'water oddtd
lo somplc
SUH'IARY ff I"ESÏ RESULTS
Diamtlcr(in )
*tçll Pr¡tture(PS E)
[+{cistura
Cc¡rttcnl PAI
Dry Dtnsily
(P.C.E )
Hrright
( in.)
Edng No. 3
ct,pth 9-10 ft.
1t?_n 1-q¿rlnilìol12.8 1_C)
1R e roL 500 tFÍtnlllq_n qÁR
Was:frh Format inn-f ¡åv<fônê-Muclctone- Sanrlctone end%ìl Dtscriølion
j
Conglomerate
Oal.:2/l 6/ 10
Fígura: BlLambert rnù Çl.ssoeisteg
slvELt - corJsot lDATtoN rESr ftojoct Ho.; M9033GE
10
PRESsURE (POUHOS PER SqUARE TOOT)
100 1000 1 0,000
)0
2
3
¡ì
U)
4
q
Ico
Þ-l¡
ìg)so()
6
7
Swel I Under Constant Pressure
Due To Wetting
t
*
t, Wolor oddtd
lo somPlo
\
SUMFIARY 6 rEST FESULTSBdng No. 5
4-ft.*kÅsturc
Crshnt loAI
Dry hnsìly(Þc.E )
Htight
I in.)
Diomtter
(in. )
SFr/l Prç¡¡sre(P.S.E)
lnitiol 500 t
Fìtøl
9r,il D.sciípîion
Mo9o33GEÊojrcl No.L- CONSOLIDATION TESTSWEL
2/16/ 1oOata :
Figurc t 82I,smhert tnb ß,s'goctateg'
c09 03 3cE
APPENDÏX C
GEOLOGY DISCUSSION
SOUTHWEST COLOFÀDO GEOLOGY
SouthwesL Colorado exhibit,s many geologic features formed by
a multitude of geologic processes. Regional inundation, uplift,
volcanism and glaciation are responsible for some of t.he complex
geology of the region. Many theories and speculations concerning
the mode of occurrence of the regions's gieology have been presenL.ed
over the years. This cursory discussion of the g'eology of
southwesL Colorado presents some t.heories accepted by the geologic
communit,y, but is only intended to introduce t.he basic concepts and
restraints that arise due Lo geologic activity.
Prior to t.he formation of the Rocky Mountains souLhwest
Coforado v/as a primarily a flaL lying region with litLle
topographic expression. The North American continenL was
experiencing many episodes of deposition. The Transcontinental Sea
was transgressing and regressing:'across the continent, these
transgressions and reg:ressions are the cause for such diverse rock
types. The st.ratigraphic column in souLhwesLern Colorado expresses
rock LX)es from variable clepositional environmenLs. LimesLones are
formed in deeper water, sandsLones are formed in beach and Lidal
flat environments, while arkosic sandsLone and conglomerates are
formed in allur.ial plains and fans. Parlicle size and mineraloqic
cont,ent in rock units are related to the deposit.ional environment.
A sandstone or conglomeraLe would not, be likely to form in a deep
sea environment because there would not be enough energy to carry
such larqe particles a grreat distance from the source lands. As
one observes the stratigraphic column of southwesL Colorado a
siltstone may be overlain by a sandstone which is in turn overl-ain
by a silLstone. This represenLs a regressional Lhen
Lransgressional sequence. Many such sequences or combinaLions of
olher rock uníts are exhibiLed throughout southwest Colorado.
The final reg-ression of the sea may have been caused by
orogenic activity and uplif t. This uplif t l¡/as not conf ined to
Colorado, it was a regional uplift that" occurred in many stages.
The uplíft is what caused the formation of Lhe ancest.ral rockies.
The Larimide Orogenic episode is responsible for the formation of
the San Juan dome. (Note: The San Juan dome theory is not accepLed
by the entire qeologic community. It is used here for descripLive
purposes). The San Juan dome \^/as essentially an upv¿arp of the
sLratigraphy formed by sedimentation during t,he Transcontinental
Sea. An actual dome probably never existed due to erosion cluring
the uplift. The idea being that. a dome of sediments and rock uniLs
T,smhert snù fløgotíuteø
cl_
CONSULIING CEOTECHNICAL ÊNGINE€RS ANO
ÍdATERIAI IESTING
G0 9 03 3cE
i
I
Ì
The orientation of beddínq planes forms a radial pattern around the
San Juan region which seems t.o vindicate this Lheory;
The stresses need to "Llp\^Iarp" this large areA were obviOUsly
tremendous. Localll¡ occurring sLresses may not.be suffícienL to
move this quantíty- of material, global tecLonics, directly or
inclirectly, *ry nán" been involved. Compressíon of the entire
North American plate could have occurred. The magnitude of the
stresses and thä deep seated origín of these stresses also have
;;;=¿á extensive volðanism. Colorado has many large remnants of
Calderas that *"". active during the oroqenic activiLy' The
silvert.on and Lake city calderas are the largest in t'he san 'Juan
,ãgi""- Activi¿t in the Sílvert.on Caldera has been estimated
(rädiclmetrically) to have occurreð' 22 miltion years ago' Calderas
of this maqnituäã are believed to have formed by the collapse of
epierogeniı magma chambers. Volcanic and meLamorphic rock bodies
u.?. "ori*on in the San Juan region' many of these units are relaLed
to the orogenic activity in the region'
Faults associated with local orog"enic activity are anoLher
coÍìmon geologic feaLure found in southwesLern Colorado ' As stated
previouãly, exLreme stresses were probably associated wil-h the
formaLion of t.he san Juan Mountains ancl may be responsible for
ãå.p*="uted volcanic and metamorphic processes. These slresses had
to be released,- ifr" geoloqic mod.e for stress release is faulLing'
niastrophic ..ti.rity" i., the area today is quite 1ow, Lhe lack of
seismic activiiy inåicates that sLresses are not currenLly being
released. An
-ä*pf
"trrtíon for the loss of stresses is througrh
faulting.
The lasL. episode of reqional geologic activity in the area was
glaciation. The most recenL period of glacial act.ivity ended
approximately 10,000 years ago. Glaciat, activity is responsible
for much of the'topojraphic expression in the area. "U-Shaped"
,ãifãv=, morainè ¿"p"ãit", tarns, (glacial formed lakes), and rock
glacíers are Lhe mosL promínent features which are found in
southwestern colorado as a result of glacíal activity' The valley
ãonfigurations are a result of the erosional acCivity of the
glaciers. ¡torainã deposits developed during thre g:1acial- activity'
Rock glacíers ãru *o.iing masses of rock which are Lhought- Lo have
an ice core wfricfi may bã the Last remnanL of glacial ice' As the
subsurface ice core moves and melts, t.he overlyinq mass of rock
also moves.
i[.umhert nnù ßlgøocínteg
C2
COH3ULftNO OEOTECIINICAL E¡¡OI'¡EER6 AIIO
MATÉRIAL TESTING
c09033cE
APPENDIX D
GENERAL GEOTECHNICAL ENGINEERING CONSIDERATIONS
D1. O TNTRODUCTION
Appendix D present,s general geoLechnicat engineering consideraLions
fof -¿esign ana construction of slrucLures which will be in contacL
wiCh soiis. The discussíon presented in this appendix are referred
to in the text of Lhe report and. are inlended as tutorial and
"uppf"mental ínformation to the appropriale secLions of the texL of
the report.
D2 . O FOI.]I\DATION RECO}IYIENDATIONS
Two criteria for any foundatíon which musL be sat.isfíed for
satisfactory foundaLion performance are:
. conlact stresses must be low enough to preclude shear
failure of the foundation soils which would result in
lateral movement of t'he soils from beneaLh the
foundat,ion, and
. setLlemenL or heave of the foundation must be within
amounts Lolerable to Lhe superstructure '
The soils encounLered during our field study have varyingt
engineering characteristics thaC may influence the desígn and
consLmction considerations of tfre fçuñdations. The characLeristics
include swell potentiat, settlement potential, bearing capacity and
the bearing coådirions of Lhe soils supporLing the foundations ' The
éã"ur"r aíscu=siot below is int.ended to increase the readers
Éamiliaricy wiLh characterisLícs Lhat can influerice any sLrucLure'
D2.L Swelt Potential
Some of the materials encounLered during our field study at the
anticipaLed f oundat.ion depth may have swelI potent'ial' swell
potentiaf is Lhe tendency of the åoif to increase in volume when iL
becomes wetted. The volume change occurs as moisture is absorbecl into
the soil and water molecules bðcome atbached to or adsorbed by Lhe
individual clay platlets. Associatecl with the process- of volume
chanqe is sweti þr.==1r.r*. The swell pressure is the force the soi:
ãpprí"" on it.s -"üirorrndings when mois{ure is absorbed int'o Lhe soil '
Foundation desiın conside?ations concerning sr,velling soils inclucle
structure tolerance t.o movemenL and dead load pressures to help
D1
{.embert enù €Iggsúateg
CONSULIIHG GEOTECHNICAL ÊNGIHEERS ÀNO
I{AÍERIAL IÊSIING
l'
c0 9 03 3GE
restrict uplifL. The structure's t.olerance to movement should be
add.ressed by trre struct,ural engineer and. is depende,nt upon many facels
of the desigrr- incfuAing LhJ overall sLructural concept and the
build.ing material.--tit" üplift..forces or pressure due to wetted clay
soils can be addressed.by designing the foundations with a minimum
dead toad u"di;;-;lãåit s* tlt. fıundãtions on a blanket of comtr¡acled
sLrr-r.ctural f itl. The compacLed structural f itl blanket will increase
Lhe dead. load ott tfr"-=wetiingi foundations soils and will increase t'he
separation of iü"-i",-.rtdation f rom the swelling soirs ' sug:gestions and
recomrnen¿ations tor d.esign dead- load and compacted sLructural fill
btanker are " p;;;;Lud below. Compacted structural f irr
recoï'ftmendat.ions are presented under COMPACTED STRUCTURAL FILL below'
D2.2 Sett.lement PoLential
Settl-enrent potent.ial of a soil is Lhe tendency
.*p*ti.rl." .rofr.r*. change when subjecLed to a load'
chäracterízed by downward movement of all or a
supporLed strucinte as the soil particles move
råã"fti"q in decreased soil vol-ume' Settlement
function of;
. foundation loads,
, depth of footing embedmenL'
. thã width of the footing, and
. the settfeÃãn|-óoi"tttia-l or compressibitiLy of the influenced
soil.
FounclaLion desiqn considerations concerning settlement poLential
inclucle t.he amount. of movemenL tolerable Lo the strucLure and the
desiqn and consLruction concepts to help reduce the potential
movement. The settlement potenii-f of the ioundation can be recluced
by reducing foundation pressures and/or by placing Lhe foundations on
a blanket of àà*pactåd sLructural filt ' The anticipated posL
consLruction settlemenL poLentiat and suggested compacLed filr
thicknes" r."o**endationã .tá based ott siCt specífic soil condiLions
and are presented in t'he text of the report '
D2.3 Soil Support CharacterisLics
The soil bearing capacity is a function of;
. the engineering properties of the soil material supporting the
foundations,
the foundaLion width,
the depth of embedment of t'he boLLom of the
lowest. adjacenL grade,
the influence of the ground water' and
ihe amount of settlement tolerable to the s
D2
![.nffibert nnù ßggocÍsteø
for the soil to
SettlemenL ís
portíon of Lhe
closer Logether
potential is a
foundation below the
trucLure.
COÑSULTING GEOTÉCHNICAL ËNGIÑÉËRS ÀNU
TIAlERIAL IESIINO
c09033cE
Soil bearingr capacity and associaLed minimum depth of embedment are
presented in the t.ext of the report..
The foundation for t.he st.rucLure should be placed on relatively
uniform bearing conditions. Varying support clraracLerisLics of the
soí1s supporLingr the foundation may resulL in nonuniform or
differential performance of the foundation. Soils encount.ered at
founrlation clepLhs may contain cobbl.es ancl br:ulders. The cobbles and
boul-clers encountered at foundation dept,hs may apply point. loads on the
foundation resulting in nonuniform bearing condit.ions. The surface
ot Ene rormarlonal material may und.ulate throughouL the building site.
If this is Lhe case it may result in a portion of the foundation for
the sLructure being placed on Lhe formational maLerial and a porLion
of the foundation being placed on the overlying soíls. Varying
supporL materíal will result in nonuniform bearing condít.ions. The
influence of nonuniform bearing conditions may be reduced by placing
Lhe foundation members on a blanket of compacted structural fill.
Sugqestions and recommendaLions for constructing compacted sLructural
fíll are presented under COMPACTED STRUCTURAL FILL below and in Lhe
text of the report.
D3. O COMPACTED STRUCTURAL FILL
Compacted sLruct.ural fill is typicalty a maLerial which is
consLruct.ed f,or clirect support of structures or sLructural components.
There are several material characLeristics which should be examined
before choosinq a maLerial for poLential use as compacted structural
filf. These characteristics include;
the size of the larger ParLicles,the engineering characterísLics of Lhe fine grained porLion of
material malrix,
the moisture conLenl that Lhe maLerial witl need to be for
compaction with respect to the exist.ing init.ial moisture conLent,
the organic conLenL of the material, and
t.he ilems thaL inf luence the cosL t,o use the maLerial.
CompacLed fill should be a non-expansive material with Lhe maximun
agqregate size less than about two (21 inches and less than abouc
twenty five (25) percenL coarser Lhan t.hree quarler (3/4) inch size.
The reason for the maximum size is that largier sizes may have too
qreat an influence on the compaction characteristics of the material
ánc1 may also impose point loads on the footings or floor slabs :he:
are in contact with the maLeríal. Frequently pit-run materia-r cr
crushed aqgregaLe maLerial is used for sLructurat fill maLerial ' Pit-
run materiãt *ay be satisfact,ory, however crushed aqgregrate material
laffibert snù FLøgsrieteg
ì'
L
,:.
D3
CONSULTING GEOTÊCHNICAL ÊNGIN€ERS ÀNO
HÀTERIAL TESI¡NG
c09033G8
If you have
radon, PIease
3030
withangulargrainsispreferable.Angularpart'iclestendto
inLerlock with ""åï- ottrãr t.tter than rounded particles '
Thefinegirainedportionofthefillmaterialwillhavea
sisnificanl i"Ëi;;;;. oï tr."-putiãt*t""" of the fill' Material which
has a fine giraio"ã *"trix comfro=ãã-tf silb and/or clay which exhibits
expansive "irrrå"J.iistics "üã"fA ¡. avoid"ed fot Llse as sLructural
f ill. The moi-sture conLent "Ì-ir." maLerial should be monitored during
construction ;"d - maintain"ã -ãá"i optimum moisture content for
ãompaction of the maleríal '
Soilwithanappreciableorganicco-nLentmaynotperformaclequately
for use as struci'urãf filt malerial due to Lhã compressibil-iLy of t'he
maLerial and ultimaLely An. fo-Jft. decay of the organíc portion of the
material.
D4. O RADON CONSIDERÀTTONS
Informationpresented.in.,RadonReductioninNewConstruction,An
Interím Guide, î:pÁ-gf -009 by l.:he [nvironmcntal Protecf inn Agency dated
August 1-g87 indicates that cuirent.ly there are no sLandard soil tests
or specific stããàar¿s for coirelating Lhe results of soil tests äL a
buildinq site with sun=.que-rrJ-inOoır radon levels ' Actual indoor
levers can be affected nv .orrãtructíon techniques and may vary qreatly
f rom soil radon Lest result=. -ih;¿fore it is recommended that radon
tests be condu"t"a in the strucLure after construction is complete Lo
verify t.he acuual radon leve1s in the home '
WesuggesEthat'youconsiderincorporatingconslrucLiontechniques
into L.he development to t"ãr-,"à tádon levets in the residential
structures and. provide r"i-i"trof ittinq equipment f or radon gas
removal if it becomes necessary
Measures to red.uce rad.on levels in strucLures include vented crawl
spaces with ";;;; barrier ãt- tir* surface of the crawl space to
restrictradongasflowintothesLructureoraventedgravel-ayer
with a vapor uriri"iieneatt a concrete slab-on-qrade floor to allow
venting of radon gas collectåa beneath ¡he floor and to restricL radon
gas frow throuãir-irr" slan-onlgrrade floor into the sLrucLure' These
concepts .re shown on Fígure Dl- '
any guesLions or would like more informaLíon about
conLacL us ot tft" State Health DepartmenL at 303-692-
t:
T.sûnbert mnù flggurinted
D4
CONSULTING GEOTÉCHNICAL ENOINEERS ÂI¡O
I¡ATERIAL fESIING
I
I
Fan
Medium pressure zone
ssure zoneLow
Radon
RadonHigh pressure zone
This figure was excerpted from an EPA manual rrRadon-resistant Construction
Techniques for New Residential Constructiont'and reproduced here for reference
only
RADON FLOW CONCEPT
I turct fla: G
2
)1
r'
Lambert anù ÍIgtotútt?Í