HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLM F-04-18 -5231- a nd SE PT-04 -18-5232
Chris Janusz
New Manufactured Home with Basement
3644 Highway 82, Glenwood SPrings
Janusz Exemption, Lot 2
1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY THE COLORADO DEPT. OF HOUSING
(c.D.o.H.)AND ALL FACTORy-BUtLT RESTDENTTAL STRUCTURES lN GARFIELD COUNTY MUST
COMPLY WITH C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE.
2l FOUNDATTON, BASEMENT & S|TE WORK SHALL COMPLY WITH 2015 LR.C., 2009 l.E.C.C. AND
MAN U FACTU RER'S I NSTALLATION REQU I REM ENTS.
3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS & DETAILED
DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS.
4l GEOTECHNTCAL ENGTNEER TO REVTEW FTNAL SITE GRADING & DRAINAGE, INCLUDING ALL ITEMS
PREVIOUSLY ADDRESSED IN GEOTECHNICAL REPORTS AS PREPARED BY HP GEOTECH (DATED
2/9/O9) AND Hp-KUMAR (DATED 4/L6/tg). GEOTECHNICAL ENGINEER'S CERTIFICATION REPORT
IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
5) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REQUIRED
AT FOUNDATION INSPECTION TO VERIFY THAT STRUCTURE IS IN COMPLIANCE WITH BUILDING
SETBACK REQUIREMENTS INCLUDING ROOF PROJECTIONS.
6) AN ACCESSORY DWELLtNc UNtT (A.D.U.) AT UNFTNISHED BASEMENT lS SPECIFICALLY NOT AN
APPROVED USE UNDER THIS BUILDING PERMIT, AND ANY SUCH USE REQUIRES A LAND USE
CHANGE PERMIT UNDER THE PROVISIONS OF GARFIELD COUNTY,S LAND USE & DEVELOPMENT
CODE.
7) SEpTtC SYSTEM MUST COMply W|TH ALL DESIGN CRITERIA INCLUDING MINIMUM SETBACK
DISTANCES PER GARFIELD COUNTY,S O.W.T.S. REGULATIONS. PROVIDE COPY OF ENGINEER,S
REPORT FOR SEPTIC SYSTEM INSTALLATION PRIOR TO FINAL BUILDING INSPECTION &
CERTI FICATE OF OCCU PANCY.
8) ALL pLUMBING AND GAS ptptNG CONNECTIONS MUST BE PERFORMED BY A COLORADO
LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A
COLORADO LICENSED ELECTRICIAN.
9) ELECTRTCAL pERMtTTtNG AND tNSpECT|ONS BY STATE OF COLORADO ELECTRICAL BOARD.
ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION &
CE RTI FICATE OF OCCU PANCY.
L0) GARFTELD COUNW BUtLDtNG DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS
B. FOUNDATION
C. PLUMBING/GAS
D. SITE BUILT STAIRS, PORCHES, DECKS, GARAGES, ETC.
E. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY*
* NOTE: GARHELD COUNW REQUTRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFF|YED PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.