Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLM F-04-18 -5231- a nd SE PT-04 -18-5232 Chris Janusz New Manufactured Home with Basement 3644 Highway 82, Glenwood SPrings Janusz Exemption, Lot 2 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY THE COLORADO DEPT. OF HOUSING (c.D.o.H.)AND ALL FACTORy-BUtLT RESTDENTTAL STRUCTURES lN GARFIELD COUNTY MUST COMPLY WITH C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. 2l FOUNDATTON, BASEMENT & S|TE WORK SHALL COMPLY WITH 2015 LR.C., 2009 l.E.C.C. AND MAN U FACTU RER'S I NSTALLATION REQU I REM ENTS. 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS & DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 4l GEOTECHNTCAL ENGTNEER TO REVTEW FTNAL SITE GRADING & DRAINAGE, INCLUDING ALL ITEMS PREVIOUSLY ADDRESSED IN GEOTECHNICAL REPORTS AS PREPARED BY HP GEOTECH (DATED 2/9/O9) AND Hp-KUMAR (DATED 4/L6/tg). GEOTECHNICAL ENGINEER'S CERTIFICATION REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 5) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REQUIRED AT FOUNDATION INSPECTION TO VERIFY THAT STRUCTURE IS IN COMPLIANCE WITH BUILDING SETBACK REQUIREMENTS INCLUDING ROOF PROJECTIONS. 6) AN ACCESSORY DWELLtNc UNtT (A.D.U.) AT UNFTNISHED BASEMENT lS SPECIFICALLY NOT AN APPROVED USE UNDER THIS BUILDING PERMIT, AND ANY SUCH USE REQUIRES A LAND USE CHANGE PERMIT UNDER THE PROVISIONS OF GARFIELD COUNTY,S LAND USE & DEVELOPMENT CODE. 7) SEpTtC SYSTEM MUST COMply W|TH ALL DESIGN CRITERIA INCLUDING MINIMUM SETBACK DISTANCES PER GARFIELD COUNTY,S O.W.T.S. REGULATIONS. PROVIDE COPY OF ENGINEER,S REPORT FOR SEPTIC SYSTEM INSTALLATION PRIOR TO FINAL BUILDING INSPECTION & CERTI FICATE OF OCCU PANCY. 8) ALL pLUMBING AND GAS ptptNG CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 9) ELECTRTCAL pERMtTTtNG AND tNSpECT|ONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CE RTI FICATE OF OCCU PANCY. L0) GARFTELD COUNW BUtLDtNG DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B. FOUNDATION C. PLUMBING/GAS D. SITE BUILT STAIRS, PORCHES, DECKS, GARAGES, ETC. E. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY* * NOTE: GARHELD COUNW REQUTRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFF|YED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.