HomeMy WebLinkAboutBolt Inspection Report 07.02.18West Slope Testing & Inspection LLC Report # 1
3177 Glendam Dr.
Grand Junction, CO 81504 Page 1 of 1
Phone: 970-434-6988
Cell: 970-260-2844
Ins ecdon Report
Date: 7-2-18
Project: Metal Building Nexo Water Treatment Merchant Plant 1
Address: 5957 CR 319 Rifle, CO
Building Permit No: BLCO-04-18-5188
Contractor that Performed Work: Tally Ho Construction
Inspection of shop fabrication or field work at job site: Field
Report: Inspected high strength A325 bolting at the main frame column & rafter
connections. Also randomly tested/verified A325 bolts were adequately tightened.
Note; at the rafter to column connection (Southwest corner) the rafter end plate
was bent at the bottom edge. Per the metal building manufactures correspondence
it appeared that they were satisfied with the connection as is.
The high strength A325 bolting inspected above appeared to be in substantial
conformance with the plans, and the AISC/RCSC Specification for high strength
bolting.
Inspector/Technician: Douglas E Young
Douglas E. Young
C Certification 102224
C*Uqural eldi Specia cto
ruOpied
eel Boltin S ial spector
V, y-Ei goof ng S i Inspector
��r ® Douglas E Young
�wS CW1 96070131
❑C1 EXP. 7/1/2020
ElVEI]�
JUL I J 2018
Bim,.