Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-04-18-5206 a nd SEPT-04- L8-5207 Aspen Polo Partners, LLC Equestrian Facility + Upper Level Residential Dwelling Unit L64LL H ighway 82 - Ca rbonda le, Colorado 1) ALL WORK MUST COMPLY WITH 201_5 LB.C., l.P.C., LM.C., LF.G.C., AND 2009 l.E.C.C., l.F.C., AN D MAN U FACTU RE R'S INSTALLATION REQU I REM E NTS. 2) WORK SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: (A)GARFIELD COUNTY B.O.C.C. RESOLUTION NO. 2Ot8-10; (B)ASPEN VALLEY POLO CLUB P.U.D. REGULATIONS AND P.U.D. GUIDE; AND (C)THE FINAL PLAT' 3) BUtLDtNG tS PERMITTED AS CONSTRUCTION TYPE "V-8", WITH OCCUPANCY GROUP "U" coMMERC|AL EQUESTRTAN FAC|L|TY/BARN AT MAIN LEVEL & OCCUPANCY GROUP "R-3" RESIDENTIAL DWELLING UNIT AT UPPER LEVEL. FIRE-RATED OCCUPANCY SEPARATIONS ARE REQUIRED BETWEEN RESIDENTIAL DWELLING UNIT AND EQUESTRIAN FACILITY BELOW. 4I AN AUTOMATIC FIRE SPRINKLER SYSTEM IS REQUIRED THROUGHOUT THIS BUILDING PER I.B.C., SECTION 903.2.8 AND I.F.C., SECTION 9O3.2, TABLE A. CONTACT LOCAL FIRE DISTRICT FOR DESIGN CRITERIA, INSTALLATION REQUIREMENTS & INSPECTIONS. FIRE DISTRICT FINAL APPROVAL LETTER AND SIGN-OFF REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCU PANCY. s) FtRE ALARM SYSTEM tS REQUTRED tN THrS STRUCTURE. VERIFY SYSTEM DESIGN WITH LOCAL FIRE DISTRICT. 6) pROVtDE OPEN-HOLE SOTLS REPORT AT FOOTTNG TNSPECTION TO VERIFY 1,500 PSF. 7) VER|Fy COMPLTANCE W|TH EGRESS REQUTREMENTS PER 20L5 LB.C., CHAPTER 10. VERIFY EXIT DIRECTIONAL SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECÏRICAL ROUGH-IN INSPECTION. 8) ACCESS|BtLTy REQUTREMENTS PER 2015 r.B.C., CHAPTER 11 AND tCC/AIL7.1-2OO9 STANDARDS. 9) LOCKS, LATCHES & LANDINGS PER 20L5 l.B.C., SECTION L010. 10) LtGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 lBC, CHAPTER 12. 11) ENGTNEERED SEpTtC SYSTEM (O.W.T.S.) SHALL BE TNSPECTED BY A COLORADO LICENSED PROFESSIONAL ENGINEER. PROVIDE ENGINEER,S FINAL REPORT AND AS-BUILT DRAWINGS PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 12) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AlR, DUCTWORK & VENTING REQUTREMENTS pER TNTERNATTONAL MECHANICAL CODE (rMC)AND IECC, SECTION 503. MECHANICAL ROUGH-IN INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION. L3) pLUMBtNG REQUTREMENTS pER TNTERNATIONAL PLUMBING CODE (lPC)AND INTER- NATTONAL FUEL GAS CODE (rFGC). PLUMBING ROUGH-rN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. L4) ELECTRTCAL REQUTREMENTS, PERMTTTTNG AND TNSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.