HomeMy WebLinkAboutOWTS Report 04.19.2017Onsite Wastewater Treatment System Report AspsN Varrsv Polo Crus 1641 1 Hrcuwav 82 CansoNDALE, CO April19,2017 Prepared by Roaring Fork Engineering 592 Highway 133 Carbondale,CO 81623 Onsite Wastewater Treatment System Report AsppN Vallnv Poro CLus 164l I lhcuwav 82 CaneoNDALE, CO THE PROPOSBO ONSTTB WASTEWATER TREATMENT SYSTEM (OWTS) FOR ASPEN VALLEY POLO CLUB TN GenT.mIo CouNTy CoI-oRAoO HAS BEEN DESIGNED TO COMPLY WITH THE MOST CURRENT (JuNr 2014) EDrrroN oF THE GARFTELD CouNrv OWTS UsE PERMTT Rr,cuLATroNS. I Table of Contents Table of Contents.......... 1.0 ExistingConditions 1.1 General............. 1.2 Soil Conditions. 2.0 OWTSOverview...... 2.1 North Septic Field. 2.1.2 Septic Tank Sizing.... 2.1.3 Soil Treatment Area Sizing. 2.1 .4 Setbacks 2. 1.5 Distribution and Dosing........ 2.l.6Head Loss....... 2.1.7 Pump Selection ... 3.0 Maintenance Appendix A: Completed OWTS Permit and Construction Permit Application Checklist. Appendix B: Geotechnical Report and Profile Pits.............. Appendix C: Design Flows and STA Sizing Appendix D: Dosing Volumes..... Appendix E: Pump Curves........ Appendix F: Product Information 2 J J J 4 5 5 5 5 5 6 6 6 6 I 2 3 4 5 6 2 1.0 ExistÍng Conditions 1.1" General The property address is 16411 Highway 82, Carbondale Colorado. The parcel number is239131100033. The property is owned by Aspen Polo Partners LLP. The proposed development is located south of Highway 82, north of the Roaring Fork River and about0.62 miles east of Catherine Store Rd. The property is accessed off of the Highway 82 Frontage Rd. which connects to Catherine Store Rd. The legal description of the property is Section: 31, Township: 7, Range: 87 atrack of land in lots 8,9 &,10 of sec 31 and lots 5 &13 in sec 32 in Garfield County, Colorado. The parcel is a total of 100.44 acres. l'igrre I - Çutlìle¿t ('oull.y ¡l,r¡c.rsol lr ll,lup oJ lr<tpcrt.v The development is currently proposing two regular sized polo fields, five barns with ADUs, a clubhouse and four small cabins. Three separate Onsite Vy'astewater Treatment Systems (OTWS) will be used to treat the wastewater from the sources. This report pertains to one of those three systems from now on referred to as the North Septic System. 7.2 Soil Conditions In 2008, a Geotechnical report was produced by HP Geotech. This site was deemed to be in the western Colorado evaporite region within the Carbondale collapse center. The report indicates that this creates a long term settling or subsidence rate between 0.5 and 1.6 inches every 100 years, which should not have significant impact on the development. HP Geotech also delineated 7 different river terraces across the site stepping down to the Roaring Fork River. All of the development for Zone I will take place on the upper tenace out of the wetlands. The delineation of the terraces can be seen within the attached Geotech report. The soil profile pits determined by field exploration conducted on January 10, 2008 shows 0.5 to 3 feet of topsoil overlaying 2 feet ofsilty sand in Pit I and relatively dense, silty sandy gravel containing cobbles and boulders in the remaining pits. This is said to be alluvial deposits. Logs of these exploratory pits and their locations can be found within the Geotech Report. 12 pits where dug with an excavator with most depths ranging between 8 and 10 feet deep. The report also states thatjudging from Colorado State J r{. ìJ dli:¡j ,¡til¡i¡,. r'l ¡.ål¡!lì:.1ì flwrÍ ¡x!¡,ig.rÈI [Ìmr:tÞ ¡lltr¡luf'r¡ rir¡lìl-jt:Jrt IilEÉr.üÍif,lø ¿¡¡rrl..:-,,l t¡ñfiû-lt¡{r¡if \D ¿tuìuì:ìl | ¡.¡:l1]É:i rïr:ÞJlìlÌ:;l :lliì15 rùFru Engineer's well records this river alluvium consists of rounded gravel-to boulder size rocks in a relatively clean matrix extending to clepths of 40 to 50 feet. Roaring Fork Engineering also excavatcd six profile pits on September 12,2017. Thc six holcs wcrc dug within the proposed locations of the three septic tìelds. Two profile pits per tìeld. The excavations yielded similar results as the geotechnical investigation by IIP Ceotech, with top soil overlaying alluvial glacial silty sandy gravels and cobbles. Profile exhibits can be found in the appendix. This investigation combined with the gradation test from the 2008 HP Geotech report indicates that the alluvial layer below the top soil is Soil Type 1. Free water was encountered on the north side of the property, which appears to be coming from the flood irrigation of the hay field just north of the Highway. The ground water was 24 inches below grade at its highest level during observation. This was only observed at the location of the proposed northern soil treatment area. The North Septic System containing the northem soil treatment area will be a mounded bed system to provided adequate clearance above the ground water. Groundwater was not found in the other profile pits which were excavated down to depths of 8 feet. 2.0 O\ryTS Overview The septic system will be designed in accordance with the Colorado Department of Public Health and Environment's (CDPHE) Regulation 43 and Garfield County regulations. A Colorado Department of Public Health and Environment (CDPHE) permit is not required for this size of system. The waste water design flows were calculated using section 43.6 of the Garfield County On-site Wastewater Treatment System Regulations. The design flow used per person is 75 gallons per day in accordance with Section 43.6.The assumed number of persons per bedroom is two for design purposes. Additional flows were taken into account for additional fixtures in the bams and clubhouse. These daily flows where used along with Section 43.7 ta determine the minimt¡m clistances between components of the OWTS and physical feature such as ponds and wells. Septic tanks will be used to bring the effluent to Treatment Level I (TLl). The minimum septic tank size was determined using section 43.9-Bl-aDesign Criteria and Components, Septic Tanks, Sizing Requirements, Table 9-l within the Garfield County On-site Wastewater Treatment System Regulations. The required soil treatment area (STA) was determined by section 43.10 of the Garfield County On-site Wastewater Treatment System Regulations. The dosing volume for each field is based on the industry standard dosing volume of seven times the piping volume of the STA receiving the effluent. The Orenco pump selection software was used to calculate the total dynamic head loss within the system This information was then used to specify an adequate pump. 4 2.1 North septic Field 2.1.1 Des^ign flow The North Septic System treats the wastewater flom the Maintenance Barn and Horse Barns 3, 4, and 5. The Maintenance Barn has two rtwelling units, with two bedrooms each, totaling four bedrooms. The Horse Barns will have one dwelling unit with two bedrooms per barn. The total number of bedrooms for this system will be ten (10). - l0 Bedrooms x 2 people x 75 gallons per day : 1,500 gallons per day The Maintenance Bam and Horse Barns will have extra bathrooms/lavatories for employees. The Horse Barns were estimated to have five people using the bathroom three times a day. The Maintenance Bam was estimated to have eight people using the bathroom three times a day. The water use per bathroom visit is 2 gallons based on fixture flows. The additional bathrooms do not include showers, only toilets and sinks. - Maintenance Bam: 8 people x 3 uses x 2 gallons =48 gallons per day - Horse Bam: 5 people x 3 uses x 2 gallons = 30 gallons per day - 3 Horse Barns * 1 Maintenance Bam = 138 gallons per day Total flows = 138 gallon per day + 1,500 gallons per day : 1,638 gallons per day I r_ Z.1.zSe¡rti<"I'anl<sizin¡¡ I Y /^ "/ For ten bedrooms, the minimum tank size is2,750 gallons. One single chamber 2,000-gallon tank will be connected to another 1,000-gallon two compartment tank. This septic tank will bring the effluent to Treatment Level 1 (TLl) before it is pumped to the STA. 2.1.3 Soil'Ireatment Area Sizing Due to the high ground water observed in the north field test pits, the STA for north system will be a pressure dosed sand mound, in a bed contìguration, with low profile Quick 4 infiltrators. This area has approximately removed. Then 12 inches of top soil overlaying the natural Type 1 soil. This top soil layer will be layer of sand, meeting ASTM 33, will be added. The infiltrators will sit on top of the sand and be with a minimum of 10 inches of onsite material. The final layer will be topsoil. With the implementation of the 2-foot layer of sand an LTAR of 1.0 shall be used. Using the design flow of 1,638 gallons per day and the LTAR of 1.0 gallons per day per square foot, it was determined that the minimum STA is 1,147 square feet. This area calculation takes into account the reduction factors applied for the application of low profile Quick 4 infiltrator chambers (0.7 )rfrT ) t47 4t¿ lr ?sf r 1bt;i, I fî tl..¡rdt'w t are provided in the appendix.1\û48 11,ï 3 F1T" uù lrlf4tQuick 4 Plus infìltrators will be used They will be configured in a bed formation of four 24.This does not exceed the maximum width of 12 feet :_:^:i'ï,",",""1,frÌ"ffi2.1.4 Setbacl<s According to GarfÌeld County regulations. The north STA must well. The onsite well is942feet from the north STA. The STA must also not be within 100 feet of any ponds. The nearest lined pond is 230 feet away. N 5.S. flr*l,tl *17")"olô 6nÐìa 2.1.5 Di.stribution and Dosing The north STA will be pressure dosed. The second chamber of the 1,O00-gallon tank will house the Orenco pump and float tree. The pump will discharge into a pressurized two-inch PVC distribution pipe leading to the Alternating Distribr¡tion Valve (ADV). The distribution line contains 21 gallons. This line is sloped back toward the tank so the effluent will drain back into the pump basin when the pump shuts off and the air release valve opens. This is done to prevent freezing and stagnant fluid sitting in the line. The ADV is at the high point in the line and will alternate flow between the two zones which allows one half of the field to rest while the other half is being dosed. From the ADV the flow will pass though the 1.5-inch PVC manifold connected to the laterals. This manifold has a volume of approximately three gallons. The laterals are also 1.5-inch diameter PVC that are suspended within the chambers. Each lateral has 24 chambers and is 96 feet long. There are 2 laterals per zone with a volume of approximaTely 20 gallons. This bring the total piping volume after the ADV to approximately 23 gallons. A dosing volume was determined by using the industry standard of seven times the lateral piping volumes of one zone, plus any drain back. Each zone has two laterals with a volume of 20 gallons while the distribution line has a volume of 21 gallons. Therefore, each zone should be dosed at approximately 163 gallons. The elevations of the floats in the dosing chamber have been set to meet this dosing volume. See the appendix for dosing calculations and OWTS drawings. 2.1.6 Head Loss The Orenco pump selection software was used to determine the total head loss for the system. Using the distribution pipe material, size and length, orifìce size and spacing, bends, the ADV model, the max elevation lift, the manifold and the lateral piping configurations, a system curve was created. From this, the minimum pumping requirements were determined. A system curve is provided in the appendix. 2.1.7 Pttrnp Selection The pu¡rp selected for the north systcm is thc Orenco PFEF-SO-B.  pump curve, along with product information, can be found within the appendix. 3.0 Maintenance The Owner will follow the operation and maintenance required in Section 43.14 of the Garfield County On-site Wastewater Treatment System regulations. This section can be found in the appendix. Below is a maintenance schedule for each OWTS. Cleanin F ue Gleaned or PumpedInspection/MaintenanceType of Component Every 2 Years, or As Needed Every 2 YearsSeptic Tanks Every 6 Months N.A-Absorption Areas Every 4 Years Every 6 MonthsDosing or Pumping Chambers 6