Loading...
HomeMy WebLinkAboutBuilding Foundation Letter 01.25.2018KAUP ENGINEERING INC. 1 129 Grand AvenuÉ Glenwood Springs, CO 81601 (970) 945-981s Fuse Architecture P.O. Box4525 Basalt, CO 816021 January 25,2018 RE: Binbilla Bldg Foundation, Garfield County, CO Dear Jason Per your request I reviewed the option of pouring the tie footings monolithic with the concrete slabs. The original detail is 5/52.1. This will be acceptable based on the assumption of adequate bearing soils as stated in the General Notes on S2.1. ln addition, a control joint shall be added at each side of the thickened monolitic footing at the point it transitions to the thinner slab. Please callwith any questions or comments.