Loading...
HomeMy WebLinkAboutOWTS Installation Observations 09.04.2018MOUNT¡TIN CROSS ENGINEERING, INE. Civil and Environmental Consulting and Design September 4,2018 Mr. Andy Schwaller Garfi eld County Planning 108 8th Street, Suite 401 Glenwood Springs, CO 81601 9e, Nu ?1 5 Wt5 Rn> DearAndy , |'î-fr 'Øb- /S - 6 3Ôb The purpose of this correspondence is to confirm the design and construction of the OV/TS for the residence located ar 1244 County Road 106 in Carbondale. RE: Review of OWTS for 1244 County Road 106 pSræt1 On May 29, 2018 the percolation rate was determined to be 32 minutes per inch. This was congruent with the assumed soils infiltration rates and soil classification used for the design. Review ofthe profile hole showed that there was no bedrock or free water table within the leaching area. On Tuesday, August 14,2018 and on Thursday, August 30,2018, Mountain Cross Engineering, Inc. inspected the OWTS construction. In the professional opinion of Chris Hale, as a professional engineer licensed in thc State of Colorado, #35964, and a representative of Mountain Cross Engineering, Inc, it appeared to be installed per the plans prepared by Mountain Cross Engineering, Inc. Feel free to call if any of the above needs clarification or if you have any questions or comments. Sincerely, Moun Cross Hale, PE C: Mr. Andy Braudis via email Inc. 8261/zGrand Avenue, Glenwood Springs, CO 81601 P: 970.945.5 544 F : 970.945.5558 www.mountaincross-eng.com 1244 Satank Page2 of2 September,2018 G Mountain Cross Engineering. lnc. Civil and Environmental Consulting and Design 8261/2Grand Avenue, Glenwood Springs, CO 81 601 P: 970.945.5 544 F : 970.945.5558 www.mountaincross-eng.com