Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT B LCO-03-18-5 t62 an d SE PT-08-1 8-5427 Gianinetti Family LLP Community Event Center 343 County Road L66, Carbondale L) WORK SHALL COMPLY WITH 20L5 l.B.C. ,|.F.C.,1.P.C., l.M.C., l.F.G.C., AND 2009 l.E.C.C., AN D MAN U FACTU RER,S I NSTALLATION SPECI FICATIONS. 2) ALL WORK SHALL COMply W|TH THE REQUIREMENTS OF "RURAL" ZONE DISTRICT AS DEFINED IN GARFIELD COUNW,S LAND USE & DEVELOPMENT CODE, AS WELL AS ALL CURRENT LAND USE CHANGE PERMITS. 3) COMply W|TH ALL REQUTREMENTS AND CONDTTIONS AS ISSUED lN THE FLOODPLAIN DEVELOPMENT PERMIT (PERMrT # FDPA-5-18-8653). A FLOODPLAIN ELEVATION cERTtFtCATE (FEMA FORM 81-31), SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR, IS REQUIRED PRIOR TO FRAMING INSPECTION TO VERIFY FLOOR ELEVATION tS A MtNtMUM OF L2 INCHES ABOVE FLOODPLAIN ELEVATION (ACTUAL ELEVATION = 6101.5'). 4') BUILDtNG tS PERM|TTED AS CONSTRUCTION TYPE "V-8" (NON-SPRINKLERED) WITH occupANcy GROUp 'A-2" (ASSEMBLY) COMMUNITY EVENT CENTER/BANQUET HALLS. 5) THE EX|ST|NG BUtLDtNG SHELL WAS PREVTOUSLY ERECTED AS A NON-PERM¡TTED AGRICULTURAL STRUCTURE. IN ORDER TO CHANGE USE OF THE BUILDING FROM AGRICULTURAL USE TO A COMMUN¡W EVENT CENTER, THE EXISTING STRUCTURE MUST BE REVIEWED BY A COLORADO LICENSED PROFESSIONAL ENGINEER TO CERTIFY THAT THE STRUCTURE COMPLIES WITH GARFIELD COUNTY,S MINIMUM BUILDING REQUIREMENTS AND 2015 I.B.C. PROVISIONS. PROVIDE ENGINEER,S WET.SEALED CERTIFICATION REPORT AT FRAME INSPECTION. 6) CONTACT LOCAL FtRE D|STR|CT FOR PERTINENT LF.C. REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 7l LOCKS, LATCHES AND LANDINGS PER 2015 l.B.C., SECTION L008. 8) ACCESSIB|LTy REQUTREMENTS pER 20L5 l.B.C., CHAPTER LL AND tCC/ALL7.L-2009 ACCESSTBILITY STANDARDS. APPLICABLE ITEMS INCLUDE: PARKING, ACCESSIBLE ROUTE, S¡GNAGE AND ENTRY. 9) LrGHT AND VENTILATION PER 2015 l.B.C., CHAPTER 12. 10)ELECTRTCAL pERMtTTtNG & TNSPECTTONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION, AND ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.