OAK MEADOWS PUMP STATION
FOLINDATION FOOTERS
I hereby certify that on June 16 and 17,2014I observed the installation of the
reinforcing steel for the concrete floor and footers of the Oak Meadows Pump
Station Building. All work was accomplished in accordance with the plans and
specifications.
Jerome F. Gamba
PE & LS 5933
{,ç.Äi:
?
Õ't'or r.{r;.
GltMBA& assoctAïEs
CONSULTING ENGINEERS
& LAND SURVEYORS
Pr{oNr: 97O/94S-255O
F^x, 970.1945-l4tO
t te xrNr; sTREET,
sutrr 214
P.(). El(rx 1458
GLENwooD SPRINGS,
CoLoRADo Al602-1454
24 TIJNE2OT4
OAK MEADOWS PUMP STATION
FOTINDATION ICF WALLS
I hereby certify that on June 18, 19, 20 and 24, 2014I observed the installation of
the ICF (Insulated Concrete Form) units for the foundation walls of the Oak
Meadows Pump Station Building. The ICF units used were manufactured by
Amvic Building System. I was provided with and I reviewed a product
specification sheet and an installation process technical manual from the
manufacturer by the contractor.
The ICF units were installed in accordance with the plans and specifications
prepared by Gamba & Associates, Inc. and in accordance with the installation
process technical manual provided by Amvic Building Systems. The reinforcing
steel and the wall penetration units were placed in the ICF units in accordance
with the plans, specifications and installation manual.
.il (+.
*..i, \-
ú¡ü rs"G to*
Jerome F
PE & LS 5933
Gl\MBA& ÃssoctaTEs
CONSULTING ENGINEERs
& LAND SURVEYORS
WWW.GAMBAEN6INEERINC.COff
PHoNE: 970.1945-2550
t^xr 97o.t945-141O
I Ig NINTH STREET,
sutÌE 214
P,O. Box 1458
GLEl\lrJvOOD SPRINGS,
CoLoRADo Al6()2-1454
I JULY 2014
OAK MEADOWS PUMP STATION
FOTINDATI ON WATERPROOFING
I hereby certify that on July 1, 20141observed the installation of waterproofing
measures for the foundation and foundation walls of the Oak Meadows Pump
Station Building. I observed the installation of Grace Ice and Water Shield along
all portions of the foundations and ICF walls which were to receive earth backfill.
Following the installation of the Grace Ice and Water Shield mernbrane, I also
observed the installation of a protective barrier placed against the waterproofing
membrane whrch was requred to protect both the watetproofing membrane anci
the foam insulation on the ICF units. All work was accomplished in accordance
with the plans and specifications.
¡':
f - | -:
. ¿-;¡ ,;1 i.-r'.- tìl
{i,
Jerome F. Garnba
PE & LS 5933
GAMBA& assoc¡ATEs
gONSULTING ENGINEERS
& LAND SURVEYORS
PHoNE: 970/945-2550
F^xr 97O1945-t4lO
I I3 NINTH STREET,
surrE 2f 4
P.O. B('x 1458
GLENI,VOOÞ SPRTNGS,
coLoRAÞo 4t602-1454
24 TULY 2OT4
OAK MEADOWS PUMP STATION
DRYWALL INSTALLATION
I hereby certify that on JuIy 24,2014I observed the installation of the water
resistant drywall board on the interior walls and ceiling of the Oak Meadows
Pump Station Building. Thc drywall board was secured to the ICF walls with
drywall screws. All work was accomplished in accordance with the plans and
specifications.
Jerome F. Gamba
PE & LS 5933
,)
tìl 6'
GAMBA
& assoqtATES
qONSULT¡NG ENGINEERS
& LAND SURVEYORS
PHoNE: 970./945-2550
F^x, 97o.1945-t4to
I I3 NINTH STREET,
surrE 2f 4
P.O. B('x 1458
(¡LENwooD SPRINcS,
CoLoRADo Al602-1454
1O SEPTEMBER 2014
OAK MEADOWS PUMP STATION
ROOF FRAMING
I hereby certify that
1. The prefabricated roof trusses were installed on top of the building walls
and secured to the structural attachment members with screws on July 3
andT with specified cross bracing.
2. The fire retardant plywood sheeting was attached to the roof trusses with
screws and was completed on July 11.
3. The waterproof membrane was attached to the plywood with screws and
was completed on July 16.
4. The steel roof panels were attached to the roof with screws and were
completed by July 30.
5. The Styrofoam insulation containment barriers on top of the side walls
were installed on September 8.
All roof structure work was accomplished in accordance with the plans and
specifications.
,:.¡Ð ¡'l
d)
l¡,Í åf #rü *"#
Jerome F. Gamba
PE & LS 5933
tt
GAMBA
& assoclalEs
CONSULfING ENGINEERS
& LAND SURVEYORS
PHoNE: 97O/945-2SSo
FAxi 970./945-14tO
I I3 NINTH STREET,
sutrÉ,214
P.O. Box 1458
GLENWOOD SPRtNGS,
CoLoRADo al602-1454
March Zt,20Ls
OAK MEADOWS PUMP STATION
RE: INSPECTION CERTIFICATION OF ROOF INSULATION
To Whom It May Concern
I hereby certify that on March 2L,20LS I observed the insulation previously
installed within the roof structure of the Oak Meadows Pump Station
Building. All work was accomplished in accordance with the building plans
and specifications.
Please contact us if you have any questions or need additional information
Sincerely,
Gamba & Associates, Inc.
4 ,lÍYD P
,rrtttlttl
Michael Gamba, P.E. & P.L.S. 28036
H:\0 3 3 85\0 6\0 6B 2\Co n-struction 0bservation\lnspection Report - Roof Insulatio n.doc