Loading...
HomeMy WebLinkAboutEngineer ReportsGAMBlt & ASSOCIATES CONSULTING ENGINEERS & LAND SURVEYORS PHoNE: 970/945-2550 FAx. 970t945-l4lO a f I3 NINTH s¡TREET, sutrE 214 P.O. Box 1458 GLENWOOD SPRIN(¡S, CoLoRADo Al602-f454 17 JUNE 2014 OAK MEADOWS PUMP STATION FOLINDATION FOOTERS I hereby certify that on June 16 and 17,2014I observed the installation of the reinforcing steel for the concrete floor and footers of the Oak Meadows Pump Station Building. All work was accomplished in accordance with the plans and specifications. Jerome F. Gamba PE & LS 5933 {,ç.Äi: ? Õ't'or r.{r;. GltMBA& assoctAïEs CONSULTING ENGINEERS & LAND SURVEYORS Pr{oNr: 97O/94S-255O F^x, 970.1945-l4tO t te xrNr; sTREET, sutrr 214 P.(). El(rx 1458 GLENwooD SPRINGS, CoLoRADo Al602-1454 24 TIJNE2OT4 OAK MEADOWS PUMP STATION FOTINDATION ICF WALLS I hereby certify that on June 18, 19, 20 and 24, 2014I observed the installation of the ICF (Insulated Concrete Form) units for the foundation walls of the Oak Meadows Pump Station Building. The ICF units used were manufactured by Amvic Building System. I was provided with and I reviewed a product specification sheet and an installation process technical manual from the manufacturer by the contractor. The ICF units were installed in accordance with the plans and specifications prepared by Gamba & Associates, Inc. and in accordance with the installation process technical manual provided by Amvic Building Systems. The reinforcing steel and the wall penetration units were placed in the ICF units in accordance with the plans, specifications and installation manual. .il (+. *..i, \- ú¡ü rs"G to* Jerome F PE & LS 5933 Gl\MBA& ÃssoctaTEs CONSULTING ENGINEERs & LAND SURVEYORS WWW.GAMBAEN6INEERINC.COff PHoNE: 970.1945-2550 t^xr 97o.t945-141O I Ig NINTH STREET, sutÌE 214 P,O. Box 1458 GLEl\lrJvOOD SPRINGS, CoLoRADo Al6()2-1454 I JULY 2014 OAK MEADOWS PUMP STATION FOTINDATI ON WATERPROOFING I hereby certify that on July 1, 20141observed the installation of waterproofing measures for the foundation and foundation walls of the Oak Meadows Pump Station Building. I observed the installation of Grace Ice and Water Shield along all portions of the foundations and ICF walls which were to receive earth backfill. Following the installation of the Grace Ice and Water Shield mernbrane, I also observed the installation of a protective barrier placed against the waterproofing membrane whrch was requred to protect both the watetproofing membrane anci the foam insulation on the ICF units. All work was accomplished in accordance with the plans and specifications. ¡': f - | -: . ¿-;¡ ,;1 i.-r'.- tìl {i, Jerome F. Garnba PE & LS 5933 GAMBA& assoc¡ATEs gONSULTING ENGINEERS & LAND SURVEYORS PHoNE: 970/945-2550 F^xr 97O1945-t4lO I I3 NINTH STREET, surrE 2f 4 P.O. B('x 1458 GLENI,VOOÞ SPRTNGS, coLoRAÞo 4t602-1454 24 TULY 2OT4 OAK MEADOWS PUMP STATION DRYWALL INSTALLATION I hereby certify that on JuIy 24,2014I observed the installation of the water resistant drywall board on the interior walls and ceiling of the Oak Meadows Pump Station Building. Thc drywall board was secured to the ICF walls with drywall screws. All work was accomplished in accordance with the plans and specifications. Jerome F. Gamba PE & LS 5933 ,) tìl 6' GAMBA & assoqtATES qONSULT¡NG ENGINEERS & LAND SURVEYORS PHoNE: 970./945-2550 F^x, 97o.1945-t4to I I3 NINTH STREET, surrE 2f 4 P.O. B('x 1458 (¡LENwooD SPRINcS, CoLoRADo Al602-1454 1O SEPTEMBER 2014 OAK MEADOWS PUMP STATION ROOF FRAMING I hereby certify that 1. The prefabricated roof trusses were installed on top of the building walls and secured to the structural attachment members with screws on July 3 andT with specified cross bracing. 2. The fire retardant plywood sheeting was attached to the roof trusses with screws and was completed on July 11. 3. The waterproof membrane was attached to the plywood with screws and was completed on July 16. 4. The steel roof panels were attached to the roof with screws and were completed by July 30. 5. The Styrofoam insulation containment barriers on top of the side walls were installed on September 8. All roof structure work was accomplished in accordance with the plans and specifications. ,:.¡Ð ¡'l d) l¡,Í åf #rü *"# Jerome F. Gamba PE & LS 5933 tt GAMBA & assoclalEs CONSULfING ENGINEERS & LAND SURVEYORS PHoNE: 97O/945-2SSo FAxi 970./945-14tO I I3 NINTH STREET, sutrÉ,214 P.O. Box 1458 GLENWOOD SPRtNGS, CoLoRADo al602-1454 March Zt,20Ls OAK MEADOWS PUMP STATION RE: INSPECTION CERTIFICATION OF ROOF INSULATION To Whom It May Concern I hereby certify that on March 2L,20LS I observed the insulation previously installed within the roof structure of the Oak Meadows Pump Station Building. All work was accomplished in accordance with the building plans and specifications. Please contact us if you have any questions or need additional information Sincerely, Gamba & Associates, Inc. 4 ,lÍYD P ,rrtttlttl Michael Gamba, P.E. & P.L.S. 28036 H:\0 3 3 85\0 6\0 6B 2\Co n-struction 0bservation\lnspection Report - Roof Insulatio n.doc tl \i la, RT *