Loading...
HomeMy WebLinkAboutEngineer's Field Observation Report 10.30.18KURTZ & ASSOCIATES, INCORPORATED Structqral Consultants 5012 County Road 154 Phone & Fax (970) 945-6305 Glenwood Springs, CO 81601 FIELD OBSERVATION REPORT To Julio Sandoval 50 Cliffrose Way Glenwood Springs, Co Date: 1Ol3Ol2O18 Re: Boulder Retaining Walls 50 Cliffrose Way Pinyon Mesa Subdivision THE FOLLOWING WAS OBSERVED: The purpose of this field observation was to observe the completed construction of a series of drystack boulder retaining walls adjacent to the residence. At this time the house construction is complete and the adjacent boulder retaining walls are complete. On the south side of the house the wall is a two tier boulder wall. On the east side of the house, directly adjacent to the property line, the boulder wall is approúmately 90 feet long. The north most 30 feet of wall is a single tier that is less than 4 feet tall. The next section is 20 feet long and is a single tier which is approximately 4'-6" tall. The southernmost is a two tier wall by approximately 20 feet long. Both the east boulder wall and the south boulder wall are well constructed and have been built with a below grade 'French drain.' At the southeast corner of the boulder wall system the final subgrade has been cut approximately 16" to 18" below the boulder bearing elevation. I recommend that an additional lower course of boulders (approximately 2 foot square) be installed at the base of the eústing wall at this corner. The additional lower course should extend approximately 13 feet to the west and 15 feet to the north, respectively, from the southeast corner. A,ll other aspects of the boulder wall construction are structurally acceptable. 18V44 å 6 v 4