HomeMy WebLinkAboutOWTS Installation Observations 11.02.18 November 2, 2018 Project No. C1387 Karla Miller nativeflower@me.com Onsite Wastewater Treatment System (OWTS) Installation Observations 110 Weeping Willow Lane Garfield County, Colorado Permit Number SEPT-07-18-5353 Karla, ALL SERVICE septic, LLC observed the installation of the onsite wastewater treatment system (OW TS) on September 21 and October 25, 2018 for the subject property. Nathan Moffat installed the system. The existing septic tank was properly abandoned by pumping and filling with on-site soils. A double-sweep clean out was installed on the existing sewer line exiting the main residence. The 2-inch diameter pump line from the Barn/ADU enters the sewer line between the main residence and the new septic tank at a high point. A new 1500-gallon, two-compartment septic tank with an Orenco® Biotube Pump Vault and an Orenco® PF5005 pump in the second compartment of the septic tank was installed. The septic tank was anchored with Deadmen because of the high seasonal groundwater table. The floats were set to dose approximately 80 gallons each pump cycle (allowing approximately 5 gallons for drain back). The control panel for the pump was located within line of sight of the septic tank. Valley Precast out of Buena Vista performed start-up of the pumping system. At the time of our October 25, 2018 site visit, we tested the pumping system and flushed the laterals. The existing footprint of the mound was modified by removing the existing chambers and replacing them with a pipe and gravel distribution system, with the new footprint resulting in a min. 3-foot deep unlined, mounded sand filter with a footprint of 9’ x 67’. Laterals used to disperse the effluent were surrounded by washed coarse screened gravel or crushed stone. The manifold was 1.5-inches in diameter. Laterals were 1.5- inches in diameter with 5/32-inch diameter orifices facing down, spaced 3-feet on center. Orenco® Orifice Shields were installed under each orifice. Each 1.5-inch diameter lateral ends in a sweeping ell facing up with a ball valve for flushing. A soil separation fabric was placed over the gravel layer followed by approximately 1-foot of topsoil or other suitable soil able to support vegetative growth. The OWTS was generally installed according to specifications. This observation is not a guarantee of workmanship and/or parts and materials. ALL SERVICE septic, LLC should be notified if changes are made to the OWTS in the future. Any additional OWTS construction must be according to the county regulations. LIMITS: Observations are limited to components that are visible at the time of the inspection. The installer must have documented and demonstrated knowledge of the requirements and regulations of the county in which they are working. The quality of the installation is dependent of the expertise of the installer, soil type, and weather conditions. Please call with questions. Sincerely, ALL SERVICE septic, LLC Reviewed By: Carla Ostberg, MPH, REHS Rebuilt mound orifices in laterals Septic tank installation Deadmen (anchoring) Tank anchored laterals laid out Clean out / high point of pump line from ejector pump New septic tank final grading over mound Flushing valves and inspection ports PERMIT KEEP AVAILABLE AT PROJECT SITE Project Address ____________________________________________ Parcel No. ________________________ Subdivision _________________________________ Lot _______ Section-Township-Range ____________ Owner Name ______________________________________________ Owner Phone _____________________ Owner Mailing Address _______________________________________________________________________ Contractor(s) ______________________________________________ Contractor Phone _________________ Work Description: Valuation _________________________________ Square Feet _______________________________ IMPORTANT: APPLICATION IS HEREBY MADE TO THE BUILDING OFFICIAL FOR A PERMIT SUBJECT TO THE CONDITIONS AND RESTRICTIONS SET FORTH ON THIS APPLICATION. PLEASE NOTE: Final inspection of the work authorized by this permit is required. A Certificate of Occupancy must be obtained prior to use and occupancy of new buildings and structures. A Building Permit becomes null and void if the authorized work is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. Permit Type ____________________________________ Work Classification _____________________________ Issue Date ___________ Expiration Date ___________ PERMIT # Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Phone (970) 945-8212 1/30/2019 36-07-88 Septic - ALT/ Repair 970 379 9432 Crystal Constructors Inc. ROARING FORK PRESERVE 110 WEEPING WILLOW LANE, CARBONDALE, CO, 81623 970 379 1096 Septic alteration for additional dwelling unit SEPT-07-18-5353 239336319007 Alteration 8/3/2018 MILLER, KARLA H 110 WEEPING WILLOW LANE, CARBONDALE, CO, 81623 832‐R‐13‐002