HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-10-18-5517
Glenwood Caverns: Phase 1 Tramway Addition
1850 Transfer Trail Road — Glenwood Springs, Colorado
1) ALL WORK SHALL COMPLY WITH THE 2015 IBC, IMC, IPC, IFGC, IFC, 2009 IECC, AND IN
ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS & REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS, PLAN
REVIEW COMMENTS AND/OR REDLINES, AND INSPECTIONS POLICY.
3) WORK SHALL COMPLY WITH ALL CONDITIONS OF THE SPECIAL -USE PERMIT AND "RURAL"
ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE.
4) ARCHITECT OF RECORD TO SUBMIT REVISED EGRESS PLANS AS PART OF PHASE II
SUBMITTALS.
5) BUILDING APPROVED AS TYPE II -A CONSTRUCTION, FULLY FIRE-SPRINKLERED (PHASE II)
WITH THE FOLLOWING OCCUPANCIES: FACTORY INDUSTRIAL (GROUP F-2), BUSINESS
(GROUP B) & STORAGE (GROUP S-2).
6) CONTACT LOCAL FIRE DISTRICT FOR INTERNATIONAL FIRE CODE 2015 (IFC) REQUIREMENTS
AND OPERATIONAL PERMITS. PROVIDE COPY OF BUILDING PERMIT DRAWINGS TO FIRE
DISTRICT FOR REVIEW & SIGN -OFF. FIRE DISTRICT'S FINAL APPROVAL REPORT IS REQUIRED
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
7) SPECIAL INSPECTIONS PER CHAPTER 17 IBC ARE REQUIRED.
8) PROVIDE SAFETY BARRIERS TO CONSTRUCTION AREAS PENDING PHASE II WORK.
9) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11, AND ICC ANSI 117.1-2009.
TOILET FACILITIES SHALL COMPLY WITH ICC ANSI 117.1-2009, SECTIONS 603-609 (PHASE II).
10) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AIR, DUCTWORK & VENTING
REQUIREMENTS PER INTERNATIONAL MECHANICAL CODE (IMC) AND IECC, SECTION 503.
MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION.
11) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING
ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
12) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE
OF OCCUPANCY.
13) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO
ELECTRICAL ROUGH -IN INSPECTION (PHASE II).