HomeMy WebLinkAboutEngineer's Letter 10.14.2018October 14, 2018 Garfield County Building Department Dave Argo Plans Examiner 108 8th Street, Suite 401 Glenwood Springs, CO 81601 RE: Glenwood Caverns Adventure Park — Phasing Narrative Dear Dave, RAMWAY ENGINEERING. LTD. P.O Drawer 398 Glenwood Springs, CO 81602 97n 945.5138 www.Tramwrar.ner RECEIVED OCT 17 2018 GARFIELD COUNTY COMMUNITY DEVELOPMENT Per our conversation on October 5th, I have created the attached addendum to the plan set submitted for your review. This addendum is specifically intended to demonstrate how the flow of staff and guest will be managed during the period between Phase I completion and Phase II completion. Attached Drawings: AS1 — Phase I Completion South Elevation & Site Plan Flow AS2 — Phase I Lower Floor Plan AS3 — Phase I Main Floor Plan Phasing Narratives: Phase I will include all foundation work, structural steel, structural steel decking and concrete slabs. The new aerial tramway (by Leitner-Poma) and gondola loading deck will be completed for public use during this initial phase. The upper slab of the loading deck will have radiant heat tubing installed into the concrete slab, but the boiler for heat circulation will not be installed until Phase II. With the exception of the lower floor electrical room, the grip bay building west of gridline C will be left unfinished with only the foundation, steel, decking and concrete slabs completed. The lower floor electrical room (shown on sheet AS2) will be dried in and completed per the submitted plan set to house the required drive systems and electrical equipment needed to operate the new tramway. Egress from the electrical room will be via two egress exists that will merge under the gondola loading deck into a common pathway. The electrical room exit door onto the finished lower level concrete slab will be directed by temporary wooden guardrails to the above mentioned pathway. A temporary barrier wall at the main level will restrict guest access into the uncompleted grip building west of gridline C. Phase II will include the completion of the light gauge walls, siding, insulation, drywall, roof assemblies, sprinkler system and all mechanical, plumbing and electrical P.O. Box 398 • Glenwood Springs, CO 81602 • (970) 945-5138 • FAX (970) 945-5138 Glenwood Caverns Adventure Park Gondola Upgrade Building Construction Phasing equipment. It will also include the closure wall under the south edge of the loading deck. This phase will finish the grip bay, storage and office areas for occupancy. During this phase the temporary roof will be removed from the electrical room and it will become part of the interior finished space. Please review and let me know if you have any questions or concerns on the attached herein. Regards, ad-u4A0t) Jeff Peterson, P.E. Design Engineer Tramway Engineering P.O. Box 398 • Glenwood Springs, CO 81602 • (970) 945-5138 • FAX (970) 945-5138 0Q r -t 111111111111111 Phase I -Framing Phase II Completion Temp Wall Between Grip Bay Bldg & Loading Deck Phase I Loading Deck L Existing Building Gondola Line Queue (Park Exit) Park Entrance G� Phase I Completion S. Elev SCALE: 1" = 20'-0 ' SHOOTING GALLERY BLDG. Existing Plaza Covered Stage Children's Sand Pit 0 Ferris Wheel 10 20 Maze Caverns Site Plan SCALE: 1" = 40'-0 0 5 10 N JOB #: 875-015 DATE: 10/14/18 SCALE: Varies REV.: 0 \HEET: AS1 ENG.: JAP Gondola Replacement Main Floor Phase I Glenwood Caverns IT EMON IERON21 LTD, P O BOX 398 GLENWOOD SPRINGS, COLORADO 81602 (970) 945-5138 FAX 945-5135 Steel Awning 0,51- 27'4' f � 27'-8` d—. Steel Awing Future Offices {86'-4) • Ramp or Step to Egress Pathway per MK [. RequIre ments.— Phase II Le80'nrling -1 Phase II No Access r Approldmate Clearance From FIvol to Bottom of Stair as it Crosses Railing - 64 Temporary Spilt Wood Railing Future Training Room (00'4) Phasel- Electrical Room Porna Drives Phase I Line of Deck Above Phase I Egress Pathway f—-1 L Dirt Egress Path. Slope No Greater than 1:12 LJ Poma Foundation L LA LJ L — J L11t'' `-;p;tr_r' r LJ Conc Landing Pad 88'-3 Phase I Lower Floor Plan SCALE: 1" = 10'-0 0 5 10 I JOB #: 875-015 DATE: 10/14/18 SCALE: 1" = 10'-0 REV.: 0 \SHEET: AS2 ENG.: JAP Gondola Replacement Lower Floor Phase I Glenwood Caverns GA1Mty MAV EMCCIREC NIO a, LTD. P O. BOX 399 GLENWOOD SPRINGS, COLORADO 81602,} (970) 945-5138 FAX 945-5138 Steel Awning_ Sorel Awning mase n Phasei Future Grip Bay (9B'-10) Up Dwn Own Landing 1QD.-0 Phase II No Access Future Storage (100'-0) Ralling-1 Edge of Loading Deck.—N Railing— Phase I Loading Deck Open to Public iPoma (Foundation Railing Temporary Barrier Wall Between Gondola Deck and Glass Future Building. Railing Existing Entrance onto Loading Deck. Existing Exist Loading Deck. Gondola Platform Step Phase I Main Floor Plan 1• — SCALE: 1" = 10'-0 0 5 10 Open to Grade Below Existing Plaza JOB #: 875-015 DATE: 10/14/18 SCALE: 1" = 10'-0 REV.: 0 �HEET: AS3 ENG.: JAP Gondola Replacement Main Floor Phase Glenwood Caverns RANW A7 EMOON [ RONG, LTD. P O BOX 39B GLENWOOD SPRINGS, COLORADO 01602 (970) 945-5138 FAX 945-5138