Per our conversation on October 5th, I have created the attached addendum to the plan
set submitted for your review. This addendum is specifically intended to demonstrate
how the flow of staff and guest will be managed during the period between Phase I
completion and Phase II completion.
Attached Drawings:
AS1 — Phase I Completion South Elevation & Site Plan Flow
AS2 — Phase I Lower Floor Plan
AS3 — Phase I Main Floor Plan
Phasing Narratives:
Phase I will include all foundation work, structural steel, structural steel decking and
concrete slabs. The new aerial tramway (by Leitner-Poma) and gondola loading deck
will be completed for public use during this initial phase. The upper slab of the loading
deck will have radiant heat tubing installed into the concrete slab, but the boiler for heat
circulation will not be installed until Phase II. With the exception of the lower floor
electrical room, the grip bay building west of gridline C will be left unfinished with only
the foundation, steel, decking and concrete slabs completed. The lower floor electrical
room (shown on sheet AS2) will be dried in and completed per the submitted plan set to
house the required drive systems and electrical equipment needed to operate the new
tramway. Egress from the electrical room will be via two egress exists that will merge
under the gondola loading deck into a common pathway. The electrical room exit door
onto the finished lower level concrete slab will be directed by temporary wooden
guardrails to the above mentioned pathway. A temporary barrier wall at the main level
will restrict guest access into the uncompleted grip building west of gridline C.
Phase II will include the completion of the light gauge walls, siding, insulation, drywall,
roof assemblies, sprinkler system and all mechanical, plumbing and electrical
P.O. Box 398 • Glenwood Springs, CO 81602 • (970) 945-5138 • FAX (970) 945-5138
Glenwood Caverns Adventure Park
Gondola Upgrade
Building Construction Phasing
equipment. It will also include the closure wall under the south edge of the loading
deck. This phase will finish the grip bay, storage and office areas for occupancy.
During this phase the temporary roof will be removed from the electrical room and it will
become part of the interior finished space.
Please review and let me know if you have any questions or concerns on the attached
herein.
Regards,
ad-u4A0t)
Jeff Peterson, P.E.
Design Engineer
Tramway Engineering
P.O. Box 398 • Glenwood Springs, CO 81602 • (970) 945-5138 • FAX (970) 945-5138
0Q
r -t
111111111111111
Phase I -Framing
Phase II Completion
Temp Wall
Between Grip
Bay Bldg &
Loading Deck
Phase I
Loading Deck
L
Existing Building
Gondola Line
Queue (Park Exit)
Park
Entrance
G�
Phase I Completion S. Elev
SCALE: 1" = 20'-0
' SHOOTING
GALLERY
BLDG.
Existing
Plaza
Covered
Stage
Children's
Sand Pit
0
Ferris
Wheel
10 20
Maze
Caverns Site Plan
SCALE: 1" = 40'-0
0 5 10 N
JOB #: 875-015
DATE: 10/14/18
SCALE: Varies
REV.: 0
\HEET: AS1
ENG.: JAP
Gondola Replacement
Main Floor Phase I
Glenwood Caverns
IT
EMON IERON21 LTD,
P O BOX 398
GLENWOOD SPRINGS, COLORADO 81602
(970) 945-5138 FAX 945-5135
Steel
Awning
0,51-
27'4' f �
27'-8`
d—.
Steel
Awing
Future Offices
{86'-4) •
Ramp or Step to
Egress Pathway
per MK [.
RequIre ments.—
Phase II
Le80'nrling
-1
Phase II
No Access
r Approldmate Clearance From
FIvol to Bottom of Stair as it
Crosses Railing - 64
Temporary Spilt
Wood Railing
Future Training
Room (00'4)
Phasel-
Electrical Room
Porna Drives
Phase I
Line of
Deck
Above
Phase I
Egress Pathway
f—-1
L
Dirt Egress Path.
Slope No Greater
than 1:12
LJ
Poma
Foundation
L
LA
LJ
L — J
L11t'' `-;p;tr_r'
r
LJ
Conc Landing
Pad 88'-3
Phase I Lower Floor Plan
SCALE: 1" = 10'-0
0
5 10
I
JOB #: 875-015
DATE: 10/14/18
SCALE: 1" = 10'-0
REV.: 0
\SHEET: AS2
ENG.: JAP
Gondola Replacement
Lower Floor Phase I
Glenwood Caverns
GA1Mty MAV
EMCCIREC NIO a, LTD.
P O. BOX 399
GLENWOOD SPRINGS, COLORADO 81602,}
(970) 945-5138 FAX 945-5138
Steel
Awning_
Sorel
Awning
mase n
Phasei
Future Grip Bay
(9B'-10)
Up
Dwn Own
Landing
1QD.-0
Phase II
No Access
Future Storage
(100'-0)
Ralling-1
Edge of
Loading
Deck.—N
Railing—
Phase I
Loading Deck Open
to Public
iPoma
(Foundation
Railing
Temporary Barrier
Wall Between
Gondola Deck and Glass
Future Building. Railing
Existing Entrance
onto Loading Deck.
Existing Exist
Loading Deck.
Gondola
Platform Step
Phase I Main Floor Plan
1• —
SCALE: 1" = 10'-0
0
5 10
Open to Grade
Below
Existing
Plaza
JOB #: 875-015
DATE: 10/14/18
SCALE: 1" = 10'-0
REV.: 0
�HEET: AS3
ENG.: JAP
Gondola Replacement
Main Floor Phase
Glenwood Caverns
RANW A7
EMOON [ RONG, LTD.
P O BOX 39B
GLENWOOD SPRINGS, COLORADO 01602
(970) 945-5138 FAX 945-5138