October 9, 2018
Mr. Jim Wilson, Building Official
Garfield County Building Department
108 8'h street
Glenwood Springs, CO 81601
Casto Deck Expansion
L42Happy Dog Trail
Garfield County, Colorado
Dear Jim,
This letter is intended to follow up our discussion of the framing inspection that we have performed following the
framing completion of the Casto Deck Expansion. Note that the changes in the framing that are discussed as
follows do remain consistent with our design intent and we concur with the changes discussed and subsequently
made by Renninger Log Homes. Please note the following:
1. Post attachments to concrete: The provided detail was generally consistent with our proposed detail other
than the contractor did no provide the "squared" cut to the post at the bottom. What has been provided was
to not square the post but to "hide" the bolting by using a longer bolt for the post to knife plate connection.
This detail remains consistent and is architecturally superior to what was proposed.
2. The 2x10 treated ledger for the rafter support was not installed at the face of wall. lnstead, the ledger installed
was a 1 /o"x9/'" LVL beam that was attached to the tails of the existing outriggers and spans the length from
the existing ridge beam to the eve support beams. Thus the ledger not only functions in the 24" span to the
outriggers, but also serves as a rafter support beam. This configuration collectively carries the load to both the
existing west end wall of the house and spans to the ridge/eaves. With the combined support of both, this
detail is acceptable from our perspective.
3. The eave support for the north eave to tie into and be supported by the existing post was revised to have a
beam hanger installed for support rather than removing a portion of the existing eave beam. Ihis detail is also
acceptable from our perspective.
ipt a call with any questions.
RE
U
P
GLËNWOOD SPRINGS I lB Wesi Sixth St, Suite 200 | Glenwood Springs, CO 81601 | 970.945.10O4
SSGM
www.sgrr-lnc.com
July 25, 20L8
Mr. Jim Wilson, Building Official
Garfield County Building Department
108 8th Street
Glenwood Springs, CO 8160L
RE:Casto Deck Expansion
142 Happy Dog Trail
Garfield County, Colorado
Dear Jim,
This letter is intended to follow up our open hole investigation of July 24, 2Ot8 of the Casto Deck
expansion on the west side of the existing residence. At the time of our investigation, the contractor
had installed the "big foot" footings and sonotube piers per our expectations of our 6/27/78 drawing set
for the project. Work that remains is the installation of the 4#5 bar vertical reinforcing members to be
installed while they are pouring. We have received a copy of the reinforcing steel and the final
photograph of the reinforcing to be installed (ie., stabbed) into the piers/footings at the time of pour.
We concur with them moving forward to conduct this work'
Upon your rece review, call with any questions
llv,
Simonso PE, CFM
tn
GLFNWOOD SPRINGS I lB Wesi Sixth 5t, Suite 200 | Glenwood Springs, CO 8l601 | 970.945.1004
4*i-a
ESGM z
Cé'LCULATED BY 5 ç
GLËNWOOD SPRIN6S I ASPEN I SALTDA I DURANGO I GUNNTSON I GRAND JUNCTTON I MEEKER
a!1tt.,i1.l.z'.)t.:i:a..t:'t,., ,.tt,, I - ti.,.¡,:_ !,r.:rrì:r.r,
/'t'"
Y
l^lh,L .tq-
9,Æ69
fu"æ.E &'
€'r*ffi rlee
l|ê.ttdlr r¿
t' táíVt ¡l&2
*-ç'*
r1C u++r *+ þ&"
åJÁl d¿r"¡¿-r
X Ça(-
t4ç i\
ßÇ":
)NÈk
þ"ffit*y
C..',;1, t crr-4 t 4rhåL{!i>
{a
rî t
(ë
¡f\¡E.¡,sl
t It
7atltt fu#.ewLuf6*- ¿êQv.\
xln,,rrvg
& ';Zt)ta
r-¡tL"&Ë,."
t¿
/l
*+at9 çc
xç t \zlr eL
ltl*u *o*ç^. rö ç?þ{*
*ç & lT-)' çg
.*C A l2'( at .
I
:l*4
:
f4*lt ç&L(\â<
lae
T Pt€ *
4çer¿ä*\ À
{4''
6eq"r1 c¡.( ,&
4x
t,
I
Irl
PRO.'ÉCT.t\qw €e.a cnot #
ESGM "î-î ;, -¿*"
-
-- f -f¡;; ;ä -
w4t4
iltc-¡*a
u/*"l- I &'rt.f
b'
,
Rår.*rux*, Þ
FlÉ r r-r¡r
I
I
I
T
I
I
I
I
I
le-n
t\Ëg'u&çìç
t*
u.J*tç Q
ifftr{,s{t^f'
ff-€î:k-t616ç>
ñ\¿'ce 6ø*"tæ*
M"*;rrçrÅ* A & * *,¡..r {-
ê"Ê"lUfæ¿*/^¡(- €.e"@'r-*ç "
i
GLËNWOOD SpRrN6S I ASPEN I SALTDA I DURANCO I GUNNISON I GRAND JUNCTION I MÊEKER
''