Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-10-18-5529 Pipe Manifold Specialists Warehouse 3131 Hwy 13, Rifle, Colorado 1) ALL WORK MUST COMPLY WITH THE 2015 IBC, IMC, IPC, IFGC, IFC, 2009 IECC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK SHALL COMPLY WITH THE LAND USE PERMIT GAPA 07-18-8657. 3) BUILDING I5 APPROVED AS TYPE V -B CONSTRUCTION, S-1 OCCUPANCY. 4) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL REPORT IS REQUIRED FOR CO/FINAL INSPECTION. 5) CONTACT STATE ROW DEPARTMENT REGARDING ACCESS IMPROVEMENTS. FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 6) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REQUIRED AT FOOTING/FOUNDATION INSPECTION TO VERIFY BUILDING SETBACKS. 7) ACCESSIBILITY PER 2015 IBC, CHAPTER 11 AND ICC/ANSI A117.1-2003. 8) ALL HIGH STRNGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE AN APPROVAL REPORT AT FRAME INSPECTION. 9) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION. 10) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION.