Loading...
HomeMy WebLinkAbout2.0 CDOT Access Permit 12.22.2018COLORADO Department of Transportation Region 3 1 rattic Section, Access Unit 222 5 6th St, Rm 100 Grand Junction, CO 81501 PH (970) 683-6284 FAX (970) 683-6290 December 22, 2018 Permit No. 318085 Pipe Manifold Specialists, LLC 302 W. 33rd Street Rifle, Colorado 81650 Dear Permittee: 1. Please review the attached State Highway Access Permit (Form #101) and all enclosed attachments. 2. If you choose NOT to act on the permit, please return the permit unsigned. 3. If you ACCEPT the Permit and its Terms and Conditions (and are authorized to sign as legal owner of the property, or as an authorized representative), please sign and date the Access Permit form on the line marked "PERMITTEE" within 60 days of the transmittal date on the permit. Your signature confirms your agreement to all the listed Terms and Conditions. 4. If you fail to sign and return the attached Access Permit within 60 days of the permit transmittal date, the Colorado Department of Transportation (CDOT) will consider this permit withdrawn. 5. You must return the signed Access Permit hard copies with original signature(sl, including all pages of terms and conditions and all attachments, with your payment to the Colorado Department of Transportation (CDOT) at the address noted below. The Department will return an executed copy of this permit. You may retain this cover letter for your records. 6. Provide a check or money order made payable to "CDOT" for the total amount due of $100.00. 7. If you wish to APPEAL the Terms and Conditions of the permit, please refer to the attached Form 101, Pages 2 and 3 for an explanation of the appeal procedures. 8. As described in the attached Terms and Conditions, you must make a written request to obtain a Notice to Proceed. DO NOT begin any work within the State Highway Right -of -Way without a validated Access Permit and Notice to Proceed. Use of this permit without the Colorado Department of Transportation's validation shall be considered a violation of State Law. If you have any questions please call Kandis Aggen, Access Coordinator, at (970) 683-6270 or Dan Roussin, Region 3 Permit Manager, at the number above. Please return Access Permit and attachments to: Region 3 Access Unit Attn: Kandis Aggen, Access Coordinator 222 5 6th St, Rm 100 Grand Junction, CO 81501 R3 Traffic Section, Access Unit, 222 S. 6th Street, Rm 100, Grand Junction, CO 81501 PH (970) 683-6284 www.codot.gov COLORADO DEPARTMENT OF TRANSPORTATION STATE HIGHWAY ACCESS PERMIT CDOT Permit No. 318085 State Highway No / Mp / Side 013A / 4.000 / Left Permit Fee $100.00 Date of Transmittal 12/22/2018 Region / Section / Patrol / Name Local Jurisdiction 3 / 06 / 6J36 Alan Rasic Garfield County The Permittee(s): The Applicant(s): Pipe Manifold Specialists, LLC 302 W. 33rd Street Rifle, Colorado 81650 (970) 987-2545 is hereby granted permission to have an access to the state highway at the location noted below. The access shall be constructed, maintained and used in accordance with this permit, including the State Highway Access Code and any attachments, terms, conditions and exhibits. This permit may be revoked by the Issuing Authority if at any time the permitted access and its use violate any parts of this permit. The issuing authority, the Department and their duly appointed agents and employees shall be held harmless against any action for personal injury or property damage sustained by reason of the exercise of the permit. Location: Located on the west side of Hwy 13 at approx. MP 4 and 700 feet south of county rd. 325 Access to Provide Service to: (Land Use Code) (Size) (Units) 110 - General Light Industrial Contractor's Yard 8 DHV Additional Information: The access is a temporary access until the property can share an access with the property to the south (Parcel # 212936400001) 3125 Hwy 13 in accordance with the 2009 SH 13 Access Control Plan. MUNICIPALITY OR COUNTY APPROVAL Required only when the appropriate local authority retains issuing authority. Signature Print Name Date Title Upon the signing of this permit the permittee agrees to the terms and conditions and referenced attachments contained herein. Ail construction shall be completed in an expeditious and safe manner and shall be finished within 45 days trom Initiation. The permitted access shall be completed in accordance with the terms and conditions of the permit prior to being used. The permittee shall notify David Raley 6J4 with the Colorado Department of Transportation, at (970) 629-2606 at least 48 hours prior to commencing construction within the State Highway right-of-way. The person signing as the permittee must be the owner or legal representative of the property served by the permitted access and have full authority to accept the permit and its terms and conditions. Perrnitte re: Print Name i7i re I,c v Date L. iJI` ------ Co-PermitteeSlggnature: f appli ble) Print Name Mite r This permit is not valid until signed by a duly authorized representative of the Department. COLORADO DEPARTMENT OF TRANSPORTATION Signature Print Name Title Date (of issue) Copy Distribution: Required: 1.Region 2.Applicant Make copies as necessary for: 3.Staff Access Section Local Authority Inspector 4.Central Files MTCE Patrol Traffic Engineer Previous editions are obsolete and may not be used Page 1 of 3 CDOT Form #101 5/07 State Highway Access Permit Form 101, Page 2 The following paragraphs are excerpts of the State Highway Access Code. These are provided for your convenience but do not alleviate compliance with all sections of the Access Code. A copy of the State Highway Access Code is available from your local issuing authority (local government) or the Colorado Department of Transportation (Department). When this permit was issued, the issuing authority made its decision based in part on information submitted by the applicant, on the access category which is assigned to the highway, what alternative access to other public roads and streets is available, and safety and design standards. Changes in use or design not approved by the permit or the issuing authority may cause the revocation or suspension of the permit. APPEALS 1. Should the permittee or applicant object to the denial of a permit application by the Department or object to any of the terms or conditions of a permit placed there by the Department, the applicant and permittee (appellant) have a right to appeal the decision to the [Transportation] Commission [of Colorado]. To appeal a decision, submit a request for administrative hearing to the Transportation Commission of Colorado within 60 days of transmittal of notice of denial or transmittal of the permit for signature. Submit the request to the Transportation Commission of Colorado, 4201 East Arkansas Avenue, Denver, Colorado 80222-3400. The request shall include reasons for the appeal and may include changes, revisions, or conditions that would be acceptable to the permittee or applicant. 2. Any appeal by the applicant or permittee of action by a local issuing authority shall be filed with the local authority and be consistent with the appeal procedures of the local authority. 3. In submitting the request for administrative hearing, the appellant has the option of including within the appeal a request for a review by the Department's internal administrative review committee pursuant to [Code] subsection 2.10. When such committee review is requested, processing of the appeal for formal administrative hearing, 2.9(5) and (6), shall be suspended until the appellant notifies the Commission to proceed with the administrative hearing, or the appellant submits a request to the Commission or the administrative law judge to withdraw the appeal. The two administrative processes, the internal administrative review committee, and the administrative hearing, may not run concurrently. 4. Regardless of any communications, meetings, administrative reviews or negotiations with the Department or the internal administrative review Committee regarding revisions or objections to the permit or a denial, if the permittee or applicant wishes to appeal the Department's decision to the Commission for a hearing, the appeal must be brought to the Commission within 60 days of transmittal of notice of denial or transmittal of the permit. PERMIT EXPIRATION 1. A permit shall be considered expired if the access is not under construction within one year of the permit issue date or before the expiration of any authorized extension. When the permittee is unable to commence construction within one year after the permit issue date, the permittee may request a one year extension from the issuing authority. No more than two one-year extensions may be granted under any circumstances. If the access is not under construction within three years from date of issue the permit will be considered expired. Any request for an extension must be in writing and submitted to the issuing authority before the permit expires. The request should state the reasons why the extension is necessary, when construction is anticipated, and include a copy of page 1 (face of permit) of the access permit. Extension approvals shall be in writing. The local issuing authority shall obtain the concurrence of the Department prior to the approval of an extension, and shall notify the Department of all denied extensions within ten days. Any person wishing to reestablish an access permit that has expired may begin again with the application procedures. An approved Notice to Proceed, automatically renews the access permit for the period of the Notice to Proceed. CONSTRUCTION 1. Construction may not begin until a Notice to Proceed is approved. (Code subsection 2.4] 2. The construction of the access and its appurtenances as required by the terms and conditions of the permit shall be completed at the expense of the permittee except as provided in subsection 2.14. All materials used in the construction of the access within the highway right-of-way or on permanent easements, become public property. Any materials removed from the highway right-of-way will be disposed of only as directed by the Department. All fencing, guard rail, traffic control devices and other equipment and materials removed in the course of access construction shall be given to the Department unless otherwise instructed by the permit or the Department inspector. 3. The permittee shall notify the individual or the office specified on the permit or Notice to Proceed at least two working days prior to any construction within state highway right-of-way. Construction of the access shall not proceed until both the access permit and the Notice to Proceed are issued. The access shall be completed in an expeditious and safe manner and shall be finished within 45 days from initiation of construction within the highway right-of-way. A construction time extension not to exceed 30 working days may be requested from the individual or office specified on the permit. 4. The issuing authority and the Department may inspect the access during construction and upon completion of the access to ensure that all terms and conditions of the permit are met. Inspectors are authorized to enforce the conditions of the permit during construction and to halt any activities within state right-of-way that do not comply with the provisions of the permit, that conflict with concurrent highway construction or maintenance work, that endanger highway property, natural or cultural resources protected by law, or the health and safety of workers or the public. 5. Prior to using the access, the permittee is required to complete the construction according to the terms and conditions of the permit. Failure by the permittee to abide by all permit terms and conditions shall be sufficient cause for the Department or issuing authority to initiate action to suspend or revoke the permit and close the access. If in the determination of the Department or issuing authority the failure to comply with or complete the construction requirements of the permit create a highway safety hazard, such shall be sufficient cause for the summary suspension of the permit. If the permittee wishes to use the access prior to completion, arrangements must be approved by the issuing authority and Department and included in the permit. The Department or issuing authority may order a halt to any unauthorized use of the access pursuant to statutory and regulatory powers. Reconstruction or improvement of the access may be required when the permittee has failed to meet required specifications of design or materials. If any construction element fails within two years due to improper construction or material specifications, the permittee shall be responsible for all repairs. Failure to make such repairs may result in suspension of the permit and closure of the access. 6. The permittee shall provide construction traffic control devices at all times during access construction, in conformance with the M.U.T.C.D. as required by section 42- 4-104, C.R.S., as amended. 7. A utility permit shall be obtained for any utility work within highway right-of-way. Where necessary to remove, relocate, or repair a traffic control device or public or private utilities for the construction of a permitted access, the relocation, removal or repair shall be accomplished by the permittee without cost to the Department or issuing authority, and at the direction of the Department or utility company. Any damage to the state highway or other public right-of-way beyond that which is allowed in the permit shall be repaired immediately. The permittee is responsible for the repair of any utility damaged in the course of access construction, reconstruction or repair. 8. In the event it becomes necessary to remove any right- of-way fence, the posts on either side of the access shall be securely braced with an approved end post before the fence is cut to prevent any slacking of the remaining fence. All posts and wire removed are Department property and shall be turned over to a representative of the Department. 9. The permittee shall ensure that a copy of the permit is available for review at the construction site at all times. The permit may require the contractor to notify the individual or office specified on the permit at any specified phases in construction to allow the field inspector to inspect various aspects of construction such as concrete forms, subbase, base course compaction, and materials specifications. Minor changes and additions may be ordered by the Department or local authority field inspector to meet unanticipated site conditions. 10. Each access shall be constructed in a manner that shall not cause water to enter onto the roadway or shoulder, and shall not interfere with the existing drainage system on the right-of-way or any adopted municipal system and drainage plan. 11. By accepting the permit, permittee agrees to save, indemnify, and hold harmless to the extent allowed by law, the issuing authority, the Department, its officers, and employees from suits, actions, claims of any type or character brought because of injuries or damage sustained by any person resulting from the permittee's use of the access permit during the construction of the access. CHANGES IN ACCESS USE AND PERMIT VIOLATIONS 1. It is the responsibility of the property owner and permittee to ensure that the use of the access to the property is not in violation of the Code, permit terms and conditions or the Act. The terms and conditions of any permit are binding upon all assigns, successors -in -interest, heirs and occupants. If any significant changes are made or will be made in the use of the property which will affect access operation, traffic volume and or vehicle type, the permittee or property owner shall contact the local issuing authority or the Department to determine if a new access permit and modifications to the access are required. 2. When an access is constructed or used in violation of the Code, section 43-2-147(5)(c), C.R.S., of the Act applies. The Department or issuing authority may summarily suspend an access permit and immediately order closure of the access when its continued use presents an immediate threat to public health, welfare or safety. Summary suspension shall comply with article 4 of title 24, C.R.S. MAINTENANCE 1. The permittee, his or her heirs, successors -in -interest, assigns, and occupants of the property serviced by the access shall be responsible for meeting the terms and conditions of the permit, the repair and maintenance of the access beyond the edge of the roadway including any cattle guard and gate, and the removal or clearance of snow or ice upon the access even though deposited on the access in the course of Department snow removal operations. Within unincorporated areas the Department will keep access culverts clean as part of maintenance of the highway drainage system. However, the permittee is responsible for the repair and replacement of any access -related culverts within the right-of-way. Within incorporated areas, drainage responsibilities for municipalities are determined by statute and local ordinance. The Department will maintain the roadway including auxiliary lanes and shoulders, except in those cases where the access installation has failed due to improper access construction and/or failure to follow permit requirements and specifications in which case the permittee shall be responsible for such repair. Any significant repairs such as culvert replacement, resurfacing, or changes in design or specifications, requires authorization from the Department. Form 101, Page 3 STATE of COLORADO HIGHWAY ACCESS PERMIT ADDITIONAL TERMS and CONDITIONS December 22, 2018 PERMIT No. 318085 Permittee(s): Pipe Manifold Specialists, LLC Location: Garfield County on CO Highway 013A, near Mile Ref. Pt. 4 Left TERMS AND CONDITIONS 1. This permitted access is only for the use and purpose stated in the Application and Permit. This Permit is issued in accordance with the State Highway Access Code (2 CCR 601-1), and is based in part upon the information submitted by the Permittee. Any subsequent relocation, reconstruction, or modifications to the access or changes in the traffic volume or traffic nature using the access shall be requested for by means of a new application. Any changes causing non-compliance with the Access Code may render this permit void, requiring a new permit. 2. This permit replaces any and all additional access permits that may be in existence. 3. The access is for Parcel # 212936100009 (3131 State Highway 13). 4. The southern access to the property shall be closed. The access closure site shall be re - vegetated and asphalt apron shall be removed and the drainage restored to historical drainage. 5. The access is 355 feet south of GCR 296. 6. The access is a full movement access. 7. The use of the property is a contractor's yard. The traffic volume is 8 DHV (design hour volume). 8. The access is a temporary access until the property can share an access with the property to the south (Parcel # 212936400001) 3125 Hwy 13 in accordance with the SH 13 Access Control Plan. 9. Once the both properties share an access. The existing access shall be closed and the new access shall be established thru the access permit process. 10. This access shall be constructed 24-28 feet wide with turning radii to accommodate the minimum turning radius of the largest vehicle or 35 foot, whichever is greater. 11. An 18 -inch minimum culvert with protective end treatments may be required for this access. The culvert shall be kept free of blockage to maintain proper flow and drainage. 12. The access shall be constructed perpendicular to the travel lanes of the State Highway for a minimum distance of 40 feet from the edge of roadway. Side slopes shall be at a 4:1 slope on the roadway. The roadway shall slope away from the highway at a -2% grade for the first 20 feet of driveway. This design shall be in conformance with section 4 of the State Highway Access Code, 2CCR 601-1. 13.Materials, Placing and Compaction of a Commercial Access up to 99 DHV: Unless the Applicant has approval from the Access Manager which may state otherwise, the following will be required for driveway construction: Hot Mix Asphalt Option (HMA) Base: 16 inches of class 6 gravel with maximum 6 -inch lifts, Surface: 4 inches of HMA in two, 2 -inch lifts. Compaction of the subgrade, embankments and backfill shall comply with STATE of COLORADO HIGHWAY ACCESS PERMIT ADDITIONAL TERMS and CONDITIONS December 22, 2018 PERMIT No. 318085 Permittee(s): Pipe Manifold Specialists, LLC Location: Garfield County on CO Highway 013A, near Mile Ref. Pt. 4 Left sections 203 Et 304 of the Colorado Highway Standard Specifications for Road and Bridge Construction. Concrete Pavement Option: Portland Cement (PCCP) Base: 4 inches of class 6 gravel, Surface: A minimum of 6" of doweled and tied PCCP. Compaction of the subgrade, embankments and backfill shall comply with sections 203 Et 304 of the Colorado Highway Standard Specifications for Road and Bridge Construction. 14. The access shall be surfaced in accordance with Section 4.7 of the Access Code immediately upon completion of earthwork construction and prior to use. This access shall be hard surfaced in accordance with Section 4.7 of the Access Code a minimum distance of 20 feet from the traveled way or to the CDOT Right -of -Way. Where the hard surface is to abut existing pavement, the existing pavement shall be saw cut and removed a minimum of one foot back from the existing edge for bituminous, or until an acceptable existing cross slope is achieved. Surfacing shall meet the Department's specifications with minimum surfacing to be equal to or greater than existing highway conditions. 15. A Notice to Proceed, CDOT Form 1265, is required before beginning construction on the access or any activity within the highway Right -of -Way. To receive the Notice to Proceed the Applicant shall submit a complete packet to CDOT with the following items: (a) A cover letter requesting a Notice to Proceed, and the intended date to begin construction. (b) Construction Plans Stamped (11"x 17" with a minimum scale of 1" = 50') by a Colorado Registered Professional Engineer in full compliance with the State Highway Access Code. The plan shall provide: i) Plan view with driveway dimensions - turn radius, width, slope, gates, etc. ii) Typical road section - existing and proposed sub base, base, pavement, and shoulder dimensions. iii) Centerline profile of the access/Hwy connection showing depths, driveway slope, etc. (c) Certificate of Insurance Liability as per Section 2.3(11)(i) of the State Highway Access Code. (d) A certified Traffic Control Plan in accordance with Section 2.4(6) of the Access Code. The Traffic Control Plan shall provide accessibility features to accommodate all pedestrians including persons with disabilities for all pathways during construction. 16. No drainage from this site shall enter onto the State Highway travel lanes. The Permittee is required to maintain all drainage in excess of historical flows and time of concentration on site. All existing drainage structures shall be extended, modified or upgraded, as applicable, to accommodate all new construction and safety standards, in accordance with the Department's standard specifications. 17. Open cuts, which are at least 4 inches in depth, within 30 feet of the edge of the State Highway traveled way, will not be left open at night, on weekends, or on holidays, or shall be protected with a suitable barrier per State and Federal Standards. STATE of COLORADO HIGHWAY ACCESS PERMIT ADDITIONAL TERMS and CONDITIONS December 22, 2018 PERMIT No. 318085 Permittee(s): Pipe Manifold Specialists, LLC Location: Garfield County on CO Highway 013A, near Mile Ref. Pt. 4 Left 18. Nothing in this permit shall prohibit the Chief Engineer from exercising the right granted in CRS 43-3-102 Including but not limited to restricting left hand turns by construction of physical medial separations. 19. The Permittee is responsible for obtaining any necessary additional Federal, State and/or City/County permits or clearances required for construction of the access. Approval of this access permit does not constitute verification of this action by the Permittee. Permittee is also responsible for obtaining all necessary utility permits in addition to this access permit. 20. All workers within the State Highway right of way shall comply with their employer's safety and health policies/procedures, and all applicable U.S. Occupational Safety and Health Administration (OSHA) regulations - including, but not limited to the applicable sections of 29 CFR Part 1910 - Occupational Safety and Health Standards and 29 CFR Part 1926 - Safety and Health Regulations for Construction. Personal protective equipment (e.g. head protection, footwear, high visibility apparel, safety glasses, hearing protection, respirators, gloves, etc.) shall be worn as appropriate for the work being performed, and as specified in regulation. 21 The Permittee shall provide accessibility features to accommodate all pedestrians including persons with disabilities for all pathways during and after construction. 22. The Permittee is required to comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG) that have been adopted by the U.S. Architectural and Transportation Barriers Compliance Board (Access Board), and incorporated by the U.S. Attorney General as a federal standard. These guidelines are defining traversable slope requirements and prescribing the use of a defined pattern of truncated domes as detectable warnings at street crossings. The new Standards Plans and can be found on the Design and Construction Project Support web page at: htto://www.dot.state.co.us/DesioSupport/, then click on Design Bulletins. 23. When it is necessary to remove any highway right-of-way fence, the posts on either side of the access entrance shall be securely braced with approved end posts and in conformance with the Department's M-607-1 standard, before the fence is cut, to prevent slacking of the remaining fence. All materials removed shall be returned to the Department. 24. It shall be the responsibility of the Permittee to maintain adequate sight distance for this driveway. Trimming of vegetation or trees to maintain adequate sight distance is the sole responsibility of the Permittee. 25. Any damage to present highway facilities including traffic control devices shall be repaired immediately at no cost to the Department and prior to continuing other work. 26. During access construction no construction personnel vehicles will be permitted to park in the state highway right-of-way. 27. If the access has a gate across it, the gate shall be set back far enough from the highway so that the longest vehicle using it can clear the roadway when the gate is closed. 28. Any mud or other material tracked or otherwise deposited on the roadway shall be removed daily or as ordered by the Department inspector. If mud is an obvious condition during site construction, it is recommended that the contractor build a Stabilized Construction Entrance or Scrubber Pad at the intended construction access to aid in the removal of mud and debris STATE of COLORADO HIGHWAY ACCESS PERMIT ADDITIONAL TERMS and CONDITIONS December 22, 2018 PERMIT No. 318085 Permittee(s): Pipe Manifold Specialists, LLC Location: Garfield County on CO Highway 013A, near Mile Ref. Pt. 4 Left from vehicle tires. The details of the Stabilized Construction Entrance can be found in the M St S Standards Plan No. M-208-1. 29. A fully executed, complete copy of this permit and the Notice to Proceed must be on the job site with the contractor at all times during the construction. Failure to comply with this or any other construction requirement may result in the immediate suspension of work by order of the Department inspector or the issuing authority. 30. No work will be allowed at night, Saturdays, Sundays and legal holidays without prior authorization from the Department. The Department may also restrict work within the State Highway right-of-way during adverse weather conditions. 31. The access shall be completed in an expeditious and safe manner and shall be completed within 45 days from initiation of construction within State Highway right-of-way or in accordance with written concurrence of the Access Manager. All construction shall be completed in a single season. 32. All costs associated with any type of utility work will be at the sole responsibility and cost of the Permittee and at no cost to CDOT. 33. Areas of roadway and/or right-of-way disturbed during this installation shall be restored to their original conditions to insure proper strength and stability, drainage and erosion control. Restoration shall meet the Department's standard specifications for topsoil, fertilization, mulching, and re -seeding. 34. Upon the completion of the access and prior to any use as allowed by this permit, the Applicant shall notify the Access Manager by certified mail within 10 days to request a final inspection. This request shall include certification that all materials and construction have been completed in accordance with all applicable Department Standards and Specifications; and that the access is constructed in conformance with the State Highway Access Code, 2 CCR 601-1, including this permit. The Engineer of Record as indicated on the construction plans, shall be present for this inspection. The access serviced by this permit may not be opened to traffic until written approval has been given from the CDOT Access Manager. COLORADO Department of Transportation What is stormwater runoff? Stormwater runoff occurs when precipitation from rain or snowmelt flows over the ground. Impervious surfaces like roads and sidewalks prevent stormwater from naturally soaking into the ground Why is stormwater runoff a problem? Stormwater can pick up debris, chemicals, dirt and other pollutants and flow into CDOT's storm drain system or directly into a stream, river, lake, wetland or reservoir. Anything that enters CDOT's storm drain system is discharged untreated into the waterways we use for fishing, swimming, and providing drinking water. Dredged spoil, dirt, slurry, solid waste, incinerator residue, sewage, sewage sludge, garbage, trash, chemical waste, biological nutrient, biological material, radioactive material, heat, pH, wrecked w discarded equipment, togk, sand, any industrial, municipal, or agricultural waste. Tips for Reporting an Illicit Discharge Call the illicit discharge hotline at (303) 512-4426 From a safe distance try to estimate the amount of the discharge. Identify characteristics of the discharge (color, odor, algae, etc.). Obtain information on the vehicle dumping the waste (if applicable). Do not approach! Call *CSP for illicit dumping. If possible, take a photo, record a license plate. REMEMBER: Never get too close to the illicit discharge, it may be dangerous!!! For more information on CDOT Utility Permits: htt ps:llwww.codot. aovl buss nesslperml tsluNlitle ssoecialuse For more information on CDOT Access Permits: Intos://www.coclotirov/by$inegker shicre SS permits For more information on CDOT Water Quality Program: Water Quality Program Manager 4201 E. Arkansas Ave. Shumate Building Denver, Colorado 8D222 303-757-9343 COLORADO Department of Transportation Water /duality 14 -carat -in Industrial Fadiities Urogram CDOT has a Municipal Separate Storm Sewer System permit, otherwise known as (M54) from the Colorado Department of Public Health and Environment. The permit states that only stormwater can be discharged from CDOT's storm drain system rw.r plpt —8.• •— dorm drain OP. TOTHE WASTEWATER TREATMENT PLANT TpntE1.00/ INA nil eowe As part of the permit, CDOT has several different programs to prevent pollutants from entering into the storm drain system: • Construction Site Program New Development Redevelopment Program • Illicit Discharge Program • Industrial Facilities Program • Public Education and Outreach Program • Pollution Prevention and Good Housekeeping Program • Wet Weather Monitoring Program COLORADO Department of Transportation Control Measures for Industrial Facilities Industrial facilities can use control measures (CM) otherwise known as Best Management Practices (BMP) during the construction of a facility and when operating the facility. Control measures are schedules of activities, maintenance procedures, and other management practices to prevent and reduce pollution entering into CDOT's storm drain system. Control Measures also Include treatment, operating procedures, and practices to control site run off which can include structural and non-structural controls. THE GAUNTLET AE IME mammas V AIMEv IEftlRi In compliance// CDOT defines a utility, or utility facility as any privately, publicly, or cooperatively owned line, facility, or system producing, transmitting or distributing the following: ✓ Communications ✓ Cable television ✓ Power ✓ Electricity ✓ Light ✓ Heat Gas ✓ Oil ✓ Crude Products ✓ Water ✓ Stream ✓ Waste ✓ Stormwater not connected with highway drainage ✓ Similar Commodity COLORADO Department of Transportation Industrial Facilities Program Elements: 1. Educate and outreach to owners or operators that have potential to contribute substantial pollutant to water. 2. Report and include information on discharge and water quality concerns. Provide written notification within 15 days of discovery to CDPHE. 3. Submit an annual report to CDPHE containing the number of informational brochures distributed; name and title of each individual trained. Education There are instances when a utility company or other entity doing work in the state highway right-of-way will require some type of environmental permit or clearance for that work. CDOT has put together an Environmental Clearances Information Summary for those applying for a CDOT Utility and Special Use Permit or Access Permit to obtain all required clearances. This fact sheet is given to each permittee and is available at: htto://www.coloradodot. info/ programs/ environmental/ resources/guidance- s tandards /Environmental%20C lea rances% 201 nfo%2O5ummary. pdf COLORADO DEPARTMENT OF TRANSPORTATION Environmental Clearances Information Summary PURPOSE - This summary is intended to inform entities external to CDOT that may be entering the state highway right-of-way to perform work related to their own facilities (such as Utility, Special Use or Access Permittees), about some of the more commonly encountered environmental permits/clearances that may apply to their activities. This listing is not all-inclusive - additional environmental or cultural resource permits/clearances may be required in certain instances. Appropriate local, state and federal agencies should be contacted for additional information if there is any uncertainty about what permits/clearances are required for a specific activity. IMPORTANT — Please Review The Following Information Carefully— Failure to Comply With Regulatory Requirements May Result In Suspension or Revocation of Your CDOT Permit, Or Enforcement Actions By Other Agencies CLEARANCE CONTACTS - As indicated in the permit/clearance descriptions listed below, the following individuals or agencies may be contacted for additional information: • Colorado Department of Public Health and Environment (CDPHE): General Information — (303) 692-2035 Water Quality Control Division (WQCD): (303) 692-3500 Environmental Pemmitting Website https:llwww.colarado.govlpacific/cdphelall-permits • CDOT Water Quality Program Manager: (303) 757-9343 https:llwww.codot.povlprogramslenvironmental/water-quality • CDOT Asbestos Project Manager: Phil Kangas, (303) 512-5519 • Colorado Office of Archaeology and Historic Preservation: (303) 866-3395 • U.S. Army Corps of Engineers, District Regulatory Offices: Omaha District (NE CO), Denver Office (303) 979-4120 http:l/www.nwo. usece.armv.mi!/Missions/RequlatoryProprarn/Colorado. aspx Sacramento Dist. (Western CO), Grand Junction Office (970) 243-1199 hlto://www.splcusace.arrny.mil/MissionsiRequlatomaspx Albuquerque District (SE CO), Pueblo Office (719)-543-9459 http:l/www.spa.usace.armv. mi1/Missions/RequlatoryProQramandPermits.aspx • CDOT Utilities, Special Use and Access Permitting: (303) 757-9654 htt s:llwww.codot.gov/business/permits Wildlife Resources - Disturbance of wildlife shall be avoided to the maximum extent practicable. Entry into areas of known or suspected threatened or endangered species habitat will require special authorization from the CDOT permitting office. If any threatened or endangered species are encountered during the progress of the permitted work, work in the subject area shall be halted and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be provided by CDOT prior to the continuation of work. Information about threatened or endangered species may be obtained from the CDOT website, htto:l/www.codot.gov/programs!environmental/wildlife/Quidetines or the Colorado Parks and Wildlife (CPW) website, http://www.cpw.state.co.us/learn/Pages/SOC-ThreatenedEndanoeredList.aspx. Additional guidance may be provided by the appropriate Region Planning and Environmental Manager (RPEM). Cultural Resources - The applicant must request a file search of the permit area through the Colorado Office of Archaeology and Historic Preservation (OAHP), Denver, to ascertain if historic or archaeological resources have previously been identified (http:llvwvw.historvcolerado.orgloehp/fle-search). Inventory of the permit area by a qualified cultural resources specialist may be necessary, per the recommendation of CDOT. If archaeological sites/artifacts or historic resources are known to exist prior to the initiation of the permitted work or are encountered as the project progresses, all work in the subject area shall be halted and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be provided by CDOT prior to the continuation of work. Additional guidance may be provided by the Regional Permitting Office and RPEM. Contact Information: Contact the OAHP for file searches at (303) 866-3395. Paleontological Resources - The applicant must request a fossil locality file search through the University of Colorado Museum, Boulder (httos:llcumuseum.colorado.edu/research/naleontolopvlvertebratesfDolicies), and the Denver Museum of Nature and Science (http:/Iwww.dmns.org/science/collections/earth-science-caitectians/) to ascertain if paleontological resources have been previously identified in or near the permit area. Inventory of the permit area by a qualified paleontologist may be necessary, per the recommendation of CDOT. If fossils are encountered during the permitted work, all work in the subject area shall be halted and the CDOT Regional Permitting Office and Region Planning and Environmental Manager shall be contacted immediately. Authorization must be provided by CDOT prior to the continuation of work. Additional guidance may be provided by the Regional Permitting Office in the Permit Special Provisions. Contact Information: See the museum websites listed above for Paleontological Collections Manager contact information. Contact the CDOT Paleontologist for further information at nicole.peaveyastate.co.us or (303) 757- 9632. The CDOT Paleontologist will not conduct a comprehensive file search independently of the museums. Hazardous Materials, Solid Waste - The Solid Wastes Disposal Sites and Facilities Act C.R.S. 30-20-100, et al, and Regulations Pertaining to Solid Waste Disposal Sites and Facilities (6 CCR 1007-2), prohibit solid waste disposal without an approved Certificate of Designation (a landfill permit). The Colorado Hazardous Waste Act C.R.S. 25-15-301 et al, and the Colorado Hazardous Waste Regulations (6 CCR 1007-3) prohibit the transfer, storage or disposal (TSD) of hazardous waste except at permitted TSD sites. There are no permitted landfills or TSD sites within the State Highway Right of Way. Therefore, all solid or hazardous wastes that might be generated by the activities of entities entering the State Highway Right of Way must be removed from the ROW and disposed of at a permitted facility or designated collection point (e.g., for solid waste, a utility or construction company's own dumpster). If pre-existing solid waste or hazardous materials contamination (including oil or petroleum contaminated soil, asbestos, chemicals, mine tailings, etc.) is encountered during the performance of work, the permittee shall halt work in the affected area and immediately contact the CDOT Regional Permitting Office for direction as to how to proceed. Contact Information: Theresa Santangelo-Dreiling, CDOT Hazardous Materials Project Manager, (303) 512-5524, or Andy Flurkey, (303) 512-5520. Asbestos Contalninsl Materials, Asbestos Contaminated Soil - All work on asbestos containing materials (ACM) must comply with the applicable requirements of the CDPHE Air Pollution Control Division's (APCD) Regulation 8. Disposal of ACM, and work done in asbestos -contaminated soil, must comply with the CDPHE Hazardous Materials and Waste Management Division's (HMWMD) Solid Environmental Clearances Information Summary Page 1 of 3 Colorado Department of Transportation May '16 Waste Regulations. The application for any CDOT permit must specifically identify any ACM involved in the work for which authorization is being requested. Additional guidance or requirements may be specified in the permit special provisions. Contact Info: CDPHE APCD and HMWMD Regulations can be accessed via the CDPHE Environmental Permitting Website listed above. Additional information concerning clearance on CDOT Proiects is available from the CDOT Asbestos Project Manager (303) 512- 5519, or Theresa Santangelo-Dreiling, Hazardous Materials Management Supervisor (303) 512-5524. Transportation of Hazardous Materials - No person may offer or accept a hazardous material for transportation in commerce unless that person is registered in conformance with the United States Department of Transportation regulations at 49 CFR, Part 171. The hazardous material must be properly classed, described, packaged, marked, labeled, and in condition for shipment as required or authorized by applicable requirements, or an exemption, approval or registration has been issued. Vehicles requiring a placard, must obtain authorization and a State HAZMAT Permit from the Colorado Public Utilities Commission. Contact Information: For authorization and more info call the Federal Motor Safety Carrier Administration, US DOT for inter- and intra -state HAZMAT Registration (303) 969-6748. Colorado Public Utilities Commission: (303) 894-2868. Discharge of Dredged or Fill Material -- 404 Permits Administered By the U.S. Army Corps of Engineers. and Section 401 Water Quality Certifications Issued by the CDPHE WQCD - Corps of Engineers 404 permits are required for the discharge of dredged or fill materials into waters of the United States, including wetlands. There are various types of 404 permits, including nationwide permits, which are issued for activities with relatively minor impacts. For example, there is a nationwide permit for utility line activities (nwp #12). Depending upon the specific circumstances, it is possible that either a "general" or "individual" 404 permit would be required. If an individual 404 permit is required, section 401 water quality certification from the CDPHE WQCD is also required. Contact the appropriate Corps District Regulatory Office for information about what type of 404 permit may be required (contact information above). Contact the CDPHE Water Quality Control Division at (303) 692-3500. Working on or In any stream or Its bank - In order to protect and preserve the state's fish and wildlife resources from actions that may obstruct, diminish, destroy, change, modify, or vary a natural existing stream or its banks or tributaries, it may be necessary to obtain a Senate Bill 40 certification from the Colorado Department of Natural Resources. A stream is defined as 1) represented by a solid blue line on USGS 7.5' quadrangle maps; and/or 2) intermittent streams providing live water beneficial to fish and wildlife; and/or 3) segments of streams supporting 25% or more cover within 100 yards upstream or downstream of the project; and/or 4) segments of streams having wetlands present within 200 yards upstream or downstream of the project measured by valley length. The CPW application, as per guidelines agreed upon by CDOT and CPW, can be accessed at http://www.coloradodot.info/programs/enviranmenta I/wi Idlifelquidelines. _ Storrnwater Construction Permit (SCP) and Stormwater Discharge From Industrial Facilities - Discharges of stormwater runoff from construction sites disturbing one acre or more - or certain types of industrial facilities, such as concrete batch plants - requires a CDPS Stormwater Permit. Contact Information: Contact the CDPHE Water Quality Control Division at (303) 692-3500. Website: https:/lwww.colorado.govinacif c/cdohe/wq-construction-general-permits and https:llcolorado.govlpacific/cdphe/wu-comme rce-a nd- industry-permits. Construction Dewatering (Discharge or Infiltration) and Remediation Activities - Discharges of water encountered during excavation or work in wet areas may require a Construction Dewatering or Remediation Activities Discharge Permit. Contact Information: For Construction Dewatering and Remediation Activities Discharge Permits, contact the CDPHE WQCD at (303) 692- 3500. For Applications and Instructions (CDPHE website): https:llwww.colorado.gov/pacificicdphe/wq:construction-general-permits. Municipal Separate Storm Sewer System (MS4) Discharge Permit - Discharges from the storm sewer systems of larger municipalities, and from the CDOT highway drainage system that lies within those municipalities, are subject to MS4 Permits issued by the CDPHE WQCD. For facilities that lie within the boundaries of a municipality that is subject to an MS4 permit, the owner of such facility should contact the municipality regarding stormwater related clearances that may have been established under that municipality's MS4 permit. All discharges to the CDOT highway drainage system or within the Right of Way (ROW) must comply with the applicable provisions of the Colorado Water Quality Control Act, the Water Quality Control Commission (WQCC) Regulations (https:llwww.colorado.aov/pacific/cdohelwgcc-regulations-and-policies-and-water-quality-statutes) and the CDOT MS4 Permit # COS - 000005 (https:llwww.codot.aovlprograms/environmental/water-pualityldocuments), Discharges are subject to inspection by CDOT and CDPHE. Contact the CDPHE Water Quality Control Division at (303) 692-3500 fora listing of municipalities required to obtain MS4 Permits, or o to https://www.colorado.00v/pacifidcdohe/wq-municipal-ms4-permits. General Prohibition - Discharges - All discharges are subject to the provisions of the Colorado Water Quality Control Act and the Colorado Discharge Permit Regulations. Prohibited discharges include, but are not limited to, substances such as wash water, paint, automotive fluids, solvents, oils or soaps and sediment. Contact Information: Contact the CDPHE Water Quality Control Division at (303) 692-3500. General Authorization - Allowable Non-Stormwater Discharges - Unless otherwise identified by CDOT or the WQCD as significant sources of pollutants to the waters of the State, the following discharges to stormwater systems are allowed without a Colorado Discharge Permit System permit: landscape irrigation, diverted stream flows, uncontaminated ground water infiltration to separate storm sewers, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, uncontaminated springs, footing drains, water line flushing, flows from riparian habitats and wetlands, and flow from firefighting activities. Allowable non-stomiwater discharges can be found at https:llwww.codot.gov/programs/environmental/water- quality/glossaw.html. Contact Information: The CDPHE Water Quality Control Division (telephone #'s listed above). -Eroslon and Sediment Control Practices - For activities requiring a Stormwater Construction Permit, erosion control requirements will be specified in that permit. In those situations where a stormwater permit is not required, all reasonable measures should be taken in order to minimize erosion and sedimentation according to CDOT Standard Specifications 107.25 and 208. All disturbances require a stabilization plan, native seeding or landscape design plan according to applicable CDOT Standard Specifications 212-217 and 623. In any case, the CDOT Erosion Control and Stormwater Quality Guide (most recent version) should be used to design erosion controls and to restore disturbed vegetation. Contact Information: The CDOT Erosion Control and Stormwater Quality Guide may be obtained from the Bid Plans Office at (303) 757-9313 or from: https:llwww.codot.gov/programs/environmental/landscape- a rc h it ectu re/era si on -storm-quality. Environmental Clearances Information Summary Page 2 of 3 Colorado Department of Transportation May '16 Disposal of Drilling Fluids - Drilling fluids used in operations such as Horizontal Directional Drilling may be classified as "discharges" or "solid wastes," and in general, should be pumped or vacuumed from the construction area, removed from the State Highway Right of Way, and disposed of at permitted facilities that specifically accept such wastes. Disposal of drilling fluids into storm drains, storm sewers, roadside ditches or any other type of man-made or natural waterway is prohibited by Water Quality Control and/or Solid Waste regulations. Small quantities of drilling fluid solids (less than 1 cubic yard of solids) may be left on-site after either being separated from fluids or after infiltration of the water, provided: 1) the drilling fluid consists of only water and bentonite clay, or, if required for proper drilling properties, small quantities of polymer additives that are approved for use in drinking water well drilling; 2) the solids are fully contained in a pit, and are not likely to pose a nuisance to future work in the area, 3) the solids are covered and the area restored as required by CDOT permit requirements (Utility, Special Use, or Access Permits, etc.). Contact Information: Contact CDPHE (telephone #'s listed above). Noxious Weeds and Invasive Species Manauement Plan — Noxious Weeds and Invasive Species guidance can be found by contacting the Colorado Department of Agriculture (https://www.co€orado.govJpacific/agconservation/noxiousweeds) and the Colorado Division of Parks and Wildlife (http:llcpw.state.co.uslaboutus/Pages/RS-NoxiousWeeds.aspx). In either case, management plans involving the control of noxious weeds associated with the permitted activity and cleaning of equipment will be required. Concrete Washout - Waste generated from concrete activities shall NOT be allowed to flow into the drainage ways, inlets, receiving waters, or in the CDOT ROW. Concrete waste shall be placed in a temporary concrete washout facility and must be located a minimum of 50 feet from state waters, drainageways, and inlets. Concrete washout shall only be performed as specified by the CDOT Environmental Program and shall be in accordance to CDOT specifications and guidelines. Contact Information: Contact CDPHE or find additional information on the CDOT website: https://www.codot.qov/businessldesignsupport12011-construction- specifications/2011-Specs and refer to the specifications and their revisions for sections 101, 107 and 208. Spill Reporting - Spills shall be contained and cleaned up as soon as possible. Spills shall NOT be washed down into the storm drain or buried. All spills shall be reported to the CDOT illicit Discharge Hotline at (303) 512-4446 (4H20), as well as the Regional Permitting Office and Regional Maintenance Supervisor. Spills on highways, into waterways, any spill in the highway right-of-way exceeding 25 gallons, or that may otherwise present an immediate danger to the public shall be reported by calling 911, and shall also be reported to the CDPHE at 1-877-518-5608. More information can be found at https://www.co€orado.nov/pacificJcdphetemeraencv- iepnrlincl_iiiie. About This Form - Questions or comments about this Information Summary may be directed to Alex Karami, Program Administrator, CDOT Access Management Unit, at (303) 757-9841, alex.karami@state.co.us. Environmental Clearances Information Summary Page 3 of 3 Colorado Department of Transportation May '16