HomeMy WebLinkAboutApplicationGørfield County
BUILDING PERMIT
APPLICATIONCommunity Development Department
108 8th Street, Suite 401
REGEIVED Glenwood Springs, CO 81601
(9701 94s-8212
,ApR27 20lE www.garfield-countv.com
GARFIE
ilCMMtlN DemolitionÏä -ıımmercial/Multi-Family
I Manufactured Home (Single or Multi-Level]
Rerooffl Residential (SF, Duplex or Townhome)
INVOTVED,PAR
Property owner: Red barn guest ranch LLC pr,on., 1949 1291-1888
Mailing Address:345 Cr 262 New castle, Co 81647
Email Address:larryhalonen@gmail.com
Contractor:Hayes construct¡on lnc p¡on".1970 t
618-1043
Mailing Address:1002 Blake Av Glenwood spr¡ngs, Co 81601
Email Address:ericl i ntjer@ g ma ¡ | . com
Architecr Larry Halonen pton",P49 t291-1888
Mailing Address:26432 El mar Dr. Mission Viejo, Ca 92691
Emait Addresr. larryhalonen@gmail.com
Westar engineers 970 625-2774
Engineer:Phone:
Mailing Address:448 WillAv. Rifle, Co 81650
Email Address:westar@rof.net
Manufactured Home lnstaller:Phone:t)
Mailins Address:
Email Address:
FROJECTDETAlts
Describe Work:Adding 2 restrooms to existing structure
Job Address:345 Cr 262 new castle, Co 81647
Assessor's Parcet Number: 21 81 063001 35
Sub. Lot Block _
owne/s Valuation of Work 545000 Property Size {5q. Ft. or Acres}:
Sq. Ft. of Building: Height:# of Floors:_
Class of Work:flruew flAheration iEnaUition flRepair | | vtove/nelocation
Garage:IRttached Detached
PROIECT DETAITS CONTINUEÐ
Septic:OWTS , ! Community
Natural Gas Other
Driveway Permit Exempt Permit #:
ÍIOTIGE
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e,g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permít will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure{s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2ìstopping
construction or use of the structure(s) or facility(ies) if such ís in violation of County Regulation(s) or any other
applicable law. Review of this Appl¡cation, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, includíng without limitation my architect
engineer or builder
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the required information which is correct and accurate to the best of my knowledge.
?- 3a* /r
Property Owner and Sign Date
Propane ElectricType of Heat
oFFrcrar usEoNrY{)æÈ rt /þla V¿h t\sl óæQr
Soecial Conditions:4¿
^++^elnd
lizl of ætnàihons ødÀ
(ruorfl
tmw.¿*f4
àietYtot\
Manu home Fee:ùlê Misc Fees:
Qâb2e.6oAdjusted Valuation:673,3lol.oo
Plan Check Fee:4b7t.to+Permit Fee:Qßtt.t>
Fees Paid: . .íat 6^@'
Balance Due:
QTosJe
BP No:ßrP-p.d Ë*ø\\nû
OWTS No:Total Éees:Ø1,"u.?4
OCCGrouo: A_Z ConstType: y_þ Zoning:0RSetbacks:
F/R=25,9^lo
WWnnBUITDING / PTANNING DIVISION :
I
ryløløø
Dates¡snednppioua¡ ( l
BuitdÍns.l Z,nnins"Plan Review Checklist
Permit Number:
Building
Engineered Foundation
Driveway Permit
'/ Surveyed Site Plan
Septic Permit and Setbacks
'/ Grade/Topo sranllofuVnttttyi.¿rl
,/ nttacr,*esigeát Ptan Review List
N^ subdivísíon Plat Notes
Fire Department Revíew
Valuatíon Determination/ Fees
Red Line Plans/ Stampsl Sticker
/ Attach conditions
'/ Application Signed
'/ Plan Reviewer to Sign Applícation
'/ Parcel/schedute No.
N 40# Snowload Letter - Manu. Homes
'/ soils Report
Þvæ- 04-16- e224
(z¿à Ø,vn A,wiary HOu q:/OJ',,,^ú a'utar
Planninel Zonine
'/ Property Line Setbacks
N
N/A
./ Building Height
Zoning Sign-Off
Road lmpact Fees
/ Grade/Topography40%
a Planníng lssues
N/A
30 ft" Stream Setbacks
Flood Plain
Subdivision Plat
General Comments:q
wJ
FodÀ lnøa¿,.| F,t¿ =,44rn6 - tu
G¿L àlta"lrrvntu+ )
Av€trtuc|ton \e., 9-B
Oar'r¡can
^7 IUV' Aç>t^bV
Growp'A-2
lWuvr'r4tt ¡ o( R/,WW¿/.[ Avral t
. g¿çtröowq /ø¿rv æx%-
. gtoføy lt<itch.t'vt 6 x lÞ.b "
,llw\ovaut& ?¿"lto 1x ØÔ =
l¡oDQ x + x¿. bø = I Htbl +.Ø
12þ x ïry¿.bø = + 1¡oØb.00
Dbo åçt2.o6=s q12o-0O
4"7àtvt4.oo
Garfield County COMMERCIAL OR
MULTI-FAMILY
BUILDING PERMIT
APPLICATION CHECKLIST
Community Development Department
108 8th Sareet, Suite 401
Glenwood Springs, CO 81601
l970le4s-82t2
www.ga rfield-cou ntv.com
COiIMERCIAL OR MULTI-FAMILY BUILDING PERMIT APPLICATION CHECKLIST
ln order to understand the scope of work intended and to expedite the issuance of a permit, it is
important that complete information be provided. Please review this document to determine if you have
adequate information to design your project and to facilitate a plan review. All applications are required to
be submitted in person.
APPLICATION FORM: Please make sure the following information is provided on the application.. Parcel number obtained from the County Assessor's Office.. Job address (assigned physicaladdress).. Legal Description: block, lot, tract, subdivision, filing, or section, township and range.. Owne/s name, mailing address, phone, fax or cell,. Contactors name, mailing address, phone, fax or cell.¡ Architect andlor Engineer's name, mailing address, phone, fax or cell.o Building size, height, number of stories, lot size.o Use of building (Commercial).o Class of Work (New, Addition, Alteration, Repair, Demo, Move/ Relocation).. Detailed description of work.. Type of heating (naturalgas, propane, electric, other).. Sewer system (Community or OWTS), also see other items below.¡ Garage (Attached or Detached).. Driveway permit (please see other items below).. Valuation (labor and materials), see attached worksheet.
OTHER ITEMS:. lf you anticipate obtaining a water-tap from the City of Rlfle, please provide a letter indicating that
the City will provide water service. Required to submit building permit application.. OWTS requires a septic permit application to be submitted with the building permit application.o A separate electrical permit must be obtained from the State of Colorado Electrical Board.
r At the time of building permit submittal, you are required to show proof of legal and adequate
acoess to the site. This may include proof of right to use a private easement, County Road &
Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The
County Road & Bridge Department can be reached at970'625-8601'. lf you anticipate excavating or grading prior to issuance of a building permit, you will be required
to obtain a separate grading permit.
r lf you belong to a Homeowners Association it is your responsibility to obtain written approval, if
required.. Provide copies of any Resolutions and/or Land Use Permits associated with this property.
. Projects with more than 10 occupants require plans sealed by a Colorado Licensed Design
Professional. Occupant load shall be calculated by IBC Table 1004.1.. A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups.
BUILDING PLANS: 2 sets of plans must be submitted. Plans must be 18"x24" minimum size, complete,
identical, legible and to scale. Certain proje€{s may also require a third copy of the plans be submitted to
the local Fire District for review prior to permit issuance. All plans will be checked at the counterfor
completeness. lf any of the required information is missing, the building permit application cannot be
accepted.
SITE PLAN: Please make sure the following information is provided on the site plan.
. Propertyaddress/legal description.r North Arrow and Scale on each page.. Show all property lines, building envelopes, flood plain and easements.¡ Provide setback distances from boundaries, buildings, septic, well and watennrays.. Location and direction of the county or private road and driveway accessing the property.
. Proposed and existing structures. lnclude sheds, barns, decks, patios and any other buildings.r Existing and proposed grade, positive drainage around structure (to be contained on site).. Streams, rivers, creeks, springs, ponds and ditches.e Existing and proposed wells, septic tanks, leach fields, and other systems (if applicable).r Retaining walls (engineer stamped detail required for walls over 4 ft., measured from bottom of
footing to top of wall).
NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property
line or not within an established building envelope shall be prepared, stamped and signed by a licensed
surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision
final plat with the proposed structure located in the building envelope.
COVER SHEET:. Projectidentification.. Project address and/or legaldescription.. Design specifications to include building use and occupancy classification, type of construction,
building height and area calculations, occupant load, and fire sprinkler systems.
ARCHITEGTURAL PLANS: Please provide the following information on the architecturalplans.
. Per C.R.S. 124-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Design Professional stamped plans.
Minimum of 4 elevations (N,S,E,W).
Floor plans for each level, including dimensions and scale noted.
Clearly label each room or space (office, storage, mechanical, elevator, etc).
Walltypes; clearly labeled and referenced. ldentifo allfire resistive wallconstruction.
Construction details for all fire resistive elements referenced on floor plans and cross sedions.
lnclude wall, floor/ceiling, roof/ceiling, shaft wall assemblies and structuralframe. Provide the fire
resistive listing number referenced on each assembly detail. (ex. UL P123)
Window and door sizes, types and operation and direction of swing noted on the floor plan.
Specify roof slope/pitch, roof covering and siding materials.
Energy design specifications/details for R-values, U-factors and SHGC's per IECC.
Stair and guard details specifying rise, run, height and spacing.
Accessibility; show compliance with accessibility requirements for all elements of the building per
lBC, Chapter 11 and ICC/ANSI A 117.1, ADA, FHA, and UFAS.
STRUCTURAL PLANS: Please provide the following information on the structural plans.
o per C.R.S. 124-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Engineer stamped plans.
. Engineered foundation design per soils report. Geotechnical report referenced.
. Design specifications to include roof and deck snow load, wind and seismic design and frost
dePth.. Foundation plan showing complete footing and foundation dimensions.
r Footing and foundation details specifying reinforcement referenced on plans.
. Framing plans for each floor level and roof. All beams, columns, ioists, rafrers, trusses and all
live/dead loads sPecified.r Framing /connec'tion details referenced on plans.
r Pre-manufactured structures require an engineer's stamp, signature and date.
MECHANIGAL PLANS: Please provide the following information on the mechanical plans.
. per C.R.S. 124-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Engineer stamped plans.
r Energy design calculations and details verifying compliance with the 2009 IECC.
o Floor plans for each level showing size, location and materials of all ductwork, plenums, return
and outside air intake registers.. Size and location of all combustion air ductwork and openings.
r size, type and termination of allgas appliance flues and vents.
r Location of all fire and combination smoke/fire dampers'
r Equipment schedule for all mechanical equipment (boiler, furnace, exhaust fans, etc.).
. Commercialkitchen hood location, hood and duct sizes, CFM calculations.
PLUMBING PLANS: Please provide the following information on the plumbing plans.
. per C.R.S. 124-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Engineer stamped plans.
r Floor plans for each levelshowing DWV layout and sizing, materials, slope and sewer location.
. Water piping materials, length and size of pipe, water meter location, fixture unit demands,
location and type of backflow prevention devices.
. Gas piping materials, length and size of pipe, gas meter location and BTU/hour demands.
. Additional piping plans for roof/deck drains, condensate, medicalgas, etc.
r Plumbing fixture schedule for all plumbing equipment'
. Commercial kitchen plumbing fixtures, food preparation equipment, grease interceptors, ctc.
ELECTRICAL PLANS: Please provide the following information on the electrical plans.
r per C.R.S. 124-112; Structures designed with an occupant load exceeding 10 require Colorado
State Licensed Engineer stamped plans.
. Floor plans for each level showing location of lighting fixtures, switches, receptacles, emergency
exit signs and lþhting and panel location.
o Diagram showing service entrance, conduiUwire size, main disconnect size, grounding
electrode/conductor size, feeder conduit/wire size, transformers and generators.
. Panel schedule showing bus/breaker sizes, circuit description, voltage, phase, amperage, etc.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Officialthat additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The Permit Fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by a person having written authority from the
owner to act as their representative.
I hereby acknowledge I have read, understand, and will abide with the requirements of this
checklist.
4- eÙ*( f
Print and Sign Date