Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-O4-t8-5229 Red Barn Guest Ranch - Carriage House Event Center 345 Mid-Valley Lane, County Road 262 New Castle, Colorado 1) ALL WORK TO COMPLY WITH THE 2015 LB.C., l.M.C., l.P.C., LF.G.C., THE 2009 l.E.C.C., I.F.C., AND IN ACCORDANCE WITH MANUFACTURERS' INSTALLATION INSTRUCTIONS. 2') REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND INSPECTIONS POLICY. 3) ALL WORK MUST COMply W|TH CONDTTTONS OF THE CURRENT LAND-USE PERMIT, RESOLUTION NO.2018-T6 4) BUtLDtNG tS APPROVED AS NON-SPRINKLERED, CONSTRUCTION TYPE V-B WITH OCCUPANCY/USE = ASSEMBLY GROUP A-2. 5) pROVtDE COpy OF ENGTNEER'S FTNAL TNSTALLATION REPORT FOR NEW SEPTIC SYSTEM, INCLUDING SIZING OF SYSTEM AND DESIGN CRITERIA TO ACCOMMODATE ALL NEW occupANctEs/usE wtTHtN EXTSTTNG BUTLDTNGS (CARRIAGE HOUSE, GUEST HOUSE & BRTDAL SUrTE). 6) CONTACT LOCAL FtRE D|STR|CT FOR PERTINENT r.F.C. REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) REFERENCE ATTACHED STRUCTURAL ENGINEER'S EVALUATION REPORT OF EXISTING STRUCTURE, AND INCORPORATE ALL PERTINENT REQUIREMENTS FOR BUILDING CODE COMPLIANCE AS CONTAINED IN THIS REPORT. 8) LOCKS, LATCHES & LANDINGS PER l.B.C., SECTION 1-008. 9) ACCESS|BtLTy REQUTREMENTS - tNCLUDING ACCESSIBLE ROUTES, ENTRANCES, DOORS, PLUMB|NG ELEMENTS & FAC|LIT|ES - PER LB.C., CHAPTER LL, AND ICC/ALL7.L-20O9. 10) LTGHT AND VENTILATION PER l.B.C., CHAPTER 12. L1)pLUMBtNG REQUTREMENTS PER r.B.C., CHAPTER 29 & INTERNATIONAL PLUMBING CODE 12) MECHANTCAL & VENTTLATTON REQUIREMENTS PER INTERNATIONAL MECHANICAL CODE, L3) ELECTRTCAL REQUTREMENTS, PERMTTTING & INSPECTIONS PER STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAMING INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.