Loading...
HomeMy WebLinkAboutObservation of Pit Excavations, Stairway, and Deck Additions 10.30.18*s/¿¿ctr'J+€s77 H-PVKUMAR Geotechnical Engineering I Engineering Geology Materials Testing I Environmental 5020 County Road 154 Glenwood Springs, C0 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email : hpkglenwood@kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, Summit County, Colorado October 30, 2018 Go Handy Andy Attn: Andy Womack 600 East Street Rifle, Colorado 81650 gohand)¡andyqo @ gmail. com Project No. 18-7-631 Subject:Observation of Pit Excavations, Stairway and Deck Additions, Lot 15, Cerise Ranch, 389 Larkspur Drive, Garfield County, Colorado Gentlemen As requested, a representative of H-P/Kumar observed the excavation at the subject site on October 24,2018 to evaluate the soils exposed for foundation support. The findings of our observations and recommendations for the foundation design are presented in this report. The services were performed in accordance with our agreement for professional engineering services to Go Handy Andy, dated October 18, 2018. Hepworth-Pawlak Geotechnical (now HP/Kumar) previously conducted a subsoil study for the residence foundation design at the site and presented the findings in a report dated July 10, 2006, Job No. 106 0474. Piers for the stairway and deck supports have been constructed and it is desired to evaluate the suitability of the bearing soils for foundation support. Spread footings placed on the natural soils and sized for an allowable bearing pressure of 1,200 psf were designed for support of the piers. At the time of our visit to the site, four pit excavations had been made next to existing "Bigfoot" piers each cut to a depth of4 feet below the adjacent ground surface. The soils exposed in the bottom of the excavations consisted of silty sandy clay with fine gravel. Results of swell- consolidation testing performed on a sample taken from the site, shown on Figure 1, indicate the soils are slightly to moderately compressible under conditions of light loading and wetting. The laboratory test results of samples taken from the pits and their locations are summarized in Table 1. A fourth pit with similar soil conditions had been dug at grid 13 & D but the soils were not tested. No free water was encountered in the excavations and the soils were moist to very moist. Considering the conditions exposed in the pit excavations and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for an allowable soil bearing pressure of I,200 psf should be adequate for support of the proposed stairway and deck piers. The clay soils tend to compress under load and there could be post-construction settlement of the foundation depending on the actual bearing conditions and foundation loading. Go Handy Andy October 30, 2018 Page 2 The recommendations submitted in this letter are based on our observation of the soils exposed within the pit excavations and do not include subsurface exploration to evaluate the subsurface conditions within the loaded depth of f'oundation influence. This study is based on the assumption that soils beneath the footings have equal or better support than those exposed. Possible variations in the subsurface conditions could increase the risk of future settlement. If you have any questions or need further assistance, please call our office. Sincerely, H-P* KUM.AR Steven L. Pawlak, P.E. SLPlksw Attachments: Figure 1 -Test Results Table I - Summary of Laboratory Test Results r ðä32 t\ { t 7Ð H-PVKUMAR rroJecl r\o. l ö- /-þJ l ¡ 3 ! 3. e t ¡ SAMPLE OF: Silty Sondy Cloy wilh Grovel FROM: Botlom of Pil Excovalion/Grid -0.6A & 10.5 WC = 10.6 %, DD = 1il pcf I NO MOVEMENT UPON WETTING \I {L i I I I I 1 r¡.!. ¡ar¡ Gutrr oPdy o¡t lo tùaEñphr tdtd. Th. t.rtìry 6Þ04 ùoH nol & r!øodæ.d, üc¡Þl i^rdl. rùoul h rdltrñ oFed of(und oñd bmbt6, tæ. Sr.I:oMfidolbñ irlliry Fd@d iñrcdoñcr rilh ÆB O-a546. 0 -JJ -ll¡l =tñt-z zo F- ô otnzoo_4 t,0 - KSF t00 1 8-7-631 H-PryKU]VIAR SWELL_CONSOLIDATION TEST RESULTS Fig. 1 H-P*KUMARTABLE 1SUMMARY OF LABORATORY TEST RESULTSProject No. 18-7-631NATURALMOISTURECONTENTNATURALDRYDENSlTYPERCENTPASSINGNO.200SIEVEBERG LIMITSUNCONFINEDCOMPRESSIVESTRENGTHBottom of PitExcavation/GridGRAVELSANDLIQUIDLIMITPLASTICINDEXsotL oRBEDROCK TYPE(%t%t-O.sA & 9t4.510760Silty Sandy Clay withGravel-0.6A & 10.510.6111Silty Sandy Clay withGravelSilty Sandy Clay',rrithGravel6248I9919.4F&13