HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
B LRE-01 -L9-5623 a nd SE PT-01 -19-5624
Forest Matis
New Single-Family Residence
l-04 Creek Side Drive - Rifle, Colorado
Creek Side Estates - Lot 2
1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (r.R.C.)
AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2l pRoposED tMpRovEMENTS ARE SUBJECT TO ALL APPLTCABLE |TEMS CONTATNED lN THE
ATTACHED "GARFIELD COUNTY BUILDING REQUI REM ENTS". N UM BERED REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) OPEN-HOLE SOTLS REPORT REQUTRED AT FOOTING INSPECTTON TO VERTFY 3,000 P.S.F.
SOILS BEARING CAPACITY. ENGINEER SHALL ALSO VERIFY PLACEMENT OF COMPACTED
STRUCTURAL FILL = 3,000 P.S.F. PER SOILS REPORT RECOMMENDATIONS.
4) ALL STRUCTURES - TNCLUDtNG ROOF OVERHANGS, DECKS & PROJECTIONS - SHALL
BE FULLY CONTAINED WITHIN THE PLATTED BUILDING ENVELOPE. PROVIDE A LOT
IMPROVEMENT SURVEY VERIFYING THIS REQUIREMENT AT FOUNDATION INSPECTION
5) AN ELEVATTON SURVEY, SEALED BY A COLORADO PROFESSIONAL LICENSED SURVEYOR,
IS REQUIRED AT FRAME INSPECTION TO VERIFY THAT AS-BUILT ROOFS COMPLY WITH
GARFIELD COUNTY,S 25-FOOT BUILDING HEIGHT LIMIT AS DEFINED IN THE LAND USE
DEVELOPMENT CODE.
6) ON-S|TE WASTEWATER TREATMENT SYSTEM (O.W.T.S.) SHALL BE DESIGNED BY A
COLORADO LICENSED PROFESSIONAL ENGINEER. DUE TO THE PRESENCE OF SHALLOW
GROUNDWATER, EVAPO-TRANSPIRATION SYSTEMS ARE NOT ALLOWED. PROVIDE COPY
OF ENGINEER,S O.W.T.S. DESIGN FOR INSPECTOR REVIEW AT JOB SITE. ENGINEER,S
INSTALLATION REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION AND
CERTIFICATE OF OCCUPANCY.
7) O.W.T.S. SHALL MAINTATN 5o-FOOT MTNIMUM SETBACK FROM TOP OF THE BANK OF
RTFLE CREEK (OTHERWISE KNOWS AS L00-YEAR FLOODPLAIN).
8) A COLORADO STATE LTCENSED ELECTRICTAN AND PLUMBER MUST PERFORM SYSTEM
INSTALLATION AND HOOK-UPS, UNLESS THE HOMEOWNER IS SELF-PERFORMING THIS
WORK.
9) ELECTRTCAL pERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRTCAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.