Loading...
HomeMy WebLinkAboutOWTS Installation Report 03.21.2019KENNETH J. BROTSKY, PE GRAND JUNCTION, CO 81507, CONSULTING ENGINEER 970 216 8861 March 21, 2019 Re: On -Site Wastewater Treatment System 1161 CR 237 Silt, CO To Whom It May Concern: This is to Advise that inspections were made during construction of the above referenced OWTS and that the system has been constructed essentially in accordance with the approved Plans and Specifications. Ties from the house corners to the septic tank, manifold tee, and the centerline of the north end of the absorption bed are shown on the attached "Construction Plan of Record". Additionally, the "Vent/Inspection Ports" mark the end of the absorption field. Sincerely, KENNETH J. BRO Y, PE 0 To el • 0 • /4'o-, 3; ,; 39 -4g 75 16 P 9a-®" ,4/W ese,' /-/e3e/5E 6. •► re49 e "O 17�AJ/ dam r6-6 xivArr/-1 ht ---AAP 0� &Ea QUICK -4 INFILTRATORS 4 ROWS, 12 EACH ROW = 48 TOTAL INSTALLED BY: MELVIN WEAVER VENT/INSPECTION PORTS 1000 GALLON ----• SEPTIC TANK CONCRETE ,�-- CLEANOUT C°SSINkt 80 Owi VOV 511�E►91 l�5 CONSTRUCTION PLAN OF RECORD ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) 1151 CR 237 SILT, COLORADO GARFIELD COUNTY