HomeMy WebLinkAboutOWTS Installation Report 03.21.2019KENNETH J. BROTSKY, PE
GRAND JUNCTION, CO 81507,
CONSULTING ENGINEER
970 216 8861
March 21, 2019
Re: On -Site Wastewater Treatment System
1161 CR 237
Silt, CO
To Whom It May Concern:
This is to Advise that inspections were made during construction of the above referenced
OWTS and that the system has been constructed essentially in accordance with the
approved Plans and Specifications. Ties from the house corners to the septic tank,
manifold tee, and the centerline of the north end of the absorption bed are shown on the
attached "Construction Plan of Record". Additionally, the "Vent/Inspection Ports" mark
the end of the absorption field.
Sincerely,
KENNETH J. BRO Y, PE
0
To
el
•
0
•
/4'o-,
3; ,;
39 -4g
75 16 P
9a-®"
,4/W ese,' /-/e3e/5E
6. •►
re49 e "O
17�AJ/ dam r6-6
xivArr/-1 ht ---AAP
0� &Ea
QUICK -4 INFILTRATORS
4 ROWS, 12 EACH
ROW = 48 TOTAL
INSTALLED BY: MELVIN WEAVER
VENT/INSPECTION PORTS
1000 GALLON
----• SEPTIC TANK
CONCRETE
,�--
CLEANOUT
C°SSINkt 80
Owi VOV 511�E►91
l�5
CONSTRUCTION PLAN
OF RECORD
ON-SITE WASTEWATER TREATMENT
SYSTEM (OWTS)
1151 CR 237
SILT, COLORADO
GARFIELD COUNTY