Loading...
HomeMy WebLinkAboutBolt Inspection Report 01.29.19THUI{DER MOUNTATI{ TESTING 2970 N. Ronlin Avenue / Grand Junction, Colorado 81504 Office (970) 256-e965 / Cell (970) 210-7A08 / Fax (970) 314-7067 B-Mail: kxkid3g@aol.com / www.thundermountaintesting.com [-ee Marten I 735 CR 293 Rifle. CO 8l ó50 RE Rcsrrectlìrl I y Submittecl. ú*Ul ,!^*þ^ Daniel l. Bricker AWS CWt #090s205 r Dear Mr. Marten. As requested, structural steel special inspection was conducted per the ItlC 2015 Edition - Chapter l7: Structural J'ests and Special Inspection and the Garlìeld county requirements. I arrived on-site at 9:004M. I met with you to review material to be inspected and Froject specifications. High Strength bolting inspection u,as conducted at the Roof Framing Level on the metal building project being erected on your location in accordance with the pre-engineered drawing provided by Westar Engineering: Drawing # 81. All bolting on site was comprised of Yz" and'/0" AS'|M 4325 l-liglr Strength bolts and heavy hex nuts as required. During my inspection, I observed the bolts did not meet the thread and a half standard penetration througlr the nut that is the standard fbr bolted installations per AISC Requirements. A total ol'20 bolts had to be replaced on the center rib of the building with longer bolts and were repaired immediately upon nry request. lJpon cornpletion, the bohs inspecteel were observed to be in compliance with project specilìcationsand the requirements stated in Section 9.1 of the Specification for Structural .loints using 4325 or 4490 Bolts issued by the Research Council on Structural f--onnections. MaÍen's Steel Building 1735 CR 293 Iìifle. CO 81435 +l{igh Strength l}olting Inspection January 29.2019 Permit #BLRE-O7- I 8-5385 AWS CWI #el0402At ICC Certified #0863569-5l & 52 ASNT NDI' I-evel lll #30242 n'festing [4axwell 91040201 EXP.4t1t2021 'festing'I'hunder n021 1