Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLM F-t2-t8-5593 CMH Homes, lnc. New Manufactured 2-Family Residence w/Basement TBD Sec34, T05S, R89W - Glenwood Springs Mountain Shadow Place, Lot L L) FOUNDATTON, BASEMENI CRAWL SPACE & ALL OTHER SITE-BUILT WORK SHALL COMPLY W¡TH 2015 I.R.C., 2OO9 I.E.C.C. AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 3) ALL WORK MUST COMpLy W|TH REQUTREMENTS OF THE LAND USE CHANGE PERMIT # cApA-o8-\7-8s71tNCLUDtNG SUBD|VTSTON TMPROVEMENTS AGREEMENT (S.l.A.)AND MOUNTAIN SHADOW PLACE AMENDED FINAL PLAT. PER CONDITIONS OF THE LAND USE PERMtT, THtS STRUCTURE SHALL CONTAIN A MAXTMUM OF ONLY TWO (2) RESIDENTIAL DWELLING UNITS. 4) MANUFACTURED HOUSES ARE REGULATED & TNSPECTED BY COLORADO DEPT. OF HOUSING (c.D.o.H.) AND ALL FACTORY-BUtLT STRUCTURES TNSTALLED lN GARFIELD COUNTY SHALL COMPLY WITH C.D.O.H. GUIDELINES FOR MANUFACTURE & INSTALLATION ATTHE JOB SITE. GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 5) A LOT TMPROVEMENT CERT|F|CATE, SEALED BY A COLORADO LICENSED SURVEYOR, lS REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE IS IN COMPLIANCE WITH BU I LDI NG SETBACK REQU IREM ENTS I NCLU DI NG ROOF PROJ ECTIONS. 6) GEOTECHNTCAL ENGTNEER TO CONDUCT OPEN-HOLE SOILS REPORT VERIFYING 1-,500 P.S.F. SOILS BEARING REQUIREMENT AND PLACEMENT OF COMPACTED STRUCTURAL FILL. PROVIDE COPY OF ENGINEER,S REPORT PRIOR TO FOOTING & FOUNDATION INSPECTION. 7) DWELLTNG UNTTS tN TWO-FAM|LY DWELLTNGS SHALL BE SEPARATED FROM EACH OTHER BY WALL AND FLOOR ASSEMBLIES HAVING NOT LESS THAN A ONE-HOUR FIRE-RESISTANCE RATING. FIRE SEPARATION BETWEEN UNITS SHALL BE CONTINUOUS EXTENDING FROM FOUNDATION OR FOOTING UP TO UNDERSIDE OF ROOF SHEATHING, AND WALLS SHALL EXTEND TO AND BE TTGHT AGATNST EXTERIOR WALLS. (1.R.C., SECTIONS R302.3 & R302.4) 8) BUtLDtNG SHALL BE pROVtDED W|TH RESTDENTIAL FIRE SPRTNKLER SYSTEM lN ACCORDANCE WITH NFPA 13D. COORDINATE ALL FIRE SPRINKLER REQUIREMENTS, INSPECTIONS & APPROVALS WITH LOCAL FIRE DISTRICT. PROVIDE FINAL APPROVAL LETTER AND SIGN-OFF REPORT FOR INSPECTOR REVIEW PRIOR TO FINAL BUILDING INSPECTION. 9) ALL PLUMB|NG AND GAS prPtNG CONNECTTONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 10) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCU PANCY.