HomeMy WebLinkAboutOWTS Design Report 10.19.2017Date:
lo -/9--/7
Location: . 9a2ere_
Inspection Report OWTS
Owner: Svu,e. .25 tfG- 4Z- 7 IC 7
OWTS Design Worksheet:
Number of Bedrooms
3 -I /000
II. Design Flow Table 6-1
III. Soil Evaluation- Soil type
Profile Hole Notes 647
Ave. Perc. Rate
4t 3'
Long Term Acceptance Rate (LTAR) Table 10-1
IV. Determine Soil Treatment Area (STA))
STA = Design Now (Gal/dav) = Y.10 (Gal/day)
LTAR (Gal/day/sq.ft.) (Gal/day/sq.ft.)
V. Size Adjustment Factors -Methods of Application and Types of Distribution Table 10-2 and Table 10-3.
t520 sq. ft.
Trench v"
Bed
Chambers
Other options
Design Treatment Area = STA sq.ft
Design Treatment Ar'a = g9D0
Design Treatment Area =
. x Application Factor x Storage/Distribution Factor.
sq.ft x i 7 Ar 6"3o
sq.ft.
VI. Number of Chambers.
Design Treatment Area sq.ft. = Number of Chambers
Sq. ft. pet- chamber
General Notes and Directions to Installer:
12,
J
�` n
W