HomeMy WebLinkAbout4.0 PermitVIII r WILPiFirrigHiLIMIA11. 11 III
Reception#: 920621
05/22/2019 09:50'07 AM Jean Alberioo
1 of 4 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO
LAND USE CHANGE PERMIT
for
An approximately 1.25 acre leased area of a 35.308 acre property owned by
CRC LLC located at 87 County Road 103, approximately 1.4 miles east of the
Town of Carbondale, in Section 26, Township 7 South, Range 88 West of the 6th
Principal Meridian as described in an exemption plat filed for record at
Reception No. 870370 in the office of the Garfield County Clerk and Recorder
(Assessor's Parcel No. 2393-264-00-007)
In accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code of 2013, as amended, a Resolution of Approval (Resolution Number
2019-32.) of the Board of County Commissioners of Garfield County, State of Colorado,
the following activity is hereby authorized by Land Use Change Permit:
A Retail, General — Stone Yard as shown on the Site Plan Attached as Exhibit A
(GAPA-01-19-8704)
This Land Use Change Permit is issued subject to conditions of approval as set forth in
Exhibit "B". The Permit shall be valid only during compliance with such conditions and
other applicable provisions of the Garfield County Land Use and Development Code, as
amended, Building Code, and other regulations of the Board of County Commissioners
of Garfield County, Colorado.
ATTEST:
41
;2e-11-7
GARFI LD COUNTY BOARD OF
COUN COM ISSIONERS,
GARFI LD COU TY, COLORADO
erk of the Board
-S/919
Chai,• - _ ' Date
uJ1 Ir1FAIONAli 41164 ilk 11 II I
Reception#: 920621
05/22/2019 O:507 AM Jean Alberico
2 of 4 Rec Fee:$0. 00 Doc Fee:O.00 GARFIELD COUNTY CO
Exhibit A
(Project Site Plan)
NS.
L
1
.,..„
•
E; 0 0 C:17. 1:3 171
2
.•—•
D
11
0
0
r
0
cl ca EJ ca Eva cm 4
11IE1)11�i41I1.Wfiil1,1'ktilitlkl.11111
Reception#: 920621
05/22/2019 09:50:07 PM Jean Rlberloo
3 of 4 Rec Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO
• Exhibit B
Conditions of Approval
1. All representations made by the Applicant in the application shall be conditions of
approval unless specifically altered by the Board of County Commissioners.
2. The operation of the Stone Yard shall be done in accordance with all applicable
Federal, State, and local regulations governing the operation of this type of facility,
including, but not limited to OSHA requirements.
3. The applicant shall be permitted to use handicap accessible portable toilets, and/or
a vault and haul system, for wastewater management on the site for a period of 3 -
years from the date of the issuance of the Land Use Change Permit.
a. Prior to the expiration of this 3 -year period, the applicant shall either provide
an alternate long-term water and wastewater system including an OWTS,
acceptable to the Community Development Department and obtain all
required permits for the facility or the applicant shall discontinue the use.
b. If permanent connections to sewer and water services are available before
the expiration of the 3 -year period, the applicant shall be required to connect
to those services at the time they are available.
4. The applicant shall be permitted to use a 5 -gallon tank for potable water on the
site. Potable water shall be available at all times for the employees on the site and
the public.
5. Prior to the operation of the facility, the applicant shall have required provisions for
potable water and wastewater management in place, including a hand wash
station.
6. Prior to the operation of the facility, the applicant shall have concrete barriers and
fencing in place around the border of the facility.
7. The applicant shall obtain any Building Permits as required by Garfield County,
including for the office, gazebo, and tool shed. The operation of the site does not
require that those facilities are in place prior to operation, however, under no
circumstances may a structure be built or installed without obtaining required
Building Permits.
8. The applicant shall designate additional parking spaces for employee parking.
9. The drive aisles, access to the site, and parking areas shall have a durable all-
weather surface made of materials that are suitable for the proposed uses.
10. Any lighting on the site shall be compliant with Land Use and Development Code
standards.
3
1111 lin/11MM AL h.rgkillF1hiiMNikki 11 ii1
Reception#: 920621
05!2212019 09:50:07 RM Jean Rlberico
4 of 4 Rec Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO
11. If an irrigation ditch is later located on the property, in the area of the Stone Yard,
the applicant shall maintain compliance with Section 7-201 (E) of the Land Use
and Development Code of 2013, as amended.
12. The applicant shall comply with any Reclamation requirements for the gravel pit.
13. The applicant shall maintain receipts for the purchase/delivery of hauled water and
provide the receipts to the local water commissioner upon request.
4