BLCO-05-19-5747
Colorado Rocky Mountain School
Addition/Remodel of Existing Solar Dormitory
152 Pabst Drive — Carbondale, Colorado
1) ALL NEW WORK SHALL COMPLY WITH THE 2015 I.B.C., I.F.C., I.M.C., I.P.C., I.F.G.C. AND
2009 I.E.C.C., AND MANUFACTURER'S INSTALLATION REQUIREMENTS. IN ADDITION,
ALTERATIONS TO THIS EXISTING BUILDING SHALL COMPLY WITH REQUIREMENTS OF
"LEVEL 2 ALTERATIONS" AS DEFINED IN THE 2015 INTERNATIONAL EXISTING BUILDING
CODE (I.E.B.C.) MORE SPECIFICALLY INCLUDING CHAPTERS 7 AND 8, AS APPLICABLE.
2) SEE PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
INSPECTIONS POLICIES. ALSO, REFER TO "PLAN ANALYST" CODE REVIEW COMMENTS
AS ATTACHED TO PLANS FOR BUILDING CODE ISSUES PERTINENT TO THIS PROJECT.
3) WORK SHALL COMPLY WITH "RURAL" ZONE DISTRICT REGULATIONS PER GARFIELD
COUNTY'S LAND USE & DEVELOPMENT CODE, AS WELL AS CONDITIONS OF THE SPECIAL
USE PERMIT.
4) PRIOR TO CONSTRUCTION, APPLICANT SHALL CONTACT LOCAL FIRE DISTRICT FOR FIRE
CODE REQUIREMENTS INCLUDING: AUTOMATIC FIRE SPRINKLER SYSTEM, FIRE ALARM
SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL REPORT
FROM LOCAL FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION AND
CERTIFICATE OF OCCUPANCY.
5) EGRESS CORRIDOR WALLS AND WALLS SEPARATING DWELLING OR SLEEPING UNITS
FROM ONE ANOTHER SHALL BE CONSTRUCTED AS "FIRE PARTITIONS" (I.B.C., SECTION
708.1) WITH A FIRE -RESISTANCE RATING OF 1/2 -HOUR. DOOR OPENINGS ARE REQUIRED
TO BE PROTECTED WITH 20 -MINUTE FIRE ASSEMBLIES AND SHALL BE SELF-CLOSING OR
AUTOMATIC CLOSING.
6) ACCESSIBILTY OF THIS PUBLIC BUILDING SHALL COMPLY WITH 2015 I.B.C. (CHAPTER 11)
AND ICC/A117.1-2009 ACCESSIBILITY STANDARDS. (*NOTE: SEE I.E.B.C., SECTION 705
FOR EXCEPTIONS)
7) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12.
8) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AIR, DUCTWORK AND
VENTING REQUIREMENTS PER I.M.C. & I.E.C.C., SECTION 503. MECHANICAL ROUGH -IN
INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
9) PLUMBING REQUIREMENTS PER I.P.C. AND I.F.G.C. PLUMBING ROUGH -IN INSPECTION
REQUIRED PRIOR TO FRAME INSPECTION.
10) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL I5 REQUIRED AT FRAMING
INSPECTION, AND ELECTRICAL FINAL SIGN -OFF APPROVAL IS REQUIRED PRIOR TO FINAL
BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. VERIFY DIRECTIONAL EXIT SIGNS
& EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.