Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-05-19-5747 Colorado Rocky Mountain School Addition/Remodel of Existing Solar Dormitory 152 Pabst Drive — Carbondale, Colorado 1) ALL NEW WORK SHALL COMPLY WITH THE 2015 I.B.C., I.F.C., I.M.C., I.P.C., I.F.G.C. AND 2009 I.E.C.C., AND MANUFACTURER'S INSTALLATION REQUIREMENTS. IN ADDITION, ALTERATIONS TO THIS EXISTING BUILDING SHALL COMPLY WITH REQUIREMENTS OF "LEVEL 2 ALTERATIONS" AS DEFINED IN THE 2015 INTERNATIONAL EXISTING BUILDING CODE (I.E.B.C.) MORE SPECIFICALLY INCLUDING CHAPTERS 7 AND 8, AS APPLICABLE. 2) SEE PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND INSPECTIONS POLICIES. ALSO, REFER TO "PLAN ANALYST" CODE REVIEW COMMENTS AS ATTACHED TO PLANS FOR BUILDING CODE ISSUES PERTINENT TO THIS PROJECT. 3) WORK SHALL COMPLY WITH "RURAL" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE, AS WELL AS CONDITIONS OF THE SPECIAL USE PERMIT. 4) PRIOR TO CONSTRUCTION, APPLICANT SHALL CONTACT LOCAL FIRE DISTRICT FOR FIRE CODE REQUIREMENTS INCLUDING: AUTOMATIC FIRE SPRINKLER SYSTEM, FIRE ALARM SYSTEM, FIRE EXTINGUISHERS & OTHER PERTINENT ITEMS. FINAL APPROVAL REPORT FROM LOCAL FIRE DISTRICT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION AND CERTIFICATE OF OCCUPANCY. 5) EGRESS CORRIDOR WALLS AND WALLS SEPARATING DWELLING OR SLEEPING UNITS FROM ONE ANOTHER SHALL BE CONSTRUCTED AS "FIRE PARTITIONS" (I.B.C., SECTION 708.1) WITH A FIRE -RESISTANCE RATING OF 1/2 -HOUR. DOOR OPENINGS ARE REQUIRED TO BE PROTECTED WITH 20 -MINUTE FIRE ASSEMBLIES AND SHALL BE SELF-CLOSING OR AUTOMATIC CLOSING. 6) ACCESSIBILTY OF THIS PUBLIC BUILDING SHALL COMPLY WITH 2015 I.B.C. (CHAPTER 11) AND ICC/A117.1-2009 ACCESSIBILITY STANDARDS. (*NOTE: SEE I.E.B.C., SECTION 705 FOR EXCEPTIONS) 7) LIGHT, VENTILATION & TEMPERATURE CONTROLS PER 2015 I.B.C., CHAPTER 12. 8) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AIR, DUCTWORK AND VENTING REQUIREMENTS PER I.M.C. & I.E.C.C., SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 9) PLUMBING REQUIREMENTS PER I.P.C. AND I.F.G.C. PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 10) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL I5 REQUIRED AT FRAMING INSPECTION, AND ELECTRICAL FINAL SIGN -OFF APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.