HomeMy WebLinkAboutProject Completion Certification of Acceptance, Access Permit No. 317090COL$RAÞO
W eW wt rw ewt. tzl "{ x anxPwYtmti*n
Region 3 Traffic Section
zz7.s6th sr, Rm 100
Grand Junctìon, Colorado 81 501
(970) ó83-ó284
July 23, 2018
ATTN:
Aspen Polo Partners, LLC
715 West lvtain Street Suite 201
Aspen, Colorado 8l ó1 I
RE: pRoJEcr coi pLETtoN cERTTFTCATE oF AccEprANcE, AccEss PERMIT
NO. 31 7490
Dear Permittee or APPticant
A site inspection of the construction requirements for the above permit reveated it to be
acceptabte and in generat conformity with the terms and conditions of the permit. The
inspection conducted by Cotorado Department of Transportation {CDOT) is onty for the
general conformance of permit construction with CDOTs design standards and Code
requirements. lt does not release the Permittee of the responsibitity to futty comply with
the appticable provisions of the access permit and State Highway Access Code.
ln accordance with the Subsection 2.5(6) of the State Highway Access Code, "lf any
construction element faits within two-years due to improper construction or material
specifications, the Perrnittee shalt be responsible for all repairs. Failure to make such
repairs may resutt in suspension of the permit and closure of the access".
You are advised that your 2-year warranty period begins from the date of project
acceptance, in accordance with the permit terms and conditions and the Access Code. You
(the permittee/owner) are advised that the date of acceptance is: July 23, 2018
lf you have any questions, please contact me at: (970) ó83-ó28ó
Sincere
n
Region 3 Project Manager
222 5 6rh 5t, Rm 100, Grand Junction, Colorado 81501 P (970) 683-6284 F (970) ó83'6290 https://codot.gov/accesspermits
Ç,&a& w e,w w
W*ç*a{tuxluuztwÊVwarz*pæxt"ækiwxt
Region 3 Traffic Section
222 5 óth 5t, Rm 100
Grand Junction, Cotorado 8150'l
p7a]' 683-6284
Juty 23, 2018
ATTN:
Aspen Polo Partners, LLC
715 West Main Street Suite 201
Aspen, Colorado 8161 1
RE: pRoJEcT coMPLETIoN CERTIFICATE oF AccEPTANCE, AccEss PERMIT
NO.317091,
Dear Permittee or APPticant
A site inspection of the construction requirements for the above permit revealed it to be
acceptabie and in generat conformity with the terms and conditions of the permit. The
lnipé.iion conductäd by Col,orado Department of Transportation (CDOT) is onty for the
leÅerat conformance of permit construction with CÐOTs design standards and Code
i"quir"*"nts. lt does noi retease the Permittee of the responsibitity to futty. compty with
the appticable provisions of the access permit and State Highway Access Code'
ln accordance with the Subsection 2.5(ó) of the State Highway Access Code, "lf any
construction etement fail,s within two-years due to improper construction or material
speiifications, the Permittee shatl be responsible for att repairs' Failure,to make such
ràpairs may resutt in suspension of the permit and ctosure of the access".
you are advised that your 2-year warranty period begins from the date of project
acceptance, in accoráance with the permit terms and conditions and the Access Code. You
lthe þermitiee/owner) are advised that the date of acceptance is: Juty 23' 2018
lf you have any questions, please contact me at: (970) 683-6286
Since
Devin
Region 3 Project Manager
?2:.5 6\h st, Rrn 100, Grancl Junction, cotorado 81501 P (970) ó83-6284 F t970) 683'629Û https:llcodot'gôv/âccesspermìts