HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
B LRE-05 -L9-57 67 and S E PT-05 -19-57 68
Marcos Renova
New Single-Family Residence
l-4 Native Springs Drive, Rifle
Native Springs - Lot 4
1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNAT¡ONAL RESIDENTIAL CODE (l.R.C.)
AND 2OO9 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) TMPROVEMENTS ARE SUBJECT TO ALL APPLTCABLE ITEMS CONTAINED lN THE ATTACHED
,,GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON
PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) OPEN-HOLE SOTLS REPORT REQUTRED AT FOOTING INSPECTION TO VERIFY 1200 PSF
4l pRtoR To FoUNDAT|ON tNSPECTION BUTLDTNG LOCATION TO BE STAKED/CERTIFIED BY
PROFESSIONAL LICENSED SURVEYOR TO CONFIRM BUILDING IS LOCATED WITHIN THE
PLATTED BUI LDI NG ENVELOPE.
s) DWELLTNG UNtT REQUTRES TNSTALLATTON OF RESIDENTIAL FIRE-SPRINKLER SYSTEM.
VERIFY REQUIREMENTS & COORDINATE INSPECTIONS WITH RIFLE FIRE DISTRICT,
INCLUDING FIRE DISTRICT ROUGH-IN APPROVALAT FRAME INSPECTION. FIRE DISTRICT
stcN-oFF/APPROVAL REQUTRED PRrOR TO FrNAL BUILDING INSPECTION & CERTIFICATE
OF OCCUPANCY.
6) ON-SITE WASTEWATER TREATMENT SYSTEM TO BE INSPECTED BY A PROFESSIONAL
ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER,S FINAL REPORT
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
7) ELECTRTCAL PERMtTTtNG AND TNSPECTTONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.